Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Seafloor Massive Sulfide (SMS) Exploration In The Azores - Introduction: Mid-Atlantic Ridge And The Azores PlateauBy A. F. Marques
The Azores islands are located on a triple junction where the American, African (AFR), and Euroasian (EUR) plates meet. The Mid-Atlantic Ridge (MAR), oriented N-S, represents two branches of the T; an
Jan 1, 2011
-
Ground freezing resolves complex challenges ahead of SEM tunnelingBy Gregory T. Ziegler
A complex soil profile and high water table, together with a below-grade active subway tunnel, an above-ground elevated railway line, and the heavily travelled Northern Boulevard all passing above the
Sep 1, 2013
-
More Than 110,000 Attend ConExpo in Las VegasBy Steve Kral
More than 111,350 mining and construction industry professionals from throughout the world gathered in Las Vegas, NV, March 19-23 for ConExpo-Con/Agg 2002 and IFPE 2002. The triennial event is the We
Jan 1, 2002
-
Characterization of San Diego’s Stadium Conglomerate for Tunnel DesignBy S. J. Boone, A. Poschmann, C. Pound, A. Pace
San Diego’s Stadium Conglomerate consists of poorly cemented cobbles, gravel, sand, silt and clay. Conventional laboratory and in-situ testing is not suitable for characterizing its engineering proper
Jan 1, 2001
-
Mining, EPA, and toxic waste : Will your mining company be liable?By Peter Haller
Introduction The impact of the Comprehensive Environmental Response, Compensation, and Liability Act, or Superfund, as well as the Resource Conservation and Recovery Act (RCRA) and their state counte
Jan 2, 1987
-
Waterproofing: Key to SCL tunnel lining designThe global tunneling industry has many challenges, both technically and financially, with the latter likely to be a significant feature over the next few years. Many industries have ad-opted standard
Jan 1, 2010
-
Energy Fuels Prepared To Ride Uranium?s ResurgenceThe two candidates in the upcoming presidential election in the United States each say that they have their own solution to the nation?s energy problems - solutions that will increase the amount of en
Jan 1, 2008
-
The Use Of Instrumented Split-Set Rock Bolts To Monitor Strain In The Walls Of A Deep Underground Mine StopeBy F. Maciosek, D. Denton, J. Johnson
Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health and personnel from Coeur Silver Valley, Wallace, ID, conducted tests using rock strain st
Jan 1, 2004
-
Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO ProjectBy Jean Habimana
The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather
Jan 1, 2008
-
The application of nitrogen to control a spontaneous combustion event during a longwall face salvageBy Leeming. J. R.
In the UK, powered supports are normally salvaged from longwall faces on completion of production, for reuse on the next unit. Where a spare set of supports are held, the salvaged supports are often s
Jan 1, 2009
-
Drilled Shaft Construction At Crownpoint, New MexicoBy Hassell E. Hunter
The Wyoming Mineral-Conoco Crownpoint Project represents the first time that big hole drilling has been exclusively used to develop totally a privately financed mine below a depth of 1000 feet. Thr
Jan 1, 1983
-
Edmonton South LRT Twin TunnelsBy Steve Skelhorn
Edmonton South LRT is the latest expansion of the Subway system in Edmonton, Alberta, Canada: Consisting of twin 5.8m segmental lined tunnels, 280m long, driven by a Lovat EPB machine. The key challen
Jan 1, 2005
-
Mining 1986By J. D. Morgan
Introduction In 1986, the US economy passed the $4 trillion mark. However, the value of domestically processed materials of mineral origin fell slightly to $240 billion. The value of metals produced
Jan 5, 1987
-
The Effect Of Anode Impurities On Copper ElectrorefiningBy M. L. Free, L. Anthian
Electrochemical, chemical, and image analysis techniques were utilized together with statistical analysis methods to determine the effect of various anode impurities on copper electrorefining performa
Jan 1, 2000
-
Large Diameter Tunnel Boring Machine DevelopmentBy Martin Herrenknecht
The world?s growing population and rapidly proceeding urbanization are boosting an enormous demand for new and high-capacity infrastructures to secure the mobility of goods and people. Densely popula
Jan 1, 2010
-
North American Tunneling Conference Drives ValueThe theme of the 2012 North American Tunneling conference (NAT) was ?Tunneling: Driving Value.? This theme best reflects where the tunneling and underground construction industry is to-day. Major ad
Jan 1, 2012
-
Environmental Health and SafetyBy Raja V. Ramani
Discussion in this section of the Handbook is limited to the working environment of miners, the mine workers themselves, and the machines used in mining (Fig. 11.0.1). The contents emphasize personnel
Jan 1, 2008
-
Driving Point Impedance—A New Paradigm For Detecting Fracture And In Situ Stress In BoreholesBy D. M. Weinberg, S. R. Novascone, R. R. Reynolds, J. H. Cole, C. D. Christensen
The mechanical properties of the rocks surrounding an orbital vibrator alter the shape and amplitude of the vibrator’s orbit. Detecting these changes with driving point impedance measurements promises
Jan 1, 2002
-
Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United KingdomBy Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler
National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci
Jan 1, 2007
-
Chambers Creek Interceptor Sewer TunnelBy J. Jeffrey Wagner, Michael J. Bailey, Peter M. Douglass
The Chambers Creek Interceptor Sewer Tunnel project consisted of 2-1/2 miles (4 kilometres) of nominal 9-foot (2.7-metre) O.D. tunnel driven through predominantly glacially overridden soils. Mole-Coll
Jan 1, 1985