  • SME
    New Crystal Springs Bypass (Polhemus) Tunnel—Design Challenges

    By Roy C. Fedotoff, Jon Hurt, Gregg Sherry, Gilbert Tang

    The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus)Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC’s $4.3 billion capit

    Jan 1, 2007

  • DFI
    Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - Summary

    By Francis D. Leathers

    Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform

    Jan 1, 1994

  • DFI
    Careful And Controlled Underpinning Methods In Restoration Of Damaged Houses In The Old Town Of Stockholm

    By T. Iwanowski

    Stress wave measurements and calculations are often used to make a safe determination of the bearing capacity and the integrity of driven piles. Some applications to the restoration of old buildings i

    Jan 1, 1991

  • SME
    Intelligent Cable Shovel Excavation In Surface Mining

    By S. Frimpong

    The cable shovel excavator is used for primary production in many surface mining operations. A major problem in shovel excavation is the variability of material diggability, resulting in varying mech

    Jan 1, 2003

  • AUSIMM
    Sulphuric Acid Production at Port Pirie

    The production of sulphuric acid at Port Pirie by the contact process began in March 1924 with the commissioning of the Electrolytic Zinc Co.'s roasting and acid plant. This plant, operated by B.

    Jan 1, 1956

  • CIM
    Monitoring of Highwall Stability at the Dome Open Pit

    By John G. Henning

    The Porcupine Joint Venture operates the Dome Mine in South Porcupine, Ontario. Dome underground began production in 1910. It is the longest continuous operating gold mine in Canada, producing in exce

    May 1, 2004

  • CIM
    The activation of magnesia in serpentine by calcination and the chemical utilization of asbestos tailings-a review

    By R. Le Houillier, M. Nagamori, A. J. Plumpton

    "Asbestos tailings are a typical serpentine, hydrated magnesium silicate, consisting primarily of antigorite and a few per cent of unrecovered fibrous chrysotile. Serpentine has unique thermal propert

    Jan 1, 1980

  • AUSIMM
    Tin-Tungsten Mineralization at Moina, Tasmania

    This study of the tin-tungsten ore of the Shepherd and Murphy Mine, in central northern Tasmania, was originally undertaken at the request of the Moina Tungsten-Tin Mining Co., N.L., as part of the re

    Jan 1, 1958

  • CIM
    Concentrator upgrade program at the Iron Ore Company of Canada, Carol Lake Concentrator: concentrator upgrade testing program; concentrator flowsheet development

    By Martin Nevens

    "In 1998, the Iron Ore Company of Canada initiated an aggressive program to improve the performance of its Carol Lake Concentrator located in Labrador City, Newfoundland. This program was termed the C

    Jan 1, 2002

  • CIM
    In Kiruna mineral processing starts underground - bulk sorting by LIF

    By Åke Krukka, Heribert F. Broicher

    "The iron ores of the Kiruna Mine in Sweden are of exceptional quality but for the phosphorus content in certain zones of the orebody. The prevention of mixing ores high in phosphorus with those low i

    Jan 1, 2002

  • NIOSH
    RI 3262 Progress Reports – Metallurgical Division 9. Thermodynamic Data on Metallurgically Important Compounds of Lead and the Antimony-Group Metals and their Applications

    By Charles G. Maier

    "INTRODUCTION The use of thermodynamic calculations to answer practical problems in metallurgy, especially those that are relatively difficult to test experimentally, is rapidly becoming a conventiona

    Dec 1, 1934

  • SME
    Modeling helps tame surges in rapidly filling storage tunnels

    By Peter Klaver

    Deep tunnels have been used for decades for the temporary storage of large volumes of urban runoff, both storm water and combined sewer overflow (CSO). Tunnels are attractive because they reduce surfa

    Jan 3, 2010

  • AUSIMM
    Notes on a Railway Tunnel Carried on Timber

    The timber township of Powelltown, Victoria lies N.E. of Yarra Junction, 60 miles east of Melbourne and in the site of the mill of the Victorian Hardwood Company Proprietary Ltd.A lift gauge railway o

    Jan 1, 1925

  • AUSIMM
    Common pitfalls in sampling iron ore

    By R J. Holmes

    The procedures and equipment used for sampling iron ore process streams have generally improved in recent years. However, there are a number of areas where significant issues still commonly occur, inc

    May 9, 2017

  • SME
    Railroad Interface Management For Mta East Side Access Project Tunnels And Structures

    By Michael A. Piepenburg

    The East Side Access (ESA) Project will extend Long Island Rail Road (LIRR) into midtown Manhattan via 11 km of tunnels, a new terminal station and associated support facilities. In addition to the ha

  • AUSIMM
    Commissioning and Operating an Autogeneous Mill at Karowe Diamond Mine

    By N A. Sikwa, L M. van Niekerk, G N. Ndlovu

    In June 2012, Lucara Diamond Corporation officially commissioned its Karowe Diamond Mine in Letlhakane, Botswana. The processing plant circuit incorporates variable speed autogeneous milling, a first

    Jul 15, 2013

  • NIOSH
    RI 9458 - Behavior of Simulated Longwall Gob Material

    By Reno M. Pappas, Christopher Mark

    This report presents results of a U.S. Bureau of Mines study of longwall gob material. The objective of this work was to determine material stiffness properties of the gob for use in numerical models

    Jan 1, 1993

  • NIOSH
    Recycled Metals In The United States - A Sustainable Resource - Introduction

    Seventy-three of the 90 naturally occurring elements that are found in the earth's crust are metals or metalloids. The quantities of metals used annually in the United States range from about 100

    Jan 1, 1993

  • CIM
    Real Time Performance Management in Metallurgical Operations

    By O. A. Bascur, J. Patrick. Kennedy

    "The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic

    Jan 1, 2004

  • SME
    Design Evaluations for the San Vicente Pipeline Tunnel

    By Zach Ahinga, Mike McRae, Dave Hopkins, Steve Klein

    The San Vicente Pipeline project involves the construction of an 8-1/2 foot diameter water pipeline in an 11 mile long tunnel in San Diego, California. The tunnel will be excavated in extremely variab

    Jan 1, 2005