Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Liquefaction Incident in a Waste Pass: A Case Study

    By F. Hassani

    This Paper describes a sudden spill of rock waste used for backfilling from a waste pass at one of the underground mine in Canada thus causing a major failure/accident. The mine operator immediately

    May 1, 2003

  • CIM
    Dorr-Oliver Application Driven Design of Flotation Cells

    By Kallioinen Jouko

    "Advanced Flotation Technology is the application driven design of Don-Oliver flotation cells to achieve the optimum performance for each type and grind of flotation. Optimum performance is the combin

    Jan 1, 2000

  • CIM
    New Developments in Velocity Profile Measurement and Pipe Wall Wear Monitoring for Hydrotransport Lines

    By Robert J. Maron, Mark Fernald, Alex Van der Spek, O’Keefe. Christian, Tim Bailey

    "Sonar array-based non-invasive flow measurement technology is becoming an accepted and many times a preferred method of measuring challenging single and multi-phase flows in the mineral processing in

    Jan 1, 2009

  • CIM
    Lac Minerals Development of Hemlo

    By C. Patel, George H. Hope

    "INTRODUCTIONThe Hemlo area is located in Northern Ontario, some 350 km east of Thunder Bay along highway 17. Hemlo is Canada's largest, recent discovery of gold ore. Three companies, Lac, Noranda, an

    Jan 1, 1985

  • CIM
    Precipitation of Crystalline Svabite (Ca5(AsO4)3F) and Svabite/Fluorapatite (CA5(ASO4)X(PO4)3-XF) Compounds and Evaluation of their Long-Term Arsenic Fixation Potential

    By M. -C. Noël, G. P. Demopoulos

    In this work the formation and environmental stabilization potential of arsenate-containing fluoroapatites is considered. In particular in this research various compounds were precipitated from synthe

    Jan 1, 2014

  • CIM
    A Commodity Cycle ? Where Are We?

    By David D. Davidson

    Commodities remain hot for the time being, but for how much longer? The bulls point to global economic growth lead by China?s insatiable demand for raw materials. To further emphasis the bullish view

    Apr 1, 2005

  • CIM
    Performance and Monitoring of the Louvicourt Mine Tailings Disposal Area

    By Michel R. Julien, Michel Lemieux, Jean Cayouette, Daniel Talbot

    "The Louvicourt Mine located near Val d’Or, Quebec has been in operation since 1994. It produces copper and zinc concentrates. The tailings generated from the ore processing operations have a strong n

    Jan 1, 2004

  • CIM
    Assessing the Value of Ventilation on Demand CIM Conference

    By Glenn Lyle

    CEMI Introduction ? Introduction of the CAF VOD Project ? Who are our partners ? What were the Outcomes What is next

    May 1, 2011

  • CIM
    Simulation of possible Bronze Age copper-iron alloy production by smelting dead-roasted ferruginous sulphidic copper ores

    By A. Paulin, J. Roth, S. Spaic

    This experiment was carried out to see whether copper-iron ingots from Late Bronze Age hoards could have been produced by smelting ferruginous copper ores. Since ferruginous copper-ores are chalcopyri

    Jan 1, 2001

  • CIM
    The Central Mukur Gold Project

    By Elmer Stewart, Richard May

    "The Central Mukur deposit was discovered by the Semipalatinsk Geological Exploration Expedition (GEE) during detailed searches from 1977 to 1980. Andas Altyn Ltd., a Kazakhstanian gold mining company

    Jan 1, 1999

  • CIM
    Pavoncelli Tunnel Case Study

    This paper describes the back analysis of the Pavoncelli tunnel, an hydraulic tunnel which was excavated between 1904 and 1915 in South of Italy and experienced severe damages during the 1980 Irpino-L

    May 1, 2009

  • CIM
    High Fidelity Simulation of Full Mill Transport and Breakage in SAG/AG and Pebble Mills

    By John A. Herbst, Alexander Potapov, Xiangjun Qiu

    "High Fidelity Simulation is a name applied to the use of first principles modeling tools including Discrete Element Modeling (DEM), Computational Fluid Dynamics (CFD) and Discrete Grain Breakage (DGB

    Jan 1, 2003

  • CIM
    Syngenetic Gold: Lode Vein Geology and Exploration Implications

    By Kretschmar. U. H.

    Fieldwork in the Meguma of Nova Scotia and Archean equivalents shows that bedding-parallel quartz lode gold veins (LVs) commonly occur at the top of graded elastic sequences. We define a "gold cycle"

    Jan 1, 2011

  • CIM
    Fracture characterization in granite using ground probing radar

    By Arthur L. Holloway, James C. Mugford

    "The Underground Research Laboratory (URL) is located in southeastern Manitoba, in the Lac du Bonnet granite batholith of the Canadian Shield. It was constructed by Atomic Energy of Canada Limited (AE

    Jan 1, 1990

  • CIM
    X-Ray Tomography Study on the Effect of Porosity on Fatigue Crack Initiation and Propagation in AM60 Die Casting

    By Zhuofei Yang, Jidong Kang, David S. Wilkinson

    The fatigue behavior of AM60 high pressure die casting magnesium alloys was studied in a straincontrolled manner. The fatigue test was interrupted every 2,000 cycles for X-ray tomography scanning. The

    Jan 1, 2014

  • CIM
    Development of a 3D Modeling System For the Monitoring of the Daniel-Johnson Dam

    By Vincent Roy

    Numerous on going activities at the Daniel-Johnson Dam : ? Surveillance / monitoring ; ? Structural investigations & evaluation ; ? Injection work ; ? Crack mapping ; ? Instrumentation management

    Aug 1, 2013

  • CIM
    Factors Influencing the Expert System Profitability

    By Andy Fortin, André Vien, Christophe Bouché, Jeff McKay

    "The technology and equipment design of the Twenty-first Century permit us to exploit low-grade ore bodies with milled tonnages reaching 300,000 tpd. Because of their substantial operational costs (en

    Jan 1, 2003

  • CIM
    Cobre Panama

    By Ian D. Pirie

    Presentation outline ?Project location ?Geology ?Resources and reserves ?Results of the FEED study ?Social and environmental considerations ?Project path forward

    May 1, 2010

  • CIM
    Structural Controls on Massive Sulfide Deposition and Hydrothermal Alteration in the South Sturgeon Lake Caldera, Northwestern Ontario

    By A. H. Mumin, A. K. Somarin, K. S. Oran

    "Synvolcanic structures played a fundamental role in the genesis, morphology, and siting of volcanogenic massive sulfide ores and associated hydrothermal alteration in the Archean South Sturgeon Lake

    Jan 1, 2007

  • CIM
    Modified Stability Graph Method with a new Rock Stress Factor

    The Stability Graph Method is widely used in Canadian underground hard rock mines for open stope support design and is frequently used in the mine planning phase to assess the viability of stope geome

    May 1, 2011