Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical Jarosite

    By A. Roca, G. Ríos, I. Ruíz, M. Cruells

    Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert

    Jan 1, 2019

  • CIM
    Assessing the Total Cost of Representativity in Flotation Plants

    By D. Brand

    "The risk management objective of the AMIRA Code of Practice for Metal Accounting has seldom been systematically investigated in the literature up to the authors’ knowledge. Risk is defined in the Aus

    Jan 1, 2017

  • CIM
    Some Insights into the Process Design of Ferronickel Smelters

    By S. Mostaghel, S. Nicol, M. Y. Solar

    Once upon a time, the process engineer developing the design criteria for a new saprolite ferronickel smelter had it easy: most ores were around 2.5% Ni, with a Fe/Ni ratio of 4 to 5 and a SiO2/MgO ra

    Jan 1, 2014

  • CIM
    Jameson Cell: The “Comeback” in Base Metals Applications Using Improved Design and Flow Sheets

    By K. E. Barnes

    "The “Jameson Cell” flotation cell was developed at Mount Isa Mines in the late 1980’s to address deficiencies in our flotation column installations. Early base metal installations had a variable reco

    Jan 1, 2006

  • CIM
    Comminution Circuit Design Considerations (49th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 17-19, 2017)

    By S. Rivard

    "This paper demonstrates the selection of grinding circuit technology for a number of recent projects including discussion of the key drivers and the role of energy efficiency. Decreasing head grades

    Jan 1, 2017

  • CIM
    Implementing Safe Production at Kittilä Mine

    The information in this document has been prepared as at February 16, 2011. Certain statements contained in this document constitute ?forward-looking statements? within the meaning of the United State

    May 1, 2011

  • CIM
    Antiscalants for Calcium Scale Control in Gold Process Circuits

    By Brad Wells, Wayne Bull, Wayne Dickinson

    "Antiscalants were evaluated for control of calcium carbonate (CaCO3) in gold processing applications. Under severely supersaturated conditions, 100 percent inhibition was achieved with 30 ppm antisca

    Jan 1, 2014

  • CIM
    Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine

    By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby

    "Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe

    Jan 1, 2017

  • CIM
    The Development of Process Mineralogy at Falcon Bridge Limited, and Application to the Raglan Mill

    By Norman O. Lotter, Lori Kormos, Greg J. Wilkie, Peter J. Whittaker, Johannes S. Stickling

    "Assessment of opportunities to improve mineral processing performance in existing concentrators and in describing undeveloped orebodies is key to improving the business case of a mining company. This

    Jan 1, 2002

  • CIM
    Spiral Surface Property Investigation

    By X. Louw

    "This paper examines the change in surface properties of the Polyurea used on spirals at different operational times: unused spiral, 28 months in operation and 58 months in operation. This is being do

    Jan 1, 2017

  • CIM
    Interface Management

    By R. Simonson

    Agenda ? Need and Introduction ? Interface Management Programs ? Outcomes of Successful Interface Management ? Key Success Factors ? Lessons Learned ? Concluding Remarks Need for Interface Mana

    Aug 1, 2013

  • CIM
    Archean Lode Gold and Base Metal Deposits: Evidence for Metal Separation into Independent Hydrothermal Systems

    By R. W. Hodder

    "Archean lode gold deposits of both vein and chemical sedimentary types typically have major enrichments of certain rare elements, including Au, Ag, As, Sb, B, W, Se, Te and Bi, coupled with low or ne

    Jan 1, 1982

  • CIM
    Flotation Improvements in the Luzenac Penhorwood Talc Concentrator

    By Ross Byron, Ken Roberts

    "During the fall of 2001 a program was initiated to determine the feasibility of improving the metallurgy in the flotation circuit at the Penhorwood Talc Concentrator located near Timmins, Ontario. Be

    Jan 1, 2004

  • CIM
    Fine Grinding, a Refresher

    By A. G. Doll

    "Many power-based grinding models exist, and most operators are familiar with Fred Bond's ""third theory"". Bond's model is most commonly used to describe primary and secondary grinding to product siz

    Jan 1, 2017

  • CIM
    Evaluating Multi Zone Ore Bodies of the Raglan Nickel Deposit using Current Planning Techniques Complemented by Real Option Pricing.

    By Bruno Lemelin

    Falconbridge Ltd Raglan Mine has been in production since 1998 and has produced annually some 900 000T of ore grading 3.1% nickel, 0.9% copper and 0.06% cobalt. The mine is located in Nunavik, Norther

    May 1, 2004

  • CIM
    Prevention of corrosion in aircraft -an overview of the evolution of materials and protective treatments

    By L. Salnais

    "Aluminum alloy structural components f or aircraft designed prior to the early 1970s, were machined from 2024, 7075 and 7079 plate, bar and forgings in either the T3xxx of the T6xxx tempers. Protecti

    Jan 1, 1988

  • CIM
    Using 3D Computer Simulation to Improve Construction Project Planning

    By Patrick Cloutier

    Presentation objectives ? Introduce discrete-event 3D computer simulation as a tool to design, improve and optimize construction projects: ? Describe a real typical construction project planning i

    Aug 1, 2013

  • CIM
    Underground Milling of Uranium Ores

    By Chuck Edwards

    "Cameco operates the high-grade McArthur River uranium mine in northern Saskatchewan, and is constructing the high-grade Cigar Lake uranium mine. Cameco has studied the concept of underground milling

    Jan 1, 2007

  • CIM
    The Use of Gas Dispersion Measurements to Improve Flotation Performance

    By Jan E. Nesset, Antonio DiFeo, James A. Finch, Jose Hernandez-Aguilar, Cesar O. Gomez

    "The gas dispersion measurement sensors and methodology developed by the mineral processing group at McGill University have to-date been employed at a number of plants in Canada, Australia, the U.S.,

    Jan 1, 2005

  • CIM
    Stabilisation et Solidification de Résidus Miniers Sulfo-Arséniés Dans des Remblais Cimentés en Pâte

    By Mostafa Benzaazoua

    Les remblais en pâte cimentés sont de plus en plus utilisés dans les exploitations minières souterraines. Une autre alternative d?utilisation du remblai en pâte consiste à le pomper et à le stocker da

    Nov 1, 2002