Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • TMS
    Advanced Image Analysis Of Molten Slag For Process Control

    By Subagyo

    The condition of slag in a pyrometallurgical reactor is vital to ensuring control of the process. A new technique based on multivariate image analysis (MIA) of digital images has been developed to pro

    Jan 1, 2003

  • TMS
    Electric Slag Furnace Dimensioning

    By Mark William Kennedy

    "Electric furnaces containing high quantities of slag are applied in many areas of pyrometallurgy, often for smelting or slag cleaning. A variety of ratios or rules of thumb have been employed in the

    Jan 1, 2012

  • TMS
    Developments In Manganese Ferroalloy Research And Production In The Last 25 Years

    By Merete Tangstad, Ragnar Tronstad

    Ferromanganese production in electrical furnaces is quite an old process. However, as the furnaces are getting bigger, the requirements of cost, yield, product quality, emissions and security are rais

    Jan 1, 2014

  • TMS
    Minimum Numerical Model of a Peirce-Smith Converter

    By Luis Hoyos-Reyes, Jesus Gonzalez-Trejo, Adriana Cervantes-Clemente, Marco Gutierrez-Villegas, Manuel Palomar-Pardave, Cesar Real-Ramirez

    Recent improvements on Peirce-Smith Converters (PSC) have combined numerical and physical simulations. However, most of the physical simulations have been carried out in cold-water models with only on

    Jan 1, 2009

  • TMS
    Process Mineralogy of Lead Smelter and Electric Arc Furnace Dusts

    By Richard D. Hagni

    An enhanced Interest in pyrometallurgical dusts has recently emerged due to increased world-wide environmental concerns. Mineralogical study of dusts samples from lead sinter plants. lead smelters, an

    Jan 1, 1991

  • TMS
    Reduction Behavior Of BOF Type Slags By Solid Carbon

    By Sung-Mo Jung

    Experiments were carried out on a system with artificially prepared slags in a graphite crucible, in order to examine the possibility of recycling BOF slags produced in the steelmaking process. More t

    Jan 1, 2006

  • TMS
    The Link Between Gravity Recovery And Hydrometallurgy: The Case Of Gold

    By A. R. Laplante

    Recent developments in gold metallurgy are used to illustrate how the interface between gravity recovery and hydrometallurgy has evolved in recent years. Of particular interest is the use of gravity r

    Jan 1, 2003

  • TMS
    Electric Arc Smelting at RSR Corporation

    By Don Eby

    The application of electric arc furnace smelting of lead, antimony, and tin bearing slag from a reverberatory furnace will be discussed. The selection procedure for the 4.0 MVA electric arc furnace in

    Jan 1, 1990

  • TMS
    Operation Of The CONTOP Process At The Asarco El Paso Smelter

    By Martin Brueggemann

    In 1993, the El Paso Smelter began operation of the first commercial CONTOP copper smelting furnace. The CONTOP process was chosen for the plant modernization due to its low capital cost and the ease

    Jan 1, 1998

  • TMS
    SiC Formation in Submerged Arc Furnaces Producing Silicomanganese

    By Per Anders Eidem, Merete Tangstad, Jens Davidsen

    "During excavations of submerged arc furnaces producing silicomanganese, silicon carbide (SiC) has been found. Contributing to the size of the inactive area of the furnace, the active area of the furn

    Jan 1, 2012

  • TMS
    Improvements on Converter Operating Practice at Mufulira Smelter

    By John Sakala, Jeyapandian Sasikumar, Sydney Kwalela

    The Isasmelt Furnace was commissioned in September 2006 with a concentrates treatment capacity of 850,000 tonnes per annum. However, the converter section became a bottleneck to the high throughput. O

    Jan 1, 2012

  • TMS
    Selecting An Economical And Safe Tailings Disposal

    By Han Ilhan

    This paper discusses and describes aspects of a cost effective and safe tailings impoundment selection. In light of the current low metal prices and recent tailings embankment failures around the worl

    Jan 1, 1999

  • TMS
    The Case for the Copper Mini Smelter

    By R. J. Wesely

    In recent years the trend in copper smelting has been to expand existing smelters to increase their throughput. New smelters under consideration are large, typically in excess of 200,000 tons per year

    Jan 1, 2000

  • TMS
    The Study On Vacuum Degassing Process Of Alv55 Alloy

    By Yong Xian, Zhaohui Sun, Honggang Zhong, Qijie Zhai, Jie Sun

    Vacuum refining is admitted as an effective means to remove impurities in the process of alloy smelting. In this paper, Orthogonal and single factor experiments were carried out to investigate effects

    Jan 1, 2015

  • TMS
    Reducing Mercury Emissions in Small Scale Mining-Experiences from South American

    By Herman Wotruba

    Mercury emissions and other environmental impacts in small-scale gold mining are a world-wide problem. "Clean" or better: "Cleaner" technologies have -apart from being environmentally sound -to guaran

    Jan 1, 2003

  • TMS
    Electropurification of Zinc Leaching Solution

    By S. Goto, S. Yamashita, K. Hata

    "The average consumption of zinc dust for purification of zinc leaching solution is more than 25 kg per tonne of electrolytic zinc. Authors proposed to remove impurities in zinc leaching solution by e

    Jan 1, 1997

  • TMS
    Recovery Of Iron From Hematite-Rich Diasporic-Type Bauxite Ore

    By Lin Yang, Yuanbo Zhang, Zhuoxuan Li, Guanghui Li, Jinghua Zeng, Tao Jiang

    A technique has been proposed for recovering iron from hematite-rich diasporic-type bauxite ore in this study. Direct reduction roasting followed by low intensity wet magnetic separation process was c

    Jan 1, 2015

  • TMS
    Dissolution Kinetics of Steelmaking Slag and its Promotion for the Growth of Algae

    By Xiaohui Li, Lianyun Liu, Hongmin Zhu, Chunfang Zi, Kai Huang, Hongjie Li

    "The dissolution kinetics of steelmaking slag in pure water was studied, and the relative influential factors were investigated. The dissolution behavior of slag particles in water was well described

    Jan 1, 2011

  • TMS
    Partially Reduced Feedstocks and Blast Furnace Ironmaking Carbon Intensity

    By P. Chris Pistorius

    "Use of coke in blast furnace ironmaking is the main origin of carbon dioxide emissions from integrated steelmaking. Use of pre-reduced iron feedstocks would reduce the coke rate and, if pre-reduction

    Jan 1, 2012

  • TMS
    Synthesis Of Rare Earth Metals By Mechanical Alloying

    By P. G. McCormick

    The refining of rare earth metals by the direct solid state reduction of their respective chlorides during mechanical alloying has been studied. Erbium and gadolinium were synthesised by milling their

    Jan 1, 1992