Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    Evaluation of applying dry cobbing magnetic separation in closed circuit with HPGR for upgrading of low grade BIF, magnetite iron ore- YOGI Project, Australia A.D. Ahmadabadi, N. Esmaeili, R. Hejazi, M. Saghaeian, and V. Sheikhzadeh

    By V. Sheikhzadeh, M. Saghaeian, N. Esmaeili, R. Hejazi, A. D. Ahmadabadi

    The main challenges in most low grade iron ore deposits are finding the optimum flowsheet for beneficiation to achieve a final concentrate from both technical and economic viewpoints. Dry preconcentra

    Jan 1, 2020

  • SAIMM
    Determination of the influences of sample disaggregation methods on the Blaine index of regrinding HPGR product, N. Esmaeili, A.D. Ahmadabadi, R. Hejazi, M. Saghaeian, and V. Sheikhzadeh

    By V. Sheikhzadeh, M. Saghaeian, N. Esmaeili, R. Hejazi, A. Dehghani Ahmadabadi

    High Pressure Grinding Rolls (HPGR) are mostly used prior to pelletising processes to increase the specific surface area (SSA) of iron ore concentrate. For expressing SSA, the Blaine index is utilised

    Jan 1, 2020

  • SAIMM
    Guide to the Preparation of Papers for Publication in the Journal of the South African Institute of Mining and Metallurgy (28345bb9-de50-4b2c-94f3-26a75d720bee)

    The following notes have been compiled to assist authors in the preparation of papers for presentation to the Institute and for publication in the Journal. All papers must meet the standards set by th

  • SAIMM
    Cave Management As An Ore Reserve Management Tool Ensuring Optimal Life Of Mine For Palabora Mining Company

    Palabora Mining Company is operating a copper block cave mine in the Limpopo Province of South Africa. The mine was developed in the late nineties with a target ore reserve of 220 million tonnes of c

    Jan 1, 2007

  • SAIMM
    The Simulation of Crushing Plants with Models Developed using Multiple Spline Regression (6f225d4e-c714-4b32-97c8-4db17382e4fc)

    By W. J. Whiten

    "Models of cone crushers and vibrating screens are described. These models have been constructed from actual plant data using a systematic model-building technique. Included in this technique is regre

    Jan 1, 2014

  • SAIMM
    Near real-time interpolative algorithm for mdelling air quality in underground mines

    By E. Lutz, M. Momayez, K. W. Brown Requist

    As real-time air quality monitoring becomes more prevalent in US underground mines, it is important to provide the highest data reliability with the fewest possible sensors. Real-time sensors remain c

    Apr 16, 2024

  • SAIMM
    Improved Understanding Of Explosive?Rock Interactions Using The Hybrid Stress Blasting Model - Synopsis (ddacffa6-1e01-4a91-b621-d99006599461)

    Since 2001, the Hybrid Stress Blast Model (HSBM) project members have developed a software suite to model the complete blasting process from non-ideal detonation to muck pile formation. To preserve th

    Jan 1, 2012

  • SAIMM
    Discussion of paper by J. M. Stewart entitled 'Heat transfer and limiting physiological criteria as a basis for the setting of heat stress limits'

    By N. B. Strydom

    I have read with interest all the papers dealing with heat transfer and the setting of heat stress limits that have appeared during the past two decades. Scientifically speaking, most of them can be r

    Jan 1, 1982

  • SAIMM
    Optimizing Medium-Term Operational Plans for a Group of Copper Mines (476b3df3-c089-4b00-9560-1bbd80974db2)

    By M. Splaine, W. Davison, D. C. Atkinson

    "Since 1964, Nchanga Consolidated Copper Mines, Ltd., has been developing and using production scheduling methods for optimizing its metallurgical operations in the short term (up to one year). Medium

    Jan 1, 2014

  • SAIMM
    Shaft Sinking Methods Based On The Townlands Ore Replacement Project ? Raiseboring. - 1. Synopsis

