Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Canatuan Cu/Zn Flotation Metallurgy - Dealing with Zinc Pre-Activation

    By C. V. Umipig, G. G. Hutalle, E. E. Israel

    TVI Resource Development (Phils) Inc. Canatuan mine is a polymetallic ore deposit located in the Province of Zamboanga del Norte on the island of Mindanao in the Philippines. The deposit consisted of

    Jan 1, 2012

  • CIM
    Predicting the Effect of Grinding Media Size Distribution on the Performance of a Ball Mill Using Discrete Element Method (DEM) and Population Balance Techniques

    By S. Makni, A. Faucher, F. Robichaud, A. Bouajila

    "Optimizing the ball charge in a grinding mill may be needed to maximise throughput or alternatively, to achieve proper product size in more challenging situations. Efforts to optimise the ball charge

    Jan 1, 2012

  • CIM
    Dense Medium Separation and its Importance to Canada’s Diamond Mining Industry

    By Dave Price

    "Canada is scheduled to become the 4th highest diamond revenue producing country in the world by year 2004 with the already operating Ekati Mine and the anticipated operation of the Jericho Mine in 20

    Jan 1, 2000

  • CIM
    Case Studies on Circuit Design Using Flotation Columns

    By Glenn S. Dobby, Glenn A. Kosick

    "Column flotation circuit engineering has matured to a good level of understanding regarding testing, scale-up and design. Some of the factors important to the process of implementing columns are addr

    Jan 1, 1995

  • CIM
    Process Development for Milling B-Zone Ore at Rabbit Lake

    By S. Dicarlo

    "In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia

    Jan 1, 1988

  • CIM
    Turbo Pulp Lifter (TPL™) - An Efficient Discharger to Improve SAG Mill Performance

    By Sanjeeva Latchireddi

    "Deteriorating ore grade and high demand of metals has tremendously influenced the unit capacity of SAG mills. Pebble circuits have been added to the existing SAG circuits to increase their unit capac

    Jan 1, 2007

  • CIM
    The Rabbit Lake Mill -Twenty Years of Milling

    By Lam. E. K., J. W. Jarvi, B. P. Bharadwaj

    "The Rabbit Lake Operation is located in Northern Saskatchewan on the western shore of Wollaston Lake approximately 800 km north of Saskatoon, Saskatchewan.The Operation is owned by a joint venture of

    Jan 1, 1996

  • CIM
    The Finch-McIvor Functional Performance Based Grinding Circuit Modeling System

    By James A. Finch, Robert E. McIvor

    "This paper presents the development of a new grinding circuit steady-state modeling system. It is fundamentally based on the “functional performance equation”, which has now been used to improve the

    Jan 1, 2007

  • CIM
    Data integration for information technology infrastructure in mining

    By S. Dessureault, J. Porter, M. Woodhall

    Information and communication technology (ICT) is seen as a key source of future productivity improvements in mines. The information technology infrastructure (ITI) necessary to achieve these producti

    Jan 1, 2004

  • CIM
    Development of an Audit Procedure to Diagnose the MOP Flotation Circuit at SQM Chile

    By Carlos F. Perucca, Maria Virginia Ramírez A.

    "Chile based SQM S.A., exploits potassium chloride rich salts at the Salar de Atacama, in northern Chile. The process includes the solar evaporation of natural brines existing in the Salar salt bed, f

    Jan 1, 2004

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    Human Aspects of Automation - The Diamond Drilling Case Study

    By Helen Francis

    Over the last decade, lower ore grades and deeper mine environments have demanded that mining companies develop new technologies (tools and processes) to ensure a mine?s economic sustainability. At In

    May 1, 2002

  • CIM
    Sub-aqueous Inpit Deposition of Uranium Tailings at Key Lake

    By Trevor Hamm, Nick Holl

    "Cameco Corporation is operator of the world's richest uranium project, the Key Lake mine/mill complex, located within the Athabasca region of Northern Saskatchewan. Mineable resources from the Key La

    Jan 1, 1998

  • CIM
    VXP2500 Stirred Mill Optimization at Casmyn Mining Turk Mine

    By D. Rahal, I. Shah, B. Hines, S. Reddick

    "The development of stirred milling technology has proven to be an enabling technology in fine grained metallic deposits. The increased grinding efficiency allows for the economic size reduction requi

    Jan 1, 2014

  • CIM
    Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and Automation

    By Christoph Miller

    About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M

    Oct 1, 2009

  • CIM
    Prescriptive Blasting

    By D. Mark Richards

    Highland Valley Copper (HVC) is a large open pit copper mine in the southern interior of British Columbia. Machine guidance technology using GPS has been utilized at the mine since 1996 for blast hole

    May 1, 2007

  • CIM
    Intelligence for Grouting Balance

    By J. A. López-Molina, S. García, V. Castellanos-Pedroza

    "Grouting aims to reduce the permeability of rock mass below a predetermined value and has been widely used in rock engineering field for a long time. However, the injection procedure needs several em

    Jan 1, 2015

  • CIM
    Belt conveyor booster drives

    By J. A. Stewart

    "A common problem in the mining industry involves the overloading of established conveyor systems. This overloading can have a number of causes, such as new production technology or a changing market

    Jan 1, 1982

  • CIM
    Equity Silver Mines Scavenger Circuit

    By P. G. Semple

    "In January 1985, Equity Silver Mines Limited began operation of a cyanidation circuit to scavenge precious metals from the flotation tailings. At present, this process is treating 270,000 tonnes of t

    Jan 1, 1987

  • CIM
    Greenhouse Gas Abatement Through Energy Optimization

    By David Clarry

    ?The issue ?reduction requirement ?Planning abatement steps ?Energy Management & Energy Efficiency ?Energy Recovery / Utilization ?Alternative Energy Professional Services Overview ?Capital Pro

    May 1, 2009