Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Diffusion Barrier Coating System Concept for High Temperature Applications

    By T. Narita

    The diffusion barrier coating system (DBC system) was designed to suppress interdiffusion between alloy substrate and coatings in addition to ensuring slow oxide growth at high temperatures. In this r

    Jan 1, 2010

  • CIM
    Estimation of the in Situ Block Size in Jointed Rock Masses Using Three-Dimensional Block Simulations and Discontinuity Measurements

    By M. Pötsch, A. Kluckner, P. Söllner, W. Schubert

    "The in situ block size is a key parameter in the geomechanical characterization of rock masses. It describes the fracturing of the rock mass and thus is a measure for the degradation of the rock mass

    Jan 1, 2015

  • CIM
    Requirements for Paste Backfill Preparation in Narrow-Vein Mining

    By Alfred B. Annor

    The introduction and application of paste backfill over the past two decades has resulted in substantial benefits being realised by many backfill reliant mining operations who have used this technolog

    Oct 1, 2001

  • CIM
    Multiphysics Couplings and Stability of Fault Zones

    By I. Stefanou, J. Sulem

    "In the last thirty years, the study of earthquake mechanisms has emphasized the major role of rock friction. Earthquakes appear to be the result of a frictional instability and occur by sudden slippa

    Jan 1, 2015

  • CIM
    Pitchblende Deposits of the Saint Louis Fault

    By R. B. Allen, E. E. N. Smith, B. C. MacDonald

    "LocationTHE MAIN PROPERTY and townsite of Eldorado Mining & Refining, Limited, Beaverlodge Operation, is on the north shore. of Beaverlodge lake, •about seven miles north of the deserted town of Gold

    Jan 1, 1954

  • CIM
    Development of Novel Magnesium Alloys with Alkaline Earth Metal Oxides

    By Shae K. Kim

    The aim of this study is to manufacture magnesium alloys with alkaline earth metal oxides (BeO, CaO, MgO or SrO) additions with the objectives of (1) ensuring safety during processing and applications

    Jan 1, 2006

  • CIM
    The Geology of Gaspé

    By J. Béland

    "Three stages, each characterized by a particular sedimentation, magmatism, mineralization and deformation, are recognized in the geological history of Gaspe. The first stage led to the formation of t

    Jan 1, 1969

  • CIM
    Paymaster Mine

    By T. A. Lazier, C. S. Longley

    "Paymaster Consolidated Mines, Limited, owns several groups of claims in various parts of the Porcupine district. The area in which mining has been carried on includes parts of lots 5, 6, and 7, con.

    Jan 1, 1954

  • CIM
    What Will Future Uranium Mining Projects Look Like?

    By M. Fairclough, B. Moldovan

    Insights into uranium mining projects of the future can be gained by a careful statistical analysis of past and present deposits, as well as an examination of recent trends for uranium resource evalua

    Jan 1, 2020

  • CIM
    Burner Development Chamber for the Copper and Nonferrous Industry

    By M. Potesser

    Higher prices for natural gas or oil have motivated the copper industry to reexamine the modes of oxygen and oxy-fuel burner usage at operating plants. With rising energy costs and the growing importa

    Jan 1, 2007

  • CIM
    Characterization and Bulk Sorting of Cu Porphyry Ores

    Since 2008 rapid advances have been made in technologies for the sensing and sorting of ores, particularly copper, and copper-related ores. Advances include significant increases in the sensitivity an

    Jan 1, 2019

  • CIM
    Contrasting Styles of Gold Mineralization along the Grand Pabos-Restigouche Fault System: Implication for Carlin-like Au-mineralization in the Southwestern Gaspé Appalachians

    By André Chagnon, Michel Malo, Benoît Dubé, Chantal Pelchat

    "Abstract- In the southern Gaspé Appalachians, gold mineralization is spatially associated with the Acadian dextral strike-slip Grand Pabos-Restigouche fault system. Two different structurally-control

    Jan 1, 1998

  • CIM
    A Methodology for Fast and Efficient Geometallurgy Units Definition Utilizing Statistical Tools

    By Muhammad Usman Siddiqui

    Managing and analysing the vast amounts of data collected in a mining project effectively is crucial for enhancing the project's economic feasibility. The efficient utilization of this data is critica

    Oct 1, 2024

  • CIM
    Effect of titanium on solidification microstructure of A1-16%B4C composites

    By Z. Zhang

    Aluminum boron carbide particulate reinforced composites have found new applications in nuclear industry due to their special capability to capture neutrons, Recently, Alcan successfully developed a l

    Jan 1, 2005

  • CIM
    A Model City That Made Reparations From Past Uraniummining And Milling Practices

    By W. L. Dam

    Grand Junction, Colorado’s legacy with uranium mining and milling serves as a model attracting international interest. Access to water and central location to carnotite ore containing uranium and vana

    Jan 1, 2020

  • CIM
    Seeking Consensus ? How Many Samples and What Testwork is Required for a Low Risk SAG Circuit Design

    In Canada and other countries, legislation dealing with accurate factual disclosure for mining projects is being expanded to include more metallurgical design information. Grinding characteristics, me

    Jan 1, 2012

  • CIM
    Chapter III-Continued PART 7. - Sudbury Area - Regional Structure of the Lake Huron-Sudbury Area

    By H. C. Cooke

    "This paper has reference in a general way to the region extending from the north shore of lake Buron to the northern limit of the elliptical-shaped area generally known as the Sudbury Basin, and more

    Jan 1, 1954

  • CIM
    Development and New Research Program in the Meuse Haute-Marne Underground Research Laboratory (France)

    By J. -M. Bosgiraud, G. Armand, S. Dewonck, L. Richard-Panot

    "The Meuse/Haute-Marne Underground Research Laboratory (URL) is located on the eastern boundary of the Paris Basin. The URL started to be built in 2000 (shaft sinking operations) in the framework of A

    Jan 1, 2015

  • CIM
    Removal of Arsenic from Gold Processing Circuits by Use of Novel Magnetic Nanoparticles

    By C. Feng, D. W. M. Arrigan

    Arsenic is often associated with gold mining operations and poses a significant health and environmental hazard. While a number of technologies are available for removing arsenic, none of them is effe

    Jan 1, 2017

  • CIM
    Preventing and Managing Fires at Deep and Ultra-Deep Level Gold Mines in South Africa

    By M. G. Beukes

    "In South Africa most of the large gold mines operate between 1500m and 4500m below surface where reef is accessed initially through a vertical shaft system then via a network of tunnels and mined in

    Jan 1, 2019