Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Presidential Address, M.S.N.S. (6cc565cc-c06f-4eb7-b803-717878c836d5)

    By Frank Doxley

    "FIRST OF ALL I should like to express to the members my sincere thanks for having had the privilege of serving them as President during the year now ending, to the Council for their guidance, and to

    Jan 1, 1955

  • CIM
    "Re-Os Model Age Constraints on the Genesis of the Moss Molybdenite Pegmatite-ApliteDeposit, Southwestern Grenville Province, Quyon, Quebec, Canada"

    By Robert A. Creaser, David R. Lentz

    Abstract - The Moss molybdenite deposit, which was mined during both world wars, is hosted in late Grenvillian granitic pegmatite dikes. These dikes are locally aplitic, and intrude the late tectonic

    Jan 1, 2005

  • CIM
    Front-End Loaders in Mining

    By J. A. Ressinger

    "The purpose of this paper is to discuss some of the differences between various methods of excavating and loading as they relate to mining operations. The intent is not to provide ""pat"" answers, bu

    Jan 1, 1972

  • CIM
    Magnesia and Hydrated Lime from Wakefield Brucitic Limestone

    By Harry Jomini

    Introduction The Wakefield plant of the Aluminum Company of Canada, Limited - a member of the Aluminum, Limited, group of companies - produces magnesia, magnesia fertilizer ingredient, and hydrated

    Jan 1, 1950

  • CIM
    Stirred-Tank Bioleaching of a Pyrrhotite-Rich Tailings Sample

    By Y. Thibault, L. Morin, R. Cameron, D. Gould

    "There are an estimated 50 to 100 million dry metric tonnes of low-grade nickeliferous pyrrhotite tailings in the Sudbury area alone, with an average nickel grade ~0.8% (plus cobalt). Pyrrhotite is a

    Jan 1, 2017

  • CIM
    The Ecstall Story: The Transition from Pit to Underground

    By Peter N. Blakey, Jean-Paul Paquette, Barton A. Thomson

    "FROM THE BEGINNING OF THE PIT, it was known that the surface mining method had a projected life of about ten years, and that the ore extended to depths recoverable only by underground mining. When se

    Jan 1, 1974

  • CIM
    Effect of Ammonium, Sodium and Potassium Sulphates and Chlorides in the Pressure Acid Leaching of Western Australian Nickel Laterite Ore

    By B. I. Whittington

    This paper examines the effect of cation type (i.e. NH4+, Na+ and K+) and anion type (i.e. SO42- and C1-) on the extraction of nickel during the pressure acid leaching of a Western Australian laterite

    Jan 1, 2004

  • CIM
    The Effect of DMSA Addition on the Performance of Thiosulfate Leaching of Gold

    By S. Hume, J. Shepherd

    Meso-2,3-dimercaptosuccinic acid(DMSA) was studied as an additive for thiosulfate leaching of gold. DMSA was added to solutionscomposed of either sodium thiosulfate or calcium thiosulfate and the solu

    Jan 1, 2015

  • CIM
    Reduction of Fine Gangue Entrainment in Flotation of a Copper Ore

    In the flotation of a copper ore, entrainment of fine silicate and iron sulfide gangue minerals resulted in poor copper concentrate grade. In the cleaning stage, rejection of these gangue minerals was

    Jan 1, 2007

  • CIM
    The Exploration of a Sulphide-Bearing Belt, Labrador and New Quebec

    By Staff, G. M. Hogg

    "The eastern portion of the Late Precambrian geosynclinal structure known as the Labrador Trough comprises a 16,000-square-mile sulphide-bearing belt of good potential as a base metal exploration area

    Jan 1, 1966

  • CIM
    Self-Regulation in the Mining Industry

    By Knud Sinding

    Many industries have established their own systems for self-regulation. They often do so when companies operate in countries where financial, technical, environmental and social regulation is weak and

    Aug 1, 2013

  • CIM
    Summary of Recent Trends in Canadian Mineral Processing

    By E. G. Joe

    "This paper summarizes the main conclusions derived from twenty-two technical presentations made at the 1973 meeting of the Canadian Mineral Processors. Results of two surveys with response from over

    Jan 1, 1973

  • CIM
    Development of HPGR Circuit Based on the Operating Parameters and Material Characteristics

    By V. Sheikhzadeh, M. Saghaeian, R. Hejazi, P. Ghobadi

    Design and selection of equipment for a grinding circuit strongly depends on the mill function, ore properties and requirements of the down-stream circuit. Primary mills usually work in open circuit a

    Jan 1, 2016

  • CIM
    Fraser Mine Material Handling System

    Weekly Capacity ? Current Schedule Rate (198.5 tonnes / hour) X Skip Time (112.7 hours) X Effectiveness (85%) = Weekly Capacity (19,015 tonnes) Capacity Conclusions - Existing hoists optimized are

    Feb 1, 2008

  • CIM
    The industrial application of an aluminum wire injector for ladle metallurgy

    By Frank Mucciardi, Louca Gourtsoyannis

    "Low and inconsistent recoveries of aluminum in the production of aluminum-killed steels triggered an extensive research program on the aluminum dissolution kinetics at McGill University. This researc

    Jan 1, 1982

  • CIM
    Guyana Goldfields Flagship Aurora Project – Road to Success

    By Jon Errey, Aleksandar Petrovic, Karl Haase

    "Developing a gold deposit of this magnitude in the Amazonian jungle of Guyana posed many challenges. This paper describes not only the process & logistical challenges arising from the remote mine sit

    Jan 1, 2016

  • CIM
    Processibility of Athabasca tar sand using a batch extraction unit: the role of NaOH

    By E. C. Sanford

    A laboratory-scale batch extraction unit and operating procedure for studying the hot-water separation of bitumen from Athabasca tar sands are described. The extractor evolved from earlier units and h

    Jan 1, 1979

  • CIM
    Concentration of Tantalum .from the Bernie Lake Pegmatite Deposit, Manitoba

    By D. Raicevic

    Interest has recently been revived in the recovery of tantalum from the Bernie Lake pegmatite deposit. A gravity concentration process was developed to give satisfactory recovery and concentrate grade

    Jan 1, 1968

  • CIM
    Considerations for Technology Introduction Under the Explosive Free Rock Breakage Explosive-Consortium

    By Bétournay. M. C.

    Advantages ?Safety ?Health ?Rapid, continuous development, productivity ?Stope dilution reduction Disadvantages ?High cost and long time for equipment development ?Hard rock mining condition l

    May 1, 2009

  • CIM
    Design innovations in conveyor systems

    By Lloyd H. Yeomans

    "This paper will cover recent developments in conveyor applications with specific reference to capacities, bell speeds and distances. It will also discuss certain unique arrangements of horizontal, cu

    Jan 1, 1983