Response to Load for Four Different Types of Bored PilesBy Mario Terceros H., Bengt H. Fellenius
"ABSTRACTFour strain-gage instrumented bored piles were constructed in a sedimentary, dense to very dense, fine to medium sand in Santa Cruz, Bolivia. Two of the test piles were the normally used bore
Jan 1, 2014
-
Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON ProjectBy Elizabeth M. Smith
The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss
Jan 1, 2009
-
Effect Of Installation On Quality Of Deep Mixed Soil Cement ColumnsBy Ali Porbaha
Rapid growth in the urban development requires continuous search for innovative technologies to construct complex infrastructure systems. Deep mixing is one promising construction technology that has
Jan 1, 2001
-
Comparison of Static Lateral Behavior of Vertical and Battered Pile Groups of the I-10 Twin Span Bridge Using Finite Element SimulationBy Ahmad F. Souri, Murad Abu-Farsakh
"In this study, the static lateral resistance of vertical and battered pile groups was analyzed using 3D finite element analysis. The battered pile group finite element model was verified using the re
Jan 1, 2017
-
Technical Note - Hollow Threaded Rebar For Cross Hole Sonic Logging Access Tubes Combined With Longitudinal Concrete Reinforcing In Drilled ShaftsBy Josef K. Alter
Crosshole Sonic Logging (CSL) of drilled shafts requires 1.5-in (38-mm) or 2-in (51-mm) I.D. sonic access tubes to be installed inside the steel reinforcement cage. The sonic access tubes do not contr
Jan 1, 2011
-
Application of Mammoth Vibro-Tamper (MVT) for the Shallow Compaction at Airport Runway Expansion Project on Florida Limestone GroundBy Kazunori Matsushita, Frank Vespi, Emi Walder, Mitsuo Nozu
During the runway expansion project at the Fort Lauderdale-Hollywood International Airport in Florida (FLL project), therewere complicated geotechnical issues with a number of cavities in the limeston
Jan 1, 2018
-
Application Study On Non-Destructive Static Test PileBy Han Xuanjiang
Through whole analysis of static testing piles information of a teaching building, this paper put for ward that when the ratioes of unload rebound amount to residual deformation and to total settlemen
Jan 1, 1991
-
The Influence Of RC Nonlinearity On P-Y Curves For CIDH Bridge PiersBy Leonardo Massone
The p-y method is one of the most popular methods in pile design and has been calibrated for various boundary conditions using numerical and experimental studies during recent years. Most studies on r
Jan 1, 2012
-
Effect Of Stabilizing Soft Super-Saline Soil By Vibroflotation ? SynopsisBy S. F. Fu
The Charkhan Salt Lake area of the Chaidamu Basin in West China is characterized by soft super-saline soils with very high contents of soluble salts. From the engineering point of view, these saline s
Jan 1, 2010
-
Static Load Transfer Computation Of PilesBy Pan Shisheng
Amodified load transfer method computing the displacement, axial compression, skin resistance, toe resistance, and other static bearing behaviours of piles, is propoesd in this paper. Through deriving
Jan 1, 1991
-
Seismic Considerations for Bridge FoundationsBy Lok M. Sharma
"Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou
Jan 1, 2017
-
Experiences Of The Cast-In-Situ Pile Filling In Stone-Line IntercalationBy Guan Jichang
An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t
Jan 1, 1991
-
The Analysis Of Results From Routine Pile Load TestsBy Bengt H. Fellenius
THIS PAPER deals with the analysis of results from axial testing of vertical single piles, i.e. the most common field test per-formed. Despite the numerous tests which have been carried out and the ma
Jan 1, 1988
-
CSM: An Innovative Solution For Mixed-In-Situ Retaining Walls, Cut-Off Walls And Soil ImprovementBy Fabrice Mathieu
The Cutter Soil Mixing (CSM) provides a cost effective solution for the rapid construction of retaining and cut-off walls using new equipment developed from diaphragm wall cutter technology. CSM consi
Jan 1, 2006
-
Unusual Dolphin Monopile StructureBy C. T. Christensen
The paper gives an outline of the design, installation and performance of a series of mooring and berthing dolphins for a major ferry berth outside the port of Elsinore, Denmark. The Dolphins are larg
Jan 1, 1989
-
Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell InterchangeBy Mark Maday
As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o
Jan 1, 2011
-
Site Solutions For The Pisa Tower Remediation - 1 - IntroductionBy Paolo Heiniger
The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter
Jan 1, 2000
-
Treated Round Wood Piling SpecificationsBy James S. Graham
Specifications for treated round wood piling are presented for the engineers consideration. Included in the text are background information, technical committees, Chellis, quality, treatment, static a
Jan 1, 1992
-
American Practice In Design And Installation Of Driven Piles For Structure SupportBy Hal W. Hunt
Heavier loading and more efficient equipment is helping to keep driven piles competitive in America. Better Knowledge and testing of soils and support materials make it practical to use higher stresse
Jan 1, 1987
-
Caisson Design And Construction Challenges On The New Tiger Stadium Project - SummaryBy Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999