Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Application Of Time Domain Reflectometry To Ground Control

    By Kevin M. Connor, O&apos

    An example application is presented in which Time Domain Reflectometry (TDR) was utilized to monitor roof strata movements during pillar extraction in a potash mine. The study was initiated when Weste

    Jan 1, 1990

  • SME-ICGCM
    Investigation And Analyses Of Sudden Outbursts Of Gas During Driving Of Mine Roadways (7ec61323-5f2c-44cc-b7ed-dc20f9515d9b)

    By Uros Bajzelj

    When driving mine roadways in the vicinity of tectonic disturbances and fault zones, sudden outbursts of gas, along with ejections of fine coal, occur. Substantial dynamic changes occur around the roa

    Jan 1, 1992

  • SME-ICGCM
    Ground Control Problem Associated with Longwall Mining of Developed Pillars

    By T. N. Singh

    Board and pillar system of mining has beer, practised in India in view of abundant availability of cheap labour force, low investment and quick return. Subsequently, selective mining from thick seems

    Jan 1, 1984

  • SME-ICGCM
    3D FEM Simulation For Fully Grouted Bolts

    By Khaled Morsy

    Most of the available numerical codes simulating the reinforcing effect of fully grouted bolt are accomplished by a series of bar elements which are connected along their length to the host rock by sh

    Jan 1, 2004

  • SME-ICGCM
    Tailgate Support Practice In U.S. Longwall Mines - A Survey

    By S. S. Peng

    To acquire knowledge on the general trend of primary and supplemental supports used in tailgates of US longwall mines a survey of 76 mines with 86 longwall panels was carried out in the summer of 1993

    Jan 1, 1994

  • SME-ICGCM
    Field Testing of the Fully Grouted Thrust Tensioned Bolts

    By Kot Unrug

    Fully grouted tensioned bolts provide a desirable compressive of laminated roof and bondage along the entire bolt length, at the same time the entire surface of the hole is protected against penetrati

    Jan 1, 2002

  • SME-ICGCM
    Long Term Stability Of Mine Workings In Soft Floor Environment: Geomechanical Investigations At Cooranbong Colliery

    By Vasundhara

    Underground coal mining in soft floor environments has often led to strata control problems ranging from small scale issues such as floor heave which disrupts traffic and ventilation, rib spalling and

    Jan 1, 2001

  • SME-ICGCM
    Re-Use of Rectangular Bolted Roadways in a Cover Depth > 1000 M

    By Klaus Opolony

    The German coal industry operates a multi-seam extraction system, with average working depths currently around 1,000 meters. The gate roads serving the longwalls are often used for a second time - a p

    Jan 1, 2002

  • SME-ICGCM
    Investigation Of Subsidence Event Over Multiple Seam Mining Area (b421bdde-19e7-491b-bc6d-a4cce9ef42b4)

    By Kewal K. Kohli

    An investigation was performed to determine the sequence of events which caused the 1987 surface subsidence and related damage to several homes in Walker County, Alabama, USA (see Figure 1). Surface a

    Jan 1, 1992

  • SME-ICGCM
    Application Of Sliding Roof Bar Powered Support For Thick-Seam Coal Mining

    By Zhang Liandong

    Roof control in thick-seam mining has long been a difficult problem in mine design and coal mining. In the early 1980's, through ground control instrumentation and investigation the rules of r

    Jan 1, 1990

  • SME-ICGCM
    Experimental Study of Acoustic Emission Characteristics for Burst-prone Coal/Rock Fracture Process

    By Liu Changyou

    This paper analyzes experimentally the stress-strain relationship and the characteristics and variation trends of acoustic emission signals of the medium- and high-burst-prone coal/rock fracture proce

    Jan 1, 2003

  • SME-ICGCM
    Yielding Cement Roof Supports for Longwall Mining

    By Alan A. Campoli

    Fosroc continues as a leader in the development of cementitious technology for the mining industry. The considerable expertise accumulated in the development of the Fm cement line has been employed in

    Jan 1, 1997

  • SME-ICGCM
    The Introduction of Uk Rockbolting Technology into Coal MinesAround the World

    By Graham Daws

    The introduction of UK rock bolting technology has been applied in many large underground coal mines around the world. This paper explains the methods that have been applied for its successful introdu

    Jan 1, 2011

  • SME-ICGCM
    A Study on Geotechnical Risks in Interaction Between Open-Pit and Block Caving

    By Ezzeddin Bakhtavar

    There are several geotechnical challenges and risks inherent in the interaction between the open-pit and block cave mining environments. This is especially true when they have to work simultaneously f

    Jan 1, 2011

  • SME-ICGCM
    A Comparison of Numerical Methods and Analytical Methods in Determination of Tunnel Walls Displacement ? A Case Study

    By Behdeen Oraee-Mirzamani

    Tunnel stability has an important role in the production process of an underground coal mine. There are various methods for analysing tunnel stability, such as numerical methods and analytical methods

    Jan 1, 2013

  • SME-ICGCM
    Geotechnical Strata Characterisation Using Geophysical Borehole Logs

    By Terry Medhurst

    Geophysical logging is routinely undertaken as part of most Australian coal mining exploration programs. Typically, the main application is the determination of coal seam depth and the qualitative est

    Jan 1, 2005

  • SME-ICGCM
    Definition of Ultra-close Multiple-seams and its Ground Pressure Behavior

    By Baisheng Zhang

    The definition of Ultra-close multiple seams as defined by the floor disturbance depth, h, due to mining in the upper seam is proposed: it refers to those coal seams that are spaced very closely, i.e.

    Jan 1, 2005

  • SME-ICGCM
    Improved Pull out Strength of Fully Grouted Roof Bolts through Hole Geometry Modification

    By Luis Giraldo

    Rock bolt installation characteristics near roof falls have been identified as contributing to failure. One documented and regularly occurring failure mechanism is loss of anchorage between the grout

    Jan 1, 2005

  • SME-ICGCM
    Using Foaming Grout to Stabilize a Ventilation Raise in Very Poor Rock

    By John Magyar

    Special foamed cements were used to stabilize and secure caving ground in a newly-reamed 12.5-ft diameter underground ventilation raise. Two zones of very poor Rock Mass Rating (RMR) material were enc

    Jan 1, 2005

  • SME-ICGCM
    Development of the Laboratory Short Encapsulation Pull Test for a Revised British Standard on Rock Reinforcement Components Used in Coal Mining

    By D. Bigby

    The current British Standard on rock reinforcement components used in coal mining (BS7861:1996) employs the axial double embedment tensile PET) test to determine the main system load transfer performa

    Jan 1, 2005