    By D. Visser

    This paper is based on the Townlands Ore Replacement Project whereby the concept of conventional sinking of one large diameter shaft was declined and replaced with three smaller raise bored shafts. A

    Jan 1, 2009

  • SAIMM
    Shaft Sinking Methods Based On The Townlands Ore Replacement Project ? Raiseboring. - 1. Synopsis (1a409def-2d2d-4370-aaf2-3d4061365083)

    By D. Visser

    This paper is based on the Townlands Ore Replacement Project whereby the concept of conventional sinking of one large diameter shaft was declined and replaced with three smaller raise bored shafts. A

    Jan 1, 2009

  • SAIMM
    Review of step changes taken to improve recovery of fine pentlandite at Kevitsa Mine, B. Musuku, N. Schreithofer, and O. Dahi

    By O. Dahl, B. Musuku, N. Schreithofer

    Recovery of fine pentlandite is proving to be a challenging task in the Kevitsa sequential flotation operations, with over 60% of the nickel losses reporting into the -25μm size fraction. Since commis

    Jan 1, 2020

  • SAIMM
    Variography applied as a tool to monitor metallurgy. EMPV software application to gold and silver recovery

    By A. Tello

    Variography was introduced by Dr. Pierre Gy to monitor a process, in the sixties. Later on, Francis Pitard extended this concept, building a complete system of variographic controls for different appl

    Jan 1, 2009

  • SAIMM
    The effect of particle sizes and solids concentration on the rheology of silicas and based suspensions - Synopsis

    By N. Mangesana

    The effect of high solids concentration and coarse particle sizes (d50 ranges 90?300 µm) on the viscosity of a suspension of water and silica sand was investigated. The experiments were designed to in

    Jan 1, 2008

  • SAIMM
    The Allocation Of Gold Production From Multiple Shafts Feeding A Common Treatment Plant Using Run-Of-Mine Sampling Of Ore Deliveries

    By H. E. Bartlett

    Previously, the grade of ore at the shaft head was taken to be equivalent to the grade measured in the faces by means of chip sampling. The tonnage mined from the stopes is determined from survey volu

    Jan 1, 2014

  • SAIMM
    Mechanization - An Anglo Platinum Perspective

    By A. M. Croll

    The efforts to mechanize narrow reef tabular orebodies unique to this country, are not new. They began in the early 1900s and have over the last century seen varied rates of progress and success. Effo

    Jan 1, 2004

  • SAIMM
    Determination of the erosion level of a porphyry copper deposit using soil geochemistry

    By S. M. H. Ahmadi, K. Barani, F. Moradpouri, R. Ghaedrahmati

    As exploration is time-consuming, costly, and risky, determination of the erosion surface of a metalliferous deposit before geophysical surveying and exploration drilling might be very helpful. Geoche

    Feb 6, 2023

  • SAIMM
    Market Implications for Technology Acquisition Modes in the South African Ferrochrome Context

    By E. Van Der Lingen, A. Paton

    "The South African ferrochrome industry has been faced with various challenges during the past few years, such as influences from the market, manpower strikes, China’s control over the demand for both

    Oct 1, 2018

  • SAIMM
    Trucks cycle optimisation in open pit coal mining using integrated dispatching system data with queue theory adoption APCOM 2021

    By S. Andika, O. A. Putri

    Maintaining fleet productivity, which consists of balancing loader and truck performance, has always been a challenging task. An automatic dispatching system (ADS) is implemented to help monitoring f

    Sep 1, 2021

  • SAIMM
    Flowsheet development work for re-opening of Prieska Cu-Zn Mine, J. Taguta and M. Bryson

    By M. Bryson, J. Taguta

    The Prieska deposit, mined between 1971 and 1991, is one of the world’s top thirty volcanogenic massive sulphide (VMS) base metal deposits. The Prieska Copper Mine in the Northern Cape Province was cl

    Jan 1, 2020