Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Raising a Blind Shaft Between Two Submarine Coal Seams (297edc53-3f33-4275-8620-82ccd0512a9f)

    By Jos. Kalbhenn

    MR. G. G. BOWSER: Mr. Kalbhenn's paper is an excellent one and is a concise description of a very interesting piece of work. It is well known that a great deal of preliminary study was given to

    Jan 1, 1944

  • CIM
    Introduction (7f189fb1-f929-4104-b9c1-6992fd367b66)

    By Brian G. Pewsey

    Located in the northern part of the Province of British Columbia, the Cassiar Mine started development of its asbestos orebody in 1952, and is currently producing 105.000 tons of asbestos fibre annual

    Jan 1, 1978

  • CIM
    The Specogna Gold Deposit: A Late Tertiary, Low-sulfidation Epithermal Hot Spring Deposit, Graham Island, Queen Charlotte Islands, British Columbia, Canada

    By Richard J. Haslinger, C. Mark Rebagliati, James L. Oliver

    Abstract - Exploration at the Specogna gold deposit has identified a geological resource of 65.0 Mt grading 1.63 g/t Au, which equates to 3 million ounces of contained gold. This resource is hosted in

    Jan 1, 1998

  • CIM
    Collaboration Of Industry And Educational Institutes To Meet The Future Needs Of Mining

    By W. E. Oching, M. M. Ghomshei

    Attracting and retaining workers in mining industry has become an uphill battle to many mining companies. As workers with significant experience retire, it is getting more difficult to attract not onl

    Jan 1, 2023

  • CIM
    The Resonant Phenomena in a Pneumatic Drive Piston

    By L. T. Raevskaia

    We discuss the stability problem of a piston of the reversible axial-piston pneumatic motor called DAR-14M. We performed the full analysis of stress and deformation characteristics of the piston near

    Aug 1, 2013

  • CIM
    Positive Pressure Ventilation System Conversion at Diavik Diamond Mine

    By C. Robinson

    The Diavik Diamond Mine is located in one of the most remote and forbidding places in the world, 220 kilometres south of the Arctic Circle and on the bed of a vast northern lake, Lac de Gras. A single

    Aug 1, 2013

  • CIM
    Applying Today's Global Technologies to Underground Communications Systems? Case Study: Designing A State-of-the-Art Mine Communications System

    By Charles Tkaczuk

    In order to remain competitive the mining industry must keep up with changes in technology. Many innovative technologies from the mining perspective are commonplace in other industries. A ?Global? rev

    May 1, 2003

  • CIM
    SAG and Ball Mill Circuit Layout and Design

    By L. Dufourm

    This paper presents a review of plant layout considerations incorporated into recent designs of SAG/Ball mill circuits for two medium sized concentrators. The plant layouts presented and the design co

    Jan 1, 2012

  • CIM
    Mineral Liberation Analysis of Brunswick CuPb Rougher Flotation Streams

    By William Petruk, Donald Leroux, Michael Cooper

    "Brunswick's primary flotation circuit (CuPb) produces a low grade concentrate containing considerable amounts of undesirable sphalerite and pyrite. To determine the cause of the poor selectivity, a s

    Jan 1, 1996

  • CIM
    The Role of Indians and Eskimos in the Canadian Mining Industry

    By Andrew J. Freyman, Graham T. Armstrong

    "In September, 1968, a survey of operating mines in the Yukon and the Northwest Territories was undertaken to determine the role of Indigenes (Indian, Metis, Eskimo) on the mines, and the attitude of

    Jan 1, 1969

  • CIM
    A New Process for Treating Slimes after Copper and Nickel Electrorefining

    By A. C. Ter-Oganesyants, N. N. Anisimova, G. P. Kotukhova, G. N. Dylko

    The process utilized at Norilsk Nickel Polar Circle Division for treating slimes from the electrorefining of copper and nickel was developed in the late nineteen fifties and has survived without any f

    Jan 1, 2004

  • CIM
    Geology of the T ribag Mine

    By Matthew Blecha

    The Tribag copper deposit is one of the rare examples of mineralized breccias in the Canadian Shield. The breccia is a pipe-like body, and consists of granitic, diabasic and volcanic fragments embedde

    Jan 1, 1965

  • CIM
    Chapter III-Continued - Part 2. - Manitoba and Saskatchewan - Structural Control of Ore Deposits in Northern Manitoba

    By M. Harrison, C. H. Stockwell

    "Metals vah1ed at more than $200,000,000 have been obtained, mainly since 1930, from the mines of northern Manitoba. The greater part of this production has been copper, zinc, and gold from the Flin F

    Jan 1, 1954

  • CIM
    Multi Stage HPGR Circuits – Increasing the Benefit across the Comminution Flow Sheet

    "HPGRs operate in a wide array of applications in mining and minerals. These range from relatively coarse crushing of copper and gold ores at one end of the spectrum to the processing of fine iron ore

    Jan 1, 2018

  • CIM
    The Effect of Lead Impurity in Presence of Manganese Addition on Zinc Electrowinning

    By E. Ghali, W. Zhang, C. Su, N. Sorour, G. Houlachi

    "Zinc electrowinning process is sensitive to the presence of metallic impurities such as lead ions that could substantially and negatively affect the power consumption and surface morphology. Effect o

    Jan 1, 2016

  • CIM
    Cerro Verde Concentrator – Four Years Operating HPGRs

    By S. Koski, J. Vanderbeek, J. Enriquez

    "The Cerro Verde copper-molybdenum porphyry mine, majority owned and operated by Freeport- McMoRan Copper & Gold, is located 30 km southwest of Arequipa Peru. The concentrator, which produces copper a

    Jan 1, 2012

  • CIM
    Microstructural Evolution during the Annealing of Hot Worked Magnesium Alloy AZ31

    By A. G. Beer

    The evolution of microstructure is examined during the annealing of hot worked magnesium alloy AZ31. The influences of deformation and annealing conditions on the developed microstructures are assesse

    Jan 1, 2006

  • CIM
    Removal of Elemental Sulfur from Hydrometallurgical Waste Derived from Massive Sulfide Concentrates

    By K. Hawboldt, J. E. Halfyard, C. Bottaro

    The removal of sulfur from leach residues has been practised in the zinc industry using a combination of flotation and hot melt filtration. The process is highly dependent on the nature of the concent

    Jan 1, 2011

  • CIM
    Grade Control at Bethlehem Copper

    By C J. Coveney

    This paper, after a brief introduction to the mineralization and structure in the mine area, outlines the methods now being employed for grade control at Bethlehem Copper Corporation. Sampling, subgra

    Jan 1, 1965

  • CIM
    Formation of MgOHC1 during dehydration of magnesium chloride hydrates by contacting with molten salt

    By Muhammad Tawalbeh

    The calculated temperature history of a single particle of MgCl2 hydrates when it came in contact with fused salt electrolyte at 650 °C was determined using the measured heat transfer coefficient for

    Jan 1, 2004