Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Improving the Gold Gravity Performance: an Investigation into the Laboratory and Plant Gravity RecoveriesBy Sunil Koppalkar, Guillaume Noel, Ahmed Bouajila, Makni Sami, Claude Gagnon
"Gold gravity recovery circuits utilizing enhanced gravity separators have become an integral part of many of the modern gold processing plants. Thus, efforts to improve the operating efficiency have
Jan 1, 2011
-
Mill Operations - Lean and KeenBy P. R. Richardson
"Milling is the weak link in the process chain of many mineral operations. While this activity accounts for only a relatively small proportion of the direct costs of most mineral processing complexes,
Jan 1, 1988
-
Expert Systems Implementation at Peñoles Group ConcentratorsBy Ramón Alanís, Filiberto Orrante, Andrea Festa, Baldomero Gutiérrez, Fernando Cornejo
"SGS implemented two rules-based fuzzy logic expert applications on two grinding circuits operated by Peñoles Group in Mexico. Both expert systems are based on control strategies that push against pro
Jan 1, 2009
-
The Dragon of MiningBy Jonas Olsson
"The picture of China as an antiquated continent is changing rapidly and fast-forwarding progress is a fact in most infrastructural fields. Mining is not an exception. China is today the largest produ
Jan 1, 2006
-
Process Development at the Raglan ConcentratorBy Joe Holmes, Peter Langlois
"Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high
Jan 1, 2001
-
OMC Power-Based Comminution Calculations for Design, Modelling and Circuit OptimizationBy P. Scinto, A. Festa
"Orway Mineral Consultants Ltd (OMC) as a consultancy has specialized in comminution circuit design for over 30 years. The OMC Power Model is OMC’s in-house software for specific grinding energy power
Jan 1, 2015
-
Pilot Plant Development Studies on Mount Laurier, Canada, Graphite DepositBy V. Lakshmanan, Dan Mackie, J. Melnbardis
"Crystalline Flake Graphite is a strategic mineral. Since 1954 nearly all North American consumption has been imported from offshore. The Bouthillier Project in Quebec, Canada, is Orrwell Energy's bid
Jan 1, 1984
-
El Mochito Mine – Latest Operational Improvements and Future Challenges in the Area of Mineral ProcessingBy Renaud Adams, Vladimir Salatic
"The El Mochito Mine located in Honduras, Central America, has produced lead, zinc and silver in concentrates since the 1950s. The paper discusses changes made in both lead and zinc circuits to reduce
Jan 1, 2007
-
Drill-to-Mill Increased Mill Throughput at Barrick Goldstrike from Efficient Drilling and BlastingBy Roy McKinstry, Mark Rantapaa, Thomas Bolles
"More efficient drilling and blasting techniques have shown measurable improvements in throughput at the Barrick Goldstrike wet grinding mill.A decrease in throughput at the autoclave, due to increasi
Jan 1, 2004
-
Cut off Grade Optimizer Integrating Contaminant ConstraintsBy Sebastián H. Troncoso
Open pit mine planning is normally based on the selection of an economic envelope that has been generated by the Lerchs & Grossman algorithm, which requires individual economic valuation of each block
Oct 1, 2009
-
Block/panel caving pressing final open pit limitBy S. Fuentes, J. Cáceres
"During the past fifteen years, mines utilizing the block caving method have improved performance and systematically reduced total mining costs.This paper describes improvements in mine design, mine p
Jan 1, 2004
-
Gold Milling at Lac ShorttBy P. Dyas, H. Zouitt, D. M. Smith
"Falconbridge Copper's Lac Shortt gold mine is located in northern Quebec approximately 300 km northeast of Val D'Or and 100 km west of Chibougamau (Pig. 1). Engineering for the mill commenced in earl
Jan 1, 1987
-
Secondary Recovery of Bitumen Using Jameson DowncomersBy R. Siy, O. Neiman, B. Hilscher
"A full-scale prototype of “Jameson Downcomer” technology has been installed and tested on a Tailings Oil Recovery (TOR) vessel in Syncrude’s Mildred Lake extraction plant. Jameson Downcomers are a ty
Jan 1, 2012
-
Design Considerations for Mine Waste Management at the Meadowbank Gold ProjectBy Cameron J. Clayton
Cumberland Resources Ltd. is currently planning to develop the Meadowbank Gold Project located some 70 km north of Baker Lake, Nunavut in the eastern Canadian Arctic region. The Meadowbank Gold Projec
May 1, 2004
-
The Re-emergence of Resin in Pulp with Strong Base Resins as a Low Cost, Technically Viable Process for the Recovery of UraniumBy Chris Fleming, John R. Goode, James Brown
"Data will be produced from two uranium feasibility studies that were conducted in 2008, both involving uranium recovery from leached slurry by resin-in-pulp (RIP) with strong base resins. Excellent m
Jan 1, 2010
-
The Effect of Shotcrete on the Flotation Nickel Recoveries of Falconbridge Nickel-Copper OreBy Peter Wells, Laxman M. Amaratuga, Todd M. Kanhai
"Certain mining methods (eg. Cut-and-fill) result in the contamination of run-of-mine ore with shotcrete. This shotcrete remains mixed with the ore throughout processing. Experimentation performed by
Jan 1, 2000
-
Integration of gyratory crusher liner wear and operational performance for better crusher managementBy P. P. Rosario, D. M. Maijer
The primary crusher is a key component in the comminution process applied in open pit mines. A collaborative research project between the University of British Columbia and Highland Valley Copper (HVC
Jan 1, 2006
-
The Interaction of Synthetic Chalcopyrite with Silver and Cupric Ions in Sulfuric Acid SolutionBy Ahmad Ghahreman, Lin Li
Silver and cupric ions have been proven to play the roles of catalysts to promote the oxidation kinetics of chalcopyrite in acid solution. In this study, the interaction between silver ions and cupric
Jan 1, 2019
-
Applying a Customer-Based Approach at Vale’s Clarabelle MillBy A. Taylor, J. Shelegey, H. Sullivan, J. Doucet
"Historically, performance at Vale’s Clarabelle Mill was measured by Mill throughput and Mill recovery. After the economic collapse in 2008, a series of reviews were performed to drive improvements in
Jan 1, 2012
-
Experiences of Two-Stage Classification at Outokumpu ConcentratorsBy M. Tarvainen
"Lately, the development work in closed circuit grinding has mainly been focused on mills and on different types of instrumentation, mathematical models and automation in spite of the fact that the po
Jan 1, 1980