Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Gold Milling in Canada

    By J. J. Denny

    The purpose of this paper is to present, briefly, an outline of Canadian practice in the milling of gold-bearing ores- not, however, including those auriferous ores which are mined and milled primaril

    Jan 1, 1930

  • CIM
    Stress Mechanism at the Mindola Mine, Zambia, Africa

    By M. L. Jeremic

    The design of the long-hole sublevel mining method was originally based on the traditional assumption that the principal load was due to the weight of the overlying rock, and that the horizontal stres

    Jan 1, 1978

  • CIM
    Modifications to Improve LHD-Type Vehicles

    By J. P. Morgan, D. B. Stewart

    "AbstractLoad-haul-dump machines equipped with. a torque converter and hydraulic pumps have been field tested by means of an engine monitoring instrumentation package. It was found that owing to paras

    Jan 1, 1977

  • CIM
    Follow-up of production equipment availability and its contributing factors in selected Canadian underground mines (c91cec33-4a50-430e-af5f-a02039dc2e40)

    By D. Komljenovic, E. Lafontaine, J. Paraszczak

    Availability of the production equipment used in underground mines has a substantial impact on production costs and, thus, on mine profitability. Appropriate collection of pertinent data and informati

    Jan 1, 2008

  • CIM
    Remote Diagnostic Services for Gearless Mill Drives

    By S. Gaulocher

    Gearless mill drives (GMDs) are the workhorse in the mineral processing industries, more specifically when it comes to grinding crushed ore and cement (in various production stages) in semiautogenous

    Jan 1, 2012

  • CIM
    Cyclones

    By Norman A. Jull

    "IntroductionThe scope of this paper is intended to deal mainly with cyclones in grinding circuits. However, the section on Cyclone Equipment, contains more general descriptions, to cover most of the

    Jan 1, 1989

  • CIM
    Smelter contracts

    By D. Farrish, W. A. Grell

    "IntroductionMost base metal mines sell their concentrate to a custom smelter. The two parties concerned therefore draw up a contract which would detail the conditions under which concentrate sales wi

    Jan 1, 1989

  • CIM
    Towards Industrial Aluminum Spent Pot Lining Treatment with Complete End-Product Valorization

    By G. Hamel

    The LCL&L process (Low Caustic Leaching & Liming) is a patented hydrometallurgical route developed by Rio Tinto Alcan (RTA) to economically process spent pot lining (SPL) generated by aluminum cells.

    Jan 1, 2011

  • CIM
    Rare element granitic pegmatites in the Abitibi Greenstone Belt: A case study of the Preissac-Lacorne Batholith

    By T. Mulja, Michel Boily, Anthony E. Williams-Jones, Pierre Pilote

    "The Preissac-Lacorne batholith is composed of suites of early metaluminous calc-alkalic gabbroic to granodioritic intrusives, three late peraluminous monzogranite plutons and numerous Li, Be and Ta-b

    Jan 1, 1990

  • CIM
    New Trend of the Global Flow of Strategic Metals

    By K. Halada

    Current trend of the global flow of strategic metals are analyzed to discuss the strategy of the development of recycling technology and alternative technology. In many cases, each global flow of meta

    Jan 1, 2014

  • CIM
    Recent Developments in the Understanding of the Corrosion Behaviour of Nanocrystalline Electrodeposits

    By U. Erb, L. Monaco

    "Electrodeposited nanomaterials are increasingly implemented in advanced industrial applications in the aerospace, automotive, defence, electronic and energy sectors due to their outstanding physical,

    Jan 1, 2012

  • CIM
    Progress of Petroleum Geology in Western Canada to 1945

    By J. O. G. Sanderson

    Introduction In this paper it is proposed to review the history of petroleum geology in western Canada, to discuss some of the main events which have affected its progress, to mention its relations

    Jan 1, 1946

  • CIM
    Trend in Steam Boiler and Furnace Design

    By R. E. MacAfee

    THERE have been great changes in the design, capacity, and pressure of steam generating units over the past fifty years. If we go back as far as 1890, the plants then existing were largely horizontal

    Jan 1, 1939

  • CIM
    Special Design Considerations for Pressure Hydrometallurgy Pilot Plants

    Pilot plants for pressure hydrometallurgy represent special design and project execution challenges unique to the industry and to the pilot- and demonstration-scale. Pilot plant projects have differen

    Jan 1, 2004

  • CIM
    AOSTRA's underground test facility (UTF): mine-assisted recovery under difficult conditions

    By J. C. O'Rourke

    "This paper presents an overview of Alberta Oil Sands Technology Research Authority's in situ oil sands recovery project at its underground test facility near Fort McMurray. It covers the rationa

    Jan 1, 1989

  • CIM
    The geology of the Ansil deposit, Rouyn-Noranda, Quebec

    By Gérald Riverin, Bernard Salmon, Marlo Gagnon, Réemi Asselin, Alain Cazavant, Michel LaBrie

    "The Ansil deposit is located in the Noranda mining camp in the southern part of the Abitibi greenstone belt. /twas discovered in 1981 and production began in 1989 with proven reserves of 1.58 Mt grad

    Jan 1, 1990

  • CIM
    In-situ mechanical characterization of a paste backfill with a self-boring pressuremeter

    By J. Ouellet

    "ABSTRACTA brief background on in-situ testing of mine backfill, as well as pressuremeter testing is briefly described, and results from an in-situ testing on paste backfill are presented. A series of

    Jan 1, 2000

  • CIM
    Statistical Models for Porphyry-Copper-Molybdenum Deposits of the Cordilleran Belt of North and South America

    By Wignall. T. K., J. De Geoffroy

    Statistical models are fitted to the observed distributions of eighteen characteristics of the population of commercial porphyry deposits of North and South America. The statistical base required for

    Jan 1, 1973

  • CIM
    Refractory Wear in Nickel and Cobalt Processing Furnaces

    By B. Drew, K. Budna, C. Wenzl, D. Gregurek, A. Spanring

    "The metallurgy of nickel and cobalt and of copper is closely interlinked when processing sulfidic Ni-Co ores and Cu-Co ores. The respective furnaces are typically lined with magnesia-chromite refract

    Jan 1, 2017

  • CIM
    Augmented Reality System Applications in Construction Project Activities

    By S. Kivrak

    The firms in construction industry could not sufficiently adapt the rapidly emerging information technologies in recent years into their corporate structures. Therefore, in an effort to further exploi

    Aug 1, 2013