Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Underground Geologic Evaluation Of The Grossschloppen Vein Uranium Deposit, West Germany

    By Stephen C. Moore

    The Grossschloppen vein-uranium deposit, Bavaria, West Germany, was examined utilizing underground workings during 1980-82 by Esso Erz GMbH, an affiliate of Exxon Minerals Company (EMC). Geologic eva

    Jan 1, 1983

  • SME
    The Role Of The Japanese Trading Company In Setting World Coal Prices

    By Peter J. Szabo

    In 1980, a caravan of representatives of Japanese trading companies debarked on the shores of the United States bearing gifts of watches, electronic games, and radios. In early 1983, we find in a park

    Jan 1, 1984

  • SME
    Field Evaluation of an Inline Wet Scrubber for Reducing Float Coal Dust on a Continuous Miner Section

    By J. R. Patts, L. D. Patts, S. J. Janisko, T. Barone

    "Controlling float coal dust in underground coal mines before dispersal into the general airstream can reduce the risk of mine explosions while potentially achieving a more efficient and effective use

    Jan 1, 2015

  • SME
    A Non-Segregating "Rocky Paste Fill'' (RPF) Produced by Co- Disposal of Cemented De-Slimed Tailings Slurry and Graded Rockfill

    By Ian Sheppard, Kugan Kuganathan

    The Mount Isa Rocky Paste Fill (RPF) was one of the five fill options investigated for the Enterprise Mine filling between June 1996 and September 1996. Co-disposal of deslimed cemented tailings (CHF)

    Jan 1, 2001

  • SME
    Hauling Coal Into The 21st Century (769c18a2-0d06-4ce7-9c68-865f00b87cb8)

    When I wrote the Railroad portion of "Mining Engineering" magazines 94 Powder River Basin (PRB) Coal Article I described to you some definite destinations the Railroads had in mind. As with many desti

    Jan 1, 1998

  • SME
    Distributed digital control at Cuajone

    By S. Donges, P. L. Dunstan, B. J. Huls

    The commissioning of a distributed digital control system for the grinding circuit at Cuajone was completed by mid-August 1985. Development of a successful strategy, excellent operator acceptability,

    Jan 1, 1988

  • SME
    Predicting The Moisture Content Of Coals Dewatered By Centrifuges

    By B. J. Arnold

    Utility coal specifications usually contain a requirement for a maximum moisture content in order to prevent coal handling problems and to minimize evaporative losses in the boiler. As most coal clean

    Jan 1, 1996

  • SME
    Design of a Novel Auto-Rotating UAV Platform for Underground Mine Cavity Surveying

    By J. A. Marshall

    "INTRODUCTION The purpose of this paper is to investigate the potential for use of UAVs in underground mines and present a prototype design for a novel autorotating UAV platform for underground 3D dat

    Jan 1, 2017

  • SME
    Training Programs Can Generate Measurable Value - SME Annual Meeting 2025

    By Claudia Castillo, Katja Freitag, Jan Cilliers, Diana Drinkwater, Robert Seitz

    The talent gap in mining is not a new challenge. Mining companies continue to seek innovative ways to attract, develop and retain talent, and younger workers are looking for opportunities to develop t

    Feb 1, 2025

  • SME
    Geologic Mapping Techniques And Applications At Kennecott's Utah Copper Division Open Pit Mine At Bingham Canyon, Utah

    By Wilbur H. Smith

    Geologic mapping techniques at the Bingham Mine have evolved as rapidly expanding applications of geological data have caused new methods to be utilized. The most significant changes in method have be

    Jan 1, 1968

  • SME
    Particle-Size Analysis

    By B. H. Kaye

    Particle-size Distribution Specifications for Particulates. Feed to and finished products from size-reduction operations are defined in terms of the particulate sizes involved. It is also well to k

    Jan 1, 1985

  • SME
    Processing of peridotite rocks of chromite ore overburden into magnesium salts and micro silica

    By KALLAM VK REDDY, VADAPALLI SANJANA, Veerendra Singh, Gajanan Kapure

    Mining activity around the world has increased significantly to meet stepped-up demand for various metals [1]. Apart from the target minerals, mining also generates huge amounts of unwanted minerals t

  • SME
    Potential For Deep Underground Limestone Mining In Indiana

    By Donald D. Carr

    Four counties in Indiana--LaPorte, Vigo, Vanderburgh, and Switzerland--have potential for deep underground limestone mining because they are in or are near high population areas and have no surface-mi

    Jan 1, 1980

  • SME
    Mercury Removal From Gold Cyanide Leach Solution (ce0b0549-256f-40e4-83de-6d55761a7d94)

    By W. L. Staker

    The Bureau of Mines investigated selective extraction of Au and Ag from a low-grade Au ore containing Hg. Gold and silver were extracted from the ore in cyanide slurries, and Hg extraction was suppres

    Jan 1, 1983

  • SME
    Continuous Ferric Chloride Leaching Of Galena

    By J. E. Murphy

    The Bureau of Mines demonstrated ferric chloride leaching of galena concentrate on a continuous bench-scale basis. Leaching was performed at 95° C and with a contact time of 15 min. The ferric chlorid

    Jan 1, 1984

  • SME
    The Acquisition, Interpretation And Storage Of Geological And Geotechnical Parameters With Reference To Design Of Coal-Mine Layouts

    By M. Karmis

    The design of coal-mine layouts is based on the knowledge of a broad range of geological and geotechnical parameters, which must be determined from a sequence of exploration programs. It follows that

    Jan 1, 1980

  • SME
    National Mining Hall of Fame to Induct Class of 2017

    "The National Mining Hall of Fame and Museum (NMHFM) announced the 2017 National Mining Hall of Fame inductees. This year’s inductees, selected by the National Mining Hall of Fame’s Board of Governors

    Jan 8, 2017

  • SME
    Hydrology Of Taconite Production On The Mesabi Range

    By Douglas W. Barr

    Water is a necessary part of our environment. It is a biological necessity, but more than that, it is a necessary part of our life style. Those of us who live in the north woods expect water to be par

    Jan 1, 1980

  • SME
    An Overview Of The U.S. Bureau Of Mines Developments In Automated Coal Mine Roof Bolting Modules

    By J. E. Bevan

    Once mining compromises the stability of a rock mass, the dangerous task of roof bolting begins. Many attempts have been made to automate this process, but there are still many refinements that need t

    Jan 1, 1994

  • SME
    Lesson Learned During the EPB TBM Launch Using Umbilical and Muck Pump - RETC2021

    By D. Nebbia, R. Aliberti, F. Solesin

    The launch of a Tunnel Boring Machine (TBM) is one of the most challenging activity parts of the construction of a tunnel. Challenges are coming from limited space available, learning curve, concurren

    Jun 13, 2021