Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Nickel laterite processing: Recovery of nickel from ammoniacal leach liquorsBy M. J. Virnig, B. D. Boley, G. A. Wolfe, J. M. W. Mackenzie
A flowsheet for the recovery of nickel and cobalt from laterite ores was developed. The flowsheet involves acid leaching followed by hydroxide precipitation of the metal values and then releaching of
Jan 1, 2002
-
Reducing Longwall Noise With Acoustical Material On The Shields-A Preliminary AnalysisBy J. P. Rider
Along with increased production from longwall units has come the likelihood of increased worker noise exposures. In recent years, equipment has become larger, more powerful, and noisier than its prede
Jan 1, 1997
-
Continuous haulage systems for computer-assisted continuous minerBy S. K. Bhatt
This paper reviews major developments in continuous haulage technology for underground coal mines. Haulage systems in use and development are investigated through a comprehensive literature search and
Jan 1, 1991
-
Merchant Grade Phosphate Rock: Prospects For Available Supply By The Year 2000By A. Benchekroun
The phosphate mining industry is confronted everywhere in the world with financial difficulties and low prices which prohibit further investments and development of new mines even in regions with a co
Jan 1, 1995
-
Natural Language Processing for Classification of Narratives from MSHA DataBy M. Shahsavar, J. Sattarvand, J. Gomez
Mining can be categorized as a hazardous activity, considering some factors such as environmental conditions with a considerable presence of humidity, suspended particles, or falling rocks have affect
Jun 25, 2023
-
Comparison between Calculated and Actual Face Pressures in EPB TBMs—Case Studies in Seattle, WABy Ehsan Alavi, Brian Hagan, Colin LaVassar, Glen Frank, Derek Dugan, Rick Capka, Lisa Mori
"Tunnel face instability is one of the most common issues in EPB tunneling. The evaluation of an ideal face support pressure is a critical element in the design and construction phases of EPB tunnelin
Jan 1, 2016
-
TBM Operation Challenges at DTL3 C931 Project in SingaporeBy Bo Kyung Sim, Dae Young Kim, Jae Won Lee, Ebrahim Farrokh
"The contract C931 of the downtown line 3 (DTL3) mass rapid transit system of Singapore includes half a kilometer twin tunnels running between Mattar and Macpherson stations. An EPB TBM of 6.6 m diame
Jan 1, 2016
-
Copenhagen Cityringen Project: Urban Mining Challenges in Contaminated GroundBy Valerio Violo, Antonio Raschillà, Livia Cicinelli
"The Cityringen project foresees the construction of a new circular metro line in and around the city center of Copenhagen. Both drives, the north and the south one, required the TBMs to be equipped i
Jan 1, 2016
-
That Which We Cannot SeeBy James Stewart
"THAT WHICH WE CANNOT SEE" INTRODUCTION Often it has been stated that the greatest of all fears is fear itself - fear created only by that which we cannot see or by that which we fail to unders
Jan 1, 1981
-
Kennecott Utah Copper Corporation Information SystemsBy Wayne Wride, Amy Lamb, Debra Sonntag
In today's "information age", we have the ability to collect volumes of data about a company's performance. The challenge is to turn that data into information employees can understand and u
Jan 1, 2000
-
The Economics Of Heap Leaching (0dd3c78e-34ca-448f-a1c7-0ee3494c5657)By R. S. Shoemaker
Expanded markets for copper in the past few years and a consequent search for new ore bodies have revitalized the widely known but seldom applied method of producing copper called heap leaching. This
Jan 1, 1968
-
Economic Importance Of Michigan Dune Sands ? IntroductionBy H. L. Bourne
The sand dunes which line the east shore of Lake Michigan resulted after the last, or Wisconsin, glacial period in Michigan. Melt-water streams carried vast quantities of glacial debris to the near sh
Jan 1, 1975
-
Metallogenesis of Central AmericaBy Enrique Levy
The publication from which this paper was abstracted is the first at-tempt to correlate all the metallogenic deta compiled by the author for the preparation of the 1:2,000,000 Metallogenic Map of Cent
Jan 1, 1971
-
Comparison of Performance of Soil Mixwall and Conventional Bracing System for Station Excavations in AlluviumBy Timothy P. Smirnoff, Anthony Stirbys, Amanda Elioff
The construction of the continuing expansion of the Los Angeles Metro System has required the construction of eight new station structures. One contractor proposed, as a construction alternative for
Jan 1, 1997
-
Glass Sand Prospects And ExplorationBy Thomas E. Shufflebarger
Definition of glass sand prospects may be modified by constraints which range from demography to critically important product-control. Characteristics of usable raw materials, physical and chemical,
Jan 1, 1983
-
DCCR Case Study on Guidelines for Achieving an Extended Design Life in CSO ProjectsBy Moussa Wone, William Levy, Christopher Caruso, Zachary Spera, Thomas Hennings, Richard Stacy Kinchen, PE Joel Kantola
"Owners constructing new combined sewer overflow (CSO) systems increasingly seek to have project design lives of 100 or more years in response to the growing size, complexity, and cost to construct an
Jan 1, 2016
-
Acoustic Drying Of Ultrafine Coal - IntroductionBy Harold V. Fairbanks
This investigation included a study of three different methods for the acoustic drying of ultrafine coals. Ultrafine coal being defined as coal which passes through a 100 mesh sieve. The first met
Jan 1, 1970
-
The Integrity of Samples Acquired by Deep Reverse Circulation Drilling Below the Water Table at the Chimney Creek Project, NevadaBy A. Wright
Gold Fields Mining Corporation is presently evaluating gold mineralization beneath thick, wet alluvium at the Chimney Creek Project, Nevada. Contamination of reverse circulation samples has been visua
Jan 1, 1991
-
Preparing The Section Foreman For His Full Responsibilities (d286b901-c48c-461e-8c03-6c7625dfdf28)By R. L. Grayson
The health and safety of employees, efficiency of the operating system and production are paramount goals in underground coal mining. The section foreman assumes responsibility for making his part of
Jan 1, 1985
-
Repair of a Failed Reinforced Concrete Adit Tunnel with Carbon Fiber Wrap - NAT2024By Daniel Willis, Ryan O’Connell
An 8-foot tall horseshoe adit tunnel located within an abutment of the Mount Morris Dam in Mount Morris, NY required repair of a failed reinforced concrete liner. The adit tunnel is entirely founded w
Jun 23, 2024