Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Selecting and Using Large Walking Draglines for Deeper Overburden StrippingBy N. B. Pundari
Proper selection of large walking draglines, based on sound engineering principles and field experience, has not kept pace with the large capital expenditures needed to buy these stripping machines. T
Jan 4, 1981
-
The Application of the Environmental Assessment Procedures to Licensing for Minerals, Petroleum and Geothermal EnergyBy D Thorburn
This paper reviews the history of environmental assessment in New Zealand with reference to mineral developments. Emphasis is given to larger more controversial projects particularly metal mines. The
Jan 1, 1990
-
Significance of Ion Interactions in Flotation in Saline and Brine SolutionsSignificance of Ion Interactions in Flotation in Saline and Brine Solutions
Sep 13, 2010
-
Portland, Oregon’s Other CSO TunnelsBy Michelle Lostra, Red Blanchette, Jan Babendererde, Greg Colzani
The City of Portland’s Westside CSO Project is constructing a deep tunnel system to reduce combined sewer overflows (CSO) from entering the Willamette River. Several kilometers of microtunneled pipeli
Jan 1, 2005
-
Tapertube ™ PilesBy Alexander Filotti, Stanley Merjan
"Abstract. The paper shows the benefits and accomplishments of this relatively new but established product on the pile foundations market in the United States. The first part of the paper describes ge
Jan 1, 2014
-
RI 3453 Relative Air Dustiness During Cycle Of Operations At Mount Weather Testing Adit ? Introduction (df2df58f-379d-486b-93fa-fed333849f65)By John A. Johnson
For the purpose of comparing the amounts of dust produced by various mining operations, samples of atmospheric dust were collected during a complete cycle of drilling, blasting and mucking at or near
Jan 1, 1939
-
Monitoring Foundation Response To Subsidence Using A Tiltmeter - Objective[Determine how subsidence resulting from underground coal mining affects surface structures, and evaluate the usefulness s of the tiltmeter for monitoring foundation movement. Approach The Burea
Jan 1, 1988
-
Metallurgical Control ù Case StudiesBy Y Yang
This paper discusses various issues surrounding the metallurgical control for furnaces, especially focusing on processes with long time-constants and æmetallurgical memoriesÆ. Examples will focus on f
Jan 1, 2000
-
Foundations For The Sohio Corporate Headquarters - A Presentation At The Deep Foundations Institute Annual Meeting Cleveland, Ohio, November 1983By Clyde N. Baker
Foundations for the Sohio Corporate Headquarters in downtown Cleveland have column loads of 11,400 kips, which increase to 15,000 kips with wind loading. An extensive exploratory program was conducted
Jan 1, 1984
-
The Geology of the Manto Verde Mine, Atacama Desert, ChileThe Manto Verde mine is found in the coastal ranges of the Atacama desert, 1000 km north of Santiago,
Jan 1, 1992
-
RI 9426 - Dust Considerations When Using Belt Entry Air to Ventilate Work AreasBy Robert A. Jankowski, J. Drew Potts
In this U.S. Bureau of Mines study, four underground respirable dust surveys were conducted to determine factors affecting belt entry dust levels and how using belt air to ventilate work areas affecte
Jan 1, 1992
-
Integrated comminution and flotation neurocontrol using evolutionary reinforcement learningBy A. v. E. Conradie, I. Nieuwoudt
Comminution and flotation circuits are frequently perturbed by disturbances, such as feed particle size variations, ore hardness and varying mineral liberation, which can have a significant impact on
Jan 1, 2003
-
Planning And Teamwork Lead To Successful Start-Up At Batu HijauBy P. Hickey, J. Spenceley, T. J. DeMull
Development of the Batu Hijau Project was successfully completed in the fourth quarter of 1999 with the final handover and start-up of ore processing facilities. The development project had started m
Jan 1, 2001
-
Effect of inorganic chloride on spontaneous combustion of coalBy Y. I. Yang, Y. -B. Tang, D. -J. Ma
Chlorine-containing minerals are commonly present in coal. Associated minerals such as pyrite can undergo exothermic reactions. Consequently, it is of great significance to study the effect of inorgan
Jan 1, 2015
-
Exploration Implications from Variations in Whole-rock and Mineral Chemistry around the Volcanic-hosted Massive Sulfide Deposits of the Que-Hellyer Volcanics, Tasmania, AustraliaBy S M Richardson, A W McNeill, J B. Gemmell
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Hellyer, Fossey, Que River and Mount Charter volcanic-hosted massive sulfide (VHMS) dep
Mar 18, 2015
-
Foundations For The M25 Motorway Near To Heathrow AirportBy John F. Spence
Ever since opening, the M25 motorway to the west of London has carried a rapidly increasing volume of traffic. The section of M25 between the junctions with the M3 and M4 motorways, which is in the ne
Jan 1, 2007
-
OFR-122(5)-78 Advancing Oil Shale Mining Technology: Program Evaluation - Economic Mine ModelsBy G. F. Kuncir
This volume was prepared in support of an evaluation of the Advancing Oil Shale Mining Technology Program performed by The Aerospace Corporation under a Bureau of Mines contract. The evaluation is des
Jan 1, 1977
-
IC 8237 Bureau Of Mines Research And Technologic Work On Coal, 1963 ? Introduction (36a83d87-c8b4-46b2-ae0d-6c9d71d3add5)Coal research and technologic work by the Bureau of Mines covers a broad program of investigation aimed at conservation and utilization of this important natural resource. Conservation is served by a
Jan 1, 1964
-
IC 8237 Bureau Of Mines Research And Technologic Work On Coal, 1963 ? IntroductionCoal research and technologic work by the Bureau of Mines covers a broad program of investigation aimed at conservation and utilization of this important natural resource. Conservation is served by a
Jan 1, 1964
-
Construction And Geological Engineering Of An Underground Ore BinBy J. F. T. Agapito, G. P. Bratton
A 16 m by 4.7 m by 24.5 m (52 ft by 15.5 ft by 80.5 ft) underground ore bin was constructed at an 810 m (2660 ft) overburden depth in poor quality, faulted and altered intrusive rocks at Molycorp&apos
Jan 1, 1985