Search Documents
Search Again
Search Again
Refine Search
Refine Search
- 
                     Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central StationBy Wolf-R. Under For improvement of urban traffic infrastructure, the City of Amsterdam is currently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti Jan 1, 2006 
- 
                     Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big TwistBy James P. Stewart This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une Jan 1, 2003 
- 
                     Reanalysis Of Piles Under Static And Dynamic Lateral Loads Reanalysis Of Piles Under Static And Dynamic Lateral LoadsThe process of pile driving disturbs the soil around the pile. The nature and magnitude of disturbance depends upon 1) the pile size, and 2) the nature of soil. Therefore, the prediction of a single p Jan 1, 1989 
- 
                     Soil Displacement Caused By Pile Driving In Clay Soil Displacement Caused By Pile Driving In ClayBy K. Rainer Massarsch The effects of soil displacement caused by pile driving on adjacent piles and structures are discussed. A method is proposed to estimate the point of force equilibrium which makes it possible to calcu Jan 1, 1989 
- 
                     Nature And Functions Of A Geotechnical Consulting Firm ? Synopsis Nature And Functions Of A Geotechnical Consulting Firm ? SynopsisBy D. V. Roberts Approximately 800 private consulting engineering firms in America specialize in geotechnical engineering. The gross income from these firms totals about $500 to $600 million per year. Sixty-five to se Jan 1, 2010 
- 
                     Float-In Cofferdams Float-In CofferdamsBy Robert B. Bittner Large diameter piles (2 to 3 m diameter, both driven and drilled) are being used more frequently by designers of bridge foundations. The use of these large piles allows the pile cap to be positioned Jan 1, 2013 
- 
                     Dynamic Testing For Bored Pile Bearing Capacity - Summary Dynamic Testing For Bored Pile Bearing Capacity - SummaryBy Jörn M. Seitz Dynamic load testing is employed with ever increasing frequency to estimate the strength and elastic settlement behavior of piles of all types. For dynamic loading ram masses up to 20 Mg have been use Jan 1, 1987 
- 
                     The Pile Foundation Of Tall Buildings In Shenzhen The Pile Foundation Of Tall Buildings In ShenzhenBy Li Keqiang This paper discusses the pile foundation of tall buildings in Shenzhen region. For 156 constructed tall buildings exceeding 18 storeys, about 86. 5 per cent of the sum. The two main types of foundatio Jan 1, 1991 
- 
                     Installation, Design, And Quality Control Of Augercast Piles ? Introduction Installation, Design, And Quality Control Of Augercast Piles ? IntroductionBy William J. Neely Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd Jan 1, 1990 
- 
                     Ultimate Skin Friction Of Single Batter Piles In Sand ? Synopsis Ultimate Skin Friction Of Single Batter Piles In Sand ? SynopsisBy A. M. Hanna This paper presents the experimental investigation on the ultimate skin friction of batter piles. The model piles were pushed in medium dense sand deposits at different inclinations up to 30 with resp Jan 1, 2010 
- 
                     High Stress Pile Testing At Soldier Field High Stress Pile Testing At Soldier FieldBy Michael H. Wysockey The load test program for the pile foundation at Soldier Field included static and dynamic load tests at four locations around the site. The dynamic tests were run with no knowledge of the static resu Jan 1, 2002 
- 
                      
- 
                     An Overview Of Augered, Cast In Place Piles In Florida - Introduction An Overview Of Augered, Cast In Place Piles In Florida - IntroductionBy Kirk A. Mcintosh Augered, cast-in-place (ACIP) piles have been utilized in the United States for a wide range of projects since the 1950's. Due to the cast-in-place nature of the installation method (and lack of Jan 1, 1997 
- 
                     A Tale of Two Dams: Performance of Deep Cutoff Walls A Tale of Two Dams: Performance of Deep Cutoff WallsBy Donald Bruce, Mark Harris, Wesley Schmutzler, James Sanders "This paper evaluates the history, construction and most importantly the performance of two remedial seepage cutoff walls installed in two major dams in the United States. Beaver Dam, on the White Riv Jan 1, 2017 
- 
                     Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - Summary Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - SummaryBy William D. Spielvogel The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t Jan 1, 1994 
- 
                     Load In A Drilled Foundation. Where Did It Go And When Did It Get There? Load In A Drilled Foundation. Where Did It Go And When Did It Get There?By Walter E. Vanderpool Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method. Jan 1, 2004 
- 
                     Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project DetailsBy Gordon King The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b Jan 1, 2003 
- 
                     A Cut And Cover In Stiff Clay In Eurre-France - Synopsis A Cut And Cover In Stiff Clay In Eurre-France - SynopsisBy R. Stenne This paper deals with a complementary soil investigation which being part of the contract helped understand the behavior of a softened clay and adjusted the design of a retaining structure accordingly Jan 1, 2000 
- 
                     Low Strain Integrity Testing Of Deep Foundations ? Introduction Low Strain Integrity Testing Of Deep Foundations ? IntroductionBy Jay A. Berger Nondestructive testing of deep foundations for integrity problems made great strides in the late 1980's. Inexpensive portable computers have allowed the immediate and rapid processing of field me Jan 1, 1990 
- 
                     Appropriate Field Measurements For Testing Capacity-Prediction Methods For Piles Installed By Vibration - Introduction Appropriate Field Measurements For Testing Capacity-Prediction Methods For Piles Installed By Vibration - IntroductionBy Michael W. Neill, O&apos The engineering profession generally does not accept vibro-driven piles as bearing piles unless their capacities can be verified by restriking with an impact hammer, which significantly reduces the ec Jan 1, 1989 
