Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Operation and Maintenance of Grinding Circuits at Sidbec-Normines

    By Michael Jerome Wallace

    "This paper refers to the wet open circuit ball mil ls in operation at Sidbec-Normines'5 pelletizing plant at Port-Cartier, Quebec, which commenced operations in late November· 1977. Prior to detailin

    Jan 1, 1979

  • CIM
    Effect of Quench and Interpass Time on Softening Between Reductions During the Processing of Pipeline Steels

    By J. J. Jonas

    The categories of interpass time encountered in hot rolling are characterized. These are shown to fall into three broad categories: short (in rod rolling); intermediate (in strip processing); and long

    Jan 1, 2005

  • CIM
    Mineralogical Characterization of a Conventional Copper Refinery Anode Slimes Treatment Circuit

    By T. T. Chen

    A detailed mineralogical study was carried out to characterize the products generated in a conventional copper refinery anode slimes treatment circuit. The anode slimes, which are first leached in sul

    Jan 1, 2007

  • CIM
    The Evolution of Texture in Rolled AZ31

    By L. W. F. Mackenzie

    The influence of rolling temperature and annealing on the recrystallization and texture of magnesium AZ31 has been investigated. 100x125x6 mm AZ31 plate was cast in a permanent steel mould and then ho

    Jan 1, 2006

  • CIM
    The Occurrence of Massive Sulphide Deposits In Canada

    By J. E. Gill

    "THE YEAR 1959 appeared to be a good one in which to attempt a summary of progress in the location and study of sulphide deposits in Canada because a temporary surplus of metals caused prices to fall

    Jan 1, 1960

  • CIM
    Evaluation of Spiral Performance for Processing Iron Ore from the Carol Lake Deposit of the Iron Ore Company of Canada

    By G. Chung, W. Petruk, D. Doyle

    "A series of tests was conducted on Carol Lake iron ore, which contains about 38 wt % hematite and 19 wt % magnetite, to establish a flowsheet for high weight yield by spirals. A pilot plant was run i

    Jan 1, 1993

  • CIM
    Presidential Address, M.S.N.S.

    By Alex McEachern

    MINING LEADS WAY TO PROSPERITY THE year 1937 will stand out in the history of mining and metal products in Canada as one of which we shall always be proud. The combined contribution of these industri

    Jan 1, 1938

  • CIM
    Senator-Rouyn Mine

    By M. E. Wilson, A. C. Lee

    "The property owned by Senator-Rouyn Mines, Limited, is in Rouyn township about 17'2 miles southwest of the town of Rouyn. It adjoins the Chadbourne claims of Noranda Mines, Limited, on the south and

    Jan 1, 1954

  • CIM
    Snowmaking to Remove Nitrogen from the Mine Water at the East Boulder Mine, Stillwater Mining Company

    By Steven Aiken

    The East Boulder Mine located in Montana, U.S.A. utilizes snowmaking to assist with mine water treatment for nitrogen removal. Nitrogen species, including ammonia, are common contaminants in mine wate

    May 1, 2004

  • CIM
    Bacterial Leacidng of a Copper Sulphide Ore Containing Activated Pyrite

    By Z. Manafi

    Bioleaching of a copper sulfide ore containing "activated pyrite", using a mixed culture of mesophilic bacteria, was studied. This type of copper ore had been found unsuitable for flotation because it

    Jan 1, 2007

  • CIM
    Failure and repair of a mine hoist drumshaft

    By James E. Rider

    "Fractures in mine hoist drumshafts are rare. We know of no previously reported attempts to repair a fractured drumshaft; any feasible method would involve welding and the associated problems of disto

    Jan 1, 1988

  • CIM
    Maintenance Engineering - Failure and repair of a mine hoist drumshaft

    By James E. Rider

    "Fractures in mine hoist drumshafts are rare. We know of no previously reported attempts to repair a fractured drumshaft; any feasible method would involve welding and the associated problems of disto

    Jan 1, 1988

  • CIM
    Improving the Process of Blending Consistent and Predictable Feed in the Nickel Smelting Process Using PGNAA Technology

    By Michael Loken, April Montera

    "The process of blending consistent and predictable feed for the roasters is critical to optimizing product quality and controlling production costs. To assist in this process, Online PGNAA Slurry An

    Jan 1, 2016

  • CIM
    Geology of the Key Anacon Mine Area, Bathurst, New Brunswick

    By S. I. Saif

    The Key Anacon deposit lies about 6 miles northeast of the Brunswick NO.6 mine of Brunswick Mining and Smelting Corporation. Geological mapping, especially in the well-exposed Nepisiguit River section

    Jan 1, 1978

  • CIM
    Planning & Financial Valuation Model and Framework for Sustainability Investments

    Agenda ?The Context ?The Challenge ?The Solution ?Benefits and lessons learnt from pilots ?Next Steps The Context ?Facilitate management decision making process by supporting the development

    May 1, 2011

  • CIM
    Silicate Rocks - A Source of Potash for Fertilizers?

    By Gulshan Kumar Pradhan, Yogendra Pratap Singh, Dhawanm Nikhil

    "Potassium (K) is one of the essential elements for the growth of plants and thereby for humans. In fertilizers, potash demand has been steadily increasing at ~3.5% annually. Water soluble potash depo

    Jan 1, 2016

  • CIM
    Review of the Flotation Circuit at the Laronde Concentrator

    By J. Robitaille, P. Cousin

    "Agnico-Eagle Mines Ltd, Laronde Division, is a gold operation processing ore containing copper and zinc. Copper is recovered as a concentrate prior to gold cyanidation.Copper concentrate grade was im

    Jan 1, 1995

  • CIM
    Evaluation of Specific Charge Parameter on Open-Pit Blasting

    By Abdurrahman Tosun

    It is very important for after blasting processes that muck pile fragmentation is predicted and controlled during blasting. Therefore, a significant research effort has been devoted to the development

    Aug 1, 2013

  • CIM
    Testing of Flocculant-Assisted Hydrocyclone on Quebec Cartier Mining Company's Iron Ore Tailings

    By T. Yalcin, S. Brunet

    The flocculant-assisted hydrocyclone involves the addition of a flocculant to the cyclone feed for the purpose of obtaining a clear cyclone overflow, and thereby eliminating or reducing thickener requ

    Jan 1, 2004

  • CIM
    The Utility of the ISO 45001:2018 Framework to Generate Risk Profiles and Mitigation Strategies for the Worker/Asrine Gas Exposure Risk

    By B. Krysa, A. Mitsui, T. L. Koehler

    The presence of arsenic, even at trace levels, in copper processing leads to the risk of arsine gas where reducing conditions exist that can reduce any soluble arsenic present to its minus 3 valance s

    Jan 1, 2019