Improved Regulatory Coordination To Ensure Responsible Mining & Environmental Protection ? Issue? The economic health and national security of the U.S. depends on the continued availability of, and access to, reliable and affordable energy and mineral resources. However, America is hindered by a
Jan 1, 2011
-
Stability Prediction And Performance Of Highwall Steepening In Weak RockBy D. R. Brox, J. Levell
The Montana Tunnels Mine was mined out to a depth of 900 feet at the end of 1999. The first signs of instability were recognized in 1996 along the upper slope area of the northwest sector when the pit
Jan 1, 2001
-
Size Reduction/Mineral Liberation Simulation For A Magnetic Taconite Concentrator (451168a3-7660-4e82-9e41-cf07bc59aaec)By R. L. Wiegel
Several mineral process modeling and simulation packages are currently available for use in evaluating the performance of alternative process flowschemes. A critical link that has been missing from t
Jan 1, 2002
-
History And Development Of Aeration In The Cerro Verde MineBy G. Velarde
This paper presents the metallurgical results of column and stockpile leach tests with forced aeration to determine the usefulness of this process in the operational leaching at Sociedad Minera Cerro
Jan 1, 2006
-
Ventilation on demand (VOD) auxiliary fan project ? Vale Inco Limited, Creighton MineBy O?Connor. D. F.
The ever increasing energy costs associated with mining at depth has become an important issue that needs to be addressed for future sustainable production. Vale Inco Limited?s Creighton Mine being th
Jan 1, 2009
-
Hydrologic Assessment Of Waste Rock Stockpiles: A Case Study From Ajo Mine, ArizonaBy A. L. Williamson, G. Savci
Hydrologic assessments of existing and proposed waste rock stockpiles (WRS) are typically required for application of operating and closure permits at mine sites. The results of these assessments can
Jan 1, 2002
-
Notes On The Efficacy Of Wet Versus Dry Screening Of Fly AshBy B. Valentim
The methodology used to obtain fly ash subsamples of different sizes is generally based on wet or dry sieving methods. However, the worth of such methods is not certain if the methodology applied is n
Jan 1, 2008
-
Creative distribution techniques can help market penetration of industrial mineralsBy Mark P. Juzli
During the 1980s, a revolution has been taking place in industrial minerals marketing. Transportation deregulation and a handful of creative marketing and distribution managers have completely changed
Jan 1, 1989
-
Continuous Surface Mining Equipment: How to Achieve SuccessBy Edward DeLilla
For the past 30 years, surface mines have moved toward more highly mechanized, automatic systems that continuously mine overburden and ore to increase productivity, lower operating costs and minimize
Jan 1, 1994
-
Vocational and Technical Education in Geoscience With Emphasis on Geochemical Exploration SkillsBy James A. Madonna
Several universities and colleges in Australia, Canada and the United States, recognized the need to establish or reorganize geoscience programs at the vocational and two-year technical levels. To acc
Jan 1, 1994
-
Mine Planning at Newmont’s Nevada OperationsBy Steven Hoerger
Newmont Mining has a large, integrated gold-mining operation in northern Nevada with several mines, stockpiles and processing facilities. There are more than 90 defined metallurgical ore types and mo
Jan 1, 1999
-
Mining Review (8ea836c9-6346-4229-805b-5f63a4114d3f)Minerals contribute to the U.S. gross domestic prod-uct (GDP) at several levels?mining, processing and manufacturing finished products. In 2008, the estimated growth rate for the real GDP of the Unite
Jan 1, 2009
-
Double Shield TBM In Challenging, Difficult Ground Conditions?A Case Study From Zagros Long Water Transfer Tunnel, IranBy Jafar Khademi Hamidi
The Zagros long tunnel is one of the main components of Sirvan water transfer project in western Iran. It is approximately 48 km in length and consisted of two lots. The second 26 km lot of this tunne
-
Estimation Of Incremental Haulage Costs By Mining Historical Data And Their Influence In The Final Pit Limit DefinitionBy R. Benito
This paper describes the application of modern data-analysis tools, such as data mining, to determine a representative cost driver for haulage activity. This cost driver was subsequently used to trace
Jan 1, 2008
-
Jabali / Yanbu – A New Source Of Zinc In The Middle East (fe9d2734-cc3c-4ef2-b8ec-54ed953ef19a)By K. M. Stone, N. J. G. Masson, A. C. Woollett
The Jabali zinc deposit, in Yemen, contains at least 9.4 Mt at a grade of 10.7% zinc, 2.2% lead and 77g/t silver. The zinc occurs as smithsonite with minor hydrozincite. The Jabali ore does not produc
Jan 1, 2002
-
Fire Size and Response Time Predictions in Underground Coal Mines Using Neural NetworksBy Brian Y. Lattimer, Kray D. Luxbacher, Jonathan L. Hodges, Manuel J. Barros-Daza
The abstract discusses the importance of predicting fire response time (the time before conditions become untenable for firefighters) in underground coal mines. It introduces a data-driven approach us
Mar 6, 2022
-
Second Manapouri Tailrace Tunnel Design and Construction ConsiderationsBy Brian Heer, David Young, Randall Essex
The Manapouri Power Station is New Zealand’s largest hydroelectric facility located on the South Island of New Zealand. Constructed in the 1960’s, it includes a 700 MW under-ground power station and
Jan 1, 1997
-
Construction of a Mixed Face Reach Through Granitic Rocks and ConglomerateBy John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler
The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol
Jan 1, 2007
-
Roof Bolter Rocker Pad Deflector SystemsBy Arnold Hammons
Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby
Jan 1, 2009
-
Austrian Method Of Tunnel Building In Very Heavily Squeezing Ground In Mountainous Terrain Theory And PracticeBy Horst Pöchhacker
The largest structure along the Tauern highway section between Salzburg and Villach is the 6.4-km-long Tauern Tunnel. The major geotechnical problems that came up surprisingly while driving the headin
Jan 1, 1976