Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Numerical Simulation of Fragmentation During the Throw Stage of Blasting

    By C H. Ryu

    This paper presents a simplified two-dimensional numerical model of block fragmentation in a Jointed rock mass during the late or throw stage of a blast after wave effects have subsided. The model is

    Jan 1, 1986

  • ISEE
    Presplitting and Collapsing Part of an Old Underground Room and Pillar Mine

    By Dennis Dobson, Keith M. Henderson

    Lone Star Industries, Inc. in Cape Girardeau, Missouri operates an open pit mine to produce limestone for its portland cement manufacturing plant. The present mining method, for safety and legal reaso

    Jan 1, 1997

  • ISEE
    State-of-the-Art Explosive Void Measurement System

    By J P. F Warkentin, A W. Bauer

    Recently, significant improvements have been made in both blast design methods and blasting accessories. The introduction of extremely accurate blast delays now allows proper implementation of advance

    Jan 1, 1991

  • ISEE
    Structural Response and Human Response to Blasting Vibration Effects - Is There a Connection?

    By G Alan Foster

    Many complaints generated from blasting operations result from the marked human response to ground transmitted vibrations and air blast effects and so many authorities have considered the regulation o

    Jan 1, 1981

  • ISEE
    Benefits of Hercduct in Construction Blasting

    By Thomas C. Jones

    The purpose of this paper is to disseminate new information for nonelectric blasting in trenching and construction work. The presentation is not designed or intended to discredit conventional electric

    Jan 1, 1984

  • ISEE
    Blast Damage Predictions from Vibration Measurements at the SKB Underground Laboratories at ASPO in Sweden

    By Conny Sjoberg, Finn Ouchterlony, Bjorn Jonsson

    This contribution reports an investigation of the blasting damage in the contour of an access ramp to a Swedish underground laboratory for nuclear waste related studies. Near zone vibration measuremen

    Jan 1, 1993

  • ISEE
    Risk Management for the Explosives User

    By J T. Patterson

    The mining, quarrying and construction industries are often blamed for causing damage to residential-type structures when explosives are used. The claim experience for blasting vibration damage has be

    Jan 1, 1978

  • ISEE
    Blast Segmentation for Vibration Management

    By Lee Julian

    Ground vibrations generated by mine blasting must be controlled to comply with legislation and to protect sensitive local or site infrastructure. The consequences of exceeding imposed limits can range

    Jan 1, 2014

  • ISEE
    Blasting in Densely Joined Rock to Obtain Slabs; an Analysis of Current Practice and Optimization Criteria in Itialian Porphyry Quarries

    By E Castelli, M Fomaro, R Mancini, M Cardu

    The economic return of rock blasting is not provided by brute volume of broken rock, rather by the amount of marketable product. That is the case of the porphyry quarries of Trento district, whose out

    Jan 1, 1995

  • ISEE
    The Effects of Rock Mass Characteristics on Fragmentation in Controlled Blasting Experiments in Small Development Headings

    By Chantale Doucet, Yves Lizotte, Alan Cameron

    A joint Federal Government-Industry research project on the effect of geology on the fragmentation of rock excavated by blasting in underground developments was conducted at the CANMET Experimental Mi

    Jan 1, 1996

  • ISEE
    A Case Study of Blast Damage Evaluation in Open Stope Mining at Kidd Creek Mines

    By Hung Tran, Qian Liu, Patrick Andrieux, Dave Counter

    Blast damage in open stope mining has been an important concern in controlling ore dilution. Severe damage to the surrounding rock mass can result in the caving of waste rock and/or backfill materials

    Jan 1, 1998

  • ISEE
    Blasting with a Light Touch; Florida State Project 12014-3501 Fort Myers, Florida (307cb8ee-5b0c-48e5-806c-57d316a0ab82)

    By Doug Wathen, Philip M. E Thomas

    The City of Fort Myers needed to replace a 40-year old 42-inch storm sewer line in downtown Fort Myers with a new 54-inch line to accommodate population growth. The old line had to be kept operational

    Jan 1, 1996

  • ISEE
    Controur Control blasting in Soft Rock Excavation

    By W. Jiao, Y. Yongqi, R. Shan

    Soft rock mines are distributed through out P.R.C. And drilling and blasting is still the main method of driving a tunnel in these mines. Traditional smooth blasting has been widely and deeply studied

    Jan 1, 2000

  • ISEE
    A study of the ground vibration response to controlled blasts

    By J. -P. Tshibangu, E. Lefebvre

    ABSTRACT : The Tournai’s region in Belgium is characterized by outcrops of limestone that were mined out long ago by different companies for cement and crushed materials. The region is densely populat

    Jan 1, 2008

  • ISEE
    Adjusting Blasting to Increase SAG Mill Throughput at the Red Dog Mine

    By N. Paley

    An engineering project was undertaken at the Cominco Alaska Red Dog Mine to determine the extent that Semi-Autogenous Grinding (SAG) mill throughput could be increased by blasting differently. The Jul

    Jan 1, 2001

  • ISEE
    Journal: Blastserve, Look for the New Online Blasters Forum!

    Blastserve, ISEE’s Listserve is being replaced by our new Blasters Forum-online, an exclusive member benefit. Our goal is to provide an ISEE forum for you to network with your peers and exchange techn

    Jan 1, 2013

  • ISEE
    Reduced Ore Dilution by Controlled Split Round Blasting in Underground Uranium Mining

    By John R. Jr Tripi, Paul N. Worsey

    Split round blasting is commonly practiced in underground uranium mining in the Big Indian ore belt located in Southeast Utah. The technique is used to prevent ore dilution by separately blasting the

    Jan 1, 1985

  • ISEE
    Drill/Blast Hands-On Teaching

    By D Reid Watson

    A unique blend of theory and hands-on teaching of blast hole drilling and explosives technology is being provided at a Canadian Community College. Students graduate at an apprentice level quite capabl

    Jan 1, 1987

  • ISEE
    Organization - Key to Success

    By Sandra K. Penttinen

    A difficult blasting project can go very smoothly when every precaution is taken prior to and during the blasting procedures. These precautions include conducting careful preblast condition surveys of

    Jan 1, 1994

  • ISEE
    Rock Drilling on a Vertical Wall: Problem solving at Crazy Horse Memorial

    By Jeff Hermanson

    Every construction project has site specific problems that need to be dealt with. These problems may be created by the geology, location, weather, time constraints, etc. Once these problems have been

    Jan 1, 1996