    Considerations For Blending Low-Rank and High-Rank Coals – Preprint 97-15

    By O. Ogunsola, M. Downing

    This paper gives a brief overview of impacts of coal blending on coal-fired power plants performance and discuses the preliminary results of an on-going study aimed at evaluating the effect of coal pr

    Feb 24, 1997

  • SME
    TECHNOLOGY NEWS – Tackling India’s Coal Ash Problem

    By Gary Brendel

    India produces about 70 Mt/a (77million stpy) of coal ash (fly ash and bottom ash) from burning about 200 Mt/a (220 million stpy) of coal for electric power generation. The average ash content is 35%.

    Jan 1, 1999

  • SME
    Minnesota Iron Mining Industry Looks at Change

    By William R. Yernberg

    The combined 76th Annual Minnesota Section of SME meeting and 64th Annual University of Minnesota Mining Symposium were held April 8and 9, 2003, in Duluth, MN. This year’s theme was “Stakeholders, Par

    Jan 1, 2003

  • SME
    Looking for Mr. Good Contract

    By Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb

    Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac

    Jan 1, 2005

  • SME
    Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMs

    By P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo

    The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs.

    Jan 1, 2005

  • SME
    Knelson-Deswik Mill: Evaluation Of Operating Variables ? Introduction

    By D. Rahal

    All ores have an economic optimum particle size (Wills and Napier-Munn, 2006). This optimum value is often a compromise between the need to achieve adequate liberation for the efficient separation and

    Jan 1, 2011

  • SME
    Evaluation Of Ct-Based Coal Washability Analysis System Under Simulated On-Line Conditions

    By J. D. Miller, C. L. Lin

    Appropriate software and hardware necessary to adapt a x-ray CT analyzer for determination of coal washability has recently been developed and sucessfully tested for well characterized samples under l

    Jan 1, 2001

  • SME
    Guadarrama Tunnel Construction with Double Shield TBMs

    By F. Mendaña

    The characteristics of the igneous and metamorphic bedrock, extra-hard and abrasive, of the Guadarrama Tunnels, a bi-tube project of length 28.4 km without any intermediate attack, are first commented

    Jan 1, 2007

  • SME
    Technical Note - Thick seam mining with artificial roof laying support

    By J. B. Gwiazda

    Introduction Thick seams constitute a considerable portion of Polish coal reserves. In producing mines and those under construction, the reserves where the height is more than 4.5 m (15 ft) total a

    Jan 3, 1987

  • SME
    Industrial Minerals 1995

    The United States continued to depend on imported bauxite during 1995. Domestic bauxite mine production remained at about the same level as in 1994. It amounted to less than 1% of total world produc

    Jan 1, 1996

  • SME
    Towards a More Cost Effective Mining Truck – Preprint 97-55

    By A. W. Dickerson, G. Hollier, F. A. Bartley

    Following on from many years of research aimed at improving the effectiveness of truck haulage operations in mines operated by BHP Minerals, BHP Research developed a concept for an Innovative Large Mi

    Feb 24, 1997

  • SME
    The Role Of The MMAJ And The Activities Of The Japanese Mining Industry In Global Resources Development

    By H. Ikeda

    INTRODUCTION [Slide 1] The Role of the MMAJ Ladies & Gentlemen, it is a pleasure for me to be able to make a speech at this SME annual meeting, representing the Metal Mining Agency of Japan.

    Jan 1, 2001

  • SME
    Specifications For Initial Support In Rock Tunnels

    By William F. Daly, William H. Hansmire

    Installation of initial tunnel support is often the most uncertain element of work in the design of, and a contractor bidding on, construction of a rock tunnel. The risks the construction contractor a

    Jan 1, 1985

  • SME
    Risk Management In Action—Controlling Difficult Ground By Innovation

    By A. Moergeli

    The Swiss are building the world’s longest tunnel, the 57-Kilometer (35-mile) long Gotthard Base Tunnel. Lot 252, Tunnel Amsteg: Two Hard Rock Tunnel Boring Machines (TBM) crossed hydro-thermally deco

    Jan 1, 2007

  • SME
    Boddington Gold Mine Moves Closer To Production

    Construction of the Boddington Mine 130 km (81 miles) southeast of Perth, is about 89 percent complete. When the $2.9-billion development is finished, it will be the largest gold mine in Australia, pr

    Jan 1, 2009

  • SME
    Managing diesel particle emissions through engine maintenance - an Australian perspective

    By P. Anyon

    Exposure to the microscopic particles in diesel engine exhaust can lead to serious health problems, including the incidence of cancers, heart disease and increased susceptibility to respiratory ailmen

    Jan 1, 2009

  • SME
    The Impact Of Surface Features Above Underground Mines On Emergency Response - Preprint 09-066

    By N. T. Lowe

    The National Institute for Occupational Safety and Health (NIOSH), Spokane Research Laboratory (SRL), investigated a means to evaluate the potential impact of surface conditions above underground mine

    Jan 1, 2009

  • SME
    Numerical Evaluation of Tunnel Lining in Visco?elastic creep active ground

    By Kyoosang Yoo

    The report presents the results corresponding to the analysis of a lining system for tunnels in soil and soft rock in creep-active ground. The purpose of the analysis is to evaluate the performance of

    Jan 1, 2010

  • SME
    Annual Review 1992 – Exploration 1992

    Worldwide minerals exploration slipped in 1992 from 1991 levels. Although industrial production figures showed the US economy emerging from recession in early 1992, it was not until February 1993 that

    Jan 1, 1993

  • SME
    Design and Construction of Tunnel and Shaft Plugs

    By James W. Marold

    Tunnel and shaft plugs have been designed to assist in construction of new and rehabilitation of existing tunnels and shafts. Tunnel plugs have been used to provide construction access for side by sid