Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
New Crystal Springs Bypass (Polhemus) Tunnel—Design ChallengesBy Roy C. Fedotoff, Jon Hurt, Gregg Sherry, Gilbert Tang
The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus)Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC’s $4.3 billion capit
Jan 1, 2007
-
Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - SummaryBy Francis D. Leathers
Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform
Jan 1, 1994
-
Careful And Controlled Underpinning Methods In Restoration Of Damaged Houses In The Old Town Of StockholmBy T. Iwanowski
Stress wave measurements and calculations are often used to make a safe determination of the bearing capacity and the integrity of driven piles. Some applications to the restoration of old buildings i
Jan 1, 1991
-
Intelligent Cable Shovel Excavation In Surface MiningBy S. Frimpong
The cable shovel excavator is used for primary production in many surface mining operations. A major problem in shovel excavation is the variability of material diggability, resulting in varying mech
Jan 1, 2003
-
Sulphuric Acid Production at Port PirieThe production of sulphuric acid at Port Pirie by the contact process began in March 1924 with the commissioning of the Electrolytic Zinc Co.'s roasting and acid plant. This plant, operated by B.
Jan 1, 1956
-
Monitoring of Highwall Stability at the Dome Open PitBy John G. Henning
The Porcupine Joint Venture operates the Dome Mine in South Porcupine, Ontario. Dome underground began production in 1910. It is the longest continuous operating gold mine in Canada, producing in exce
May 1, 2004
-
The activation of magnesia in serpentine by calcination and the chemical utilization of asbestos tailings-a reviewBy R. Le Houillier, M. Nagamori, A. J. Plumpton
"Asbestos tailings are a typical serpentine, hydrated magnesium silicate, consisting primarily of antigorite and a few per cent of unrecovered fibrous chrysotile. Serpentine has unique thermal propert
Jan 1, 1980
-
Tin-Tungsten Mineralization at Moina, TasmaniaThis study of the tin-tungsten ore of the Shepherd and Murphy Mine, in central northern Tasmania, was originally undertaken at the request of the Moina Tungsten-Tin Mining Co., N.L., as part of the re
Jan 1, 1958
-
Concentrator upgrade program at the Iron Ore Company of Canada, Carol Lake Concentrator: concentrator upgrade testing program; concentrator flowsheet developmentBy Martin Nevens
"In 1998, the Iron Ore Company of Canada initiated an aggressive program to improve the performance of its Carol Lake Concentrator located in Labrador City, Newfoundland. This program was termed the C
Jan 1, 2002
-
In Kiruna mineral processing starts underground - bulk sorting by LIFBy Åke Krukka, Heribert F. Broicher
"The iron ores of the Kiruna Mine in Sweden are of exceptional quality but for the phosphorus content in certain zones of the orebody. The prevention of mixing ores high in phosphorus with those low i
Jan 1, 2002
-
RI 3262 Progress Reports – Metallurgical Division 9. Thermodynamic Data on Metallurgically Important Compounds of Lead and the Antimony-Group Metals and their ApplicationsBy Charles G. Maier
"INTRODUCTION The use of thermodynamic calculations to answer practical problems in metallurgy, especially those that are relatively difficult to test experimentally, is rapidly becoming a conventiona
Dec 1, 1934
-
Modeling helps tame surges in rapidly filling storage tunnelsBy Peter Klaver
Deep tunnels have been used for decades for the temporary storage of large volumes of urban runoff, both storm water and combined sewer overflow (CSO). Tunnels are attractive because they reduce surfa
Jan 3, 2010
-
Notes on a Railway Tunnel Carried on TimberThe timber township of Powelltown, Victoria lies N.E. of Yarra Junction, 60 miles east of Melbourne and in the site of the mill of the Victorian Hardwood Company Proprietary Ltd.A lift gauge railway o
Jan 1, 1925
-
Common pitfalls in sampling iron oreBy R J. Holmes
The procedures and equipment used for sampling iron ore process streams have generally improved in recent years. However, there are a number of areas where significant issues still commonly occur, inc
May 9, 2017
-
Railroad Interface Management For Mta East Side Access Project Tunnels And StructuresBy Michael A. Piepenburg
The East Side Access (ESA) Project will extend Long Island Rail Road (LIRR) into midtown Manhattan via 11 km of tunnels, a new terminal station and associated support facilities. In addition to the ha
-
Commissioning and Operating an Autogeneous Mill at Karowe Diamond MineBy N A. Sikwa, L M. van Niekerk, G N. Ndlovu
In June 2012, Lucara Diamond Corporation officially commissioned its Karowe Diamond Mine in Letlhakane, Botswana. The processing plant circuit incorporates variable speed autogeneous milling, a first
Jul 15, 2013
-
RI 9458 - Behavior of Simulated Longwall Gob MaterialBy Reno M. Pappas, Christopher Mark
This report presents results of a U.S. Bureau of Mines study of longwall gob material. The objective of this work was to determine material stiffness properties of the gob for use in numerical models
Jan 1, 1993
-
Recycled Metals In The United States - A Sustainable Resource - IntroductionSeventy-three of the 90 naturally occurring elements that are found in the earth's crust are metals or metalloids. The quantities of metals used annually in the United States range from about 100
Jan 1, 1993
-
Real Time Performance Management in Metallurgical OperationsBy O. A. Bascur, J. Patrick. Kennedy
"The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic
Jan 1, 2004
-
Design Evaluations for the San Vicente Pipeline TunnelBy Zach Ahinga, Mike McRae, Dave Hopkins, Steve Klein
The San Vicente Pipeline project involves the construction of an 8-1/2 foot diameter water pipeline in an 11 mile long tunnel in San Diego, California. The tunnel will be excavated in extremely variab
Jan 1, 2005