Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Ground Support at CraigmontBy A. J. Petrina
"At Craigmont Mines Limited, Merritt, B.C., tests were begun in March, 1965 to evaluate the use of shotcrete as a method of ground support m development headings; previously, ail drifts had. required
Jan 1, 1968
-
The Sherritt-Cominco Copper Process ? PART II: Pilot-Plant OperationBy P. Kawulka
An integrated pilot plant for the development of the S-C Copper Process was constructed at Fort Saskatchewan in 1975 and operated in 1976. The pilot plant was designed to treat 9 tonnes per day of a p
Jan 1, 1978
-
A geological appraisal of the coal resources of Nova ScotiaBy Peter A. Hacquebard
Recent drilling programs have shown that the in-situ coal resources of Nova Scotia are very substantial. The grand totals of the measured, indicated and inferred categories amount to 232 m, 646m and 9
Jan 1, 1979
-
Possible Major Structural Control of Ore Deposits Flin Flon ? Snow Lake Mineral Belt, ManitobaBy J. M. Harrison
FIELD PARTIES of the Geological Survey of Canada have, in recent years, mapped several areas east and northeast of Flin Flon (9, 10, 12, 13, 14, 15, 118) (1). In all these areas the mineral deposits s
Jan 1, 1951
-
Concentrate Leach Plant Startup, Operation and Optimization at the Phelps Dodge Bagdad Mine in ArizonaBy John C. Wilmot, Robert E. Brewer, Royce J. Smith
In March 2003, Phelps Dodge started up an innovative pressure leach facility for processing copper concentrates at the Bagdad mine in Arizona. This paper describes the development of the concentrate l
Jan 1, 2004
-
Studies on the Early Detection of Spontaneous Combustion in a Hydraulic Coal MineBy R. N. Chakravorty
Early detection of spontaneous combustion is of utmost importance in underground coal mining to prevent major disruptions of production and to ensure a safer working environment. This paper presents t
Jan 1, 1978
-
Residues from Lead, Zinc and Copper Industry and Their Possible Contribution to the Supply of Selected Minor ElementsBy Juergen Antrekowitsch, Stefan Steinlechner
"Within the last decades, mainly the base metals, like zinc, copper and lead were recycled from different industrial residues without taking into account that accompanied minor side-elements are often
Jan 1, 2016
-
Waste Management and Energy Savings through Extraction of Valuable Metals: Copper, Nickel and Cobalt from Sulphidic Tailings of Golgohar Iron Mine, IranBy M. Askari, A. Ahmadi
"This study was conducted to establish the possible application of bioleaching in the pilot scale to recover valuable metals from the sulfidic tailings of Golgohar Iron Mine (Kerman, Iran). Using biol
Jan 1, 2017
-
Slim-Hole Drilling and 2 1/2.-lnch Casing, Tubingless CompletionsBy John H. Nicholls
In this paper, Imperial Oil Limited reports briefly on the drilling by contract rigs of twenty-nine slim holes in the Virden, Smiley, and Souris Valley areas. The investigations showed that slim-hole
Jan 1, 1958
-
Industrial minerals in British Columbia - new developments, new discoveries and new opportunitiesBy Z. D. Hora
"There has been a number of new developments in British Columbia's industrial minerals field over the past few years. Several new industrial operations were started to diversify the line of Briti
Jan 1, 1990
-
Baymag - high-purity magnesium oxide from natural magnesiteBy Hagen B. Schultes
"Refratechnik, a leading German refractory company, acquired a majority shareholding in Baymag in 1979. This acquisition included the mining rights for a magnesite deposit of exceptionally high purity
Jan 1, 1986
-
Gaining Insights into Working within the Mining SectorBy Jeanie Wills, Theresa Nyabeze, Samantha Espley, Donna Beneteau
This presentation reports survey findings that aim to modernize the definition and understanding of the term 'mining.' The survey, conducted via LinkedIn in Winter 2024, garnered responses from a dive
Oct 1, 2024
-
Milestones in the Mining Industry in CanadaBy John A. Allan
Introduction There are times when meditation on the past is worth while. Too often does it happen that in the busy routine there appears t9 be little time for reflection, and little good or benefit t
Jan 1, 1933
-
Beneficiation of Some British Columbia Tungsten OresBy J. M. Cummings
DURING the past year, the writer has investigated the treatment of a variety of British Columbia tungsten-bearing ores. Much of the test-work described in this paper was carried out in collaboration w
Jan 1, 1943
-
The 777 Project — Creating a new futureBy P. R. Jones
"The paper describes the CDN$400 million expansion at Hudson Bay Mining and Smelting Co., Limited’s operations. The company has continuously produced copper and zinc at the Flin Flon metallurgical pla
Jan 1, 2001
-
Progress in Mechanical LoadingBy R. S. Bigelow
Part 1.- Metal Mines Early experiments with mechanical loaders in metal mines were confined largely to machines of the shovelling type and generally air-operated. Although the first application of t
Jan 1, 1931
-
The Lithium IndustryBy R. B. Ellestad
Introduction Lithium has been known since 1817, when it was discovered by the Swedish chemist, Arfvedson, while working in the laboratory of Berzelius on the chemical analysis of the mineral petali
Jan 1, 1948
-
Applications for Continuum Modelling of Brittle Rock Fracture with a Focus on Dilatancy During FailureBy M. S. Diederichs, G. Walton
"Developments in understanding the brittle fracture of rock over the past two decades ultimately led to the acceptance of a cohesion-weakening-friction-strengthening model as an appropriate strategy f
Jan 1, 2015
-
Operational Characteristics of the TankCell® 300 at Codelco's Chuquicamata ConcentratorBy S Grönstrand, C. Perez, A. B. Yañez, F. Coddou, P. Morales, H. Elgueta
"The TankCell® 300 forced air flotation cell designed and built by Outotec, with active volume of over 300 m3, was installed at Codelco’s Chuquicamata concentrator in September 2008. After that, a pro
Jan 1, 2010
-
Criticality-Based Model for Rehabilitating Subway StationsBy M. Abouhamad
According to the Canadian Urban Transit Association (CUTA), 140 Billion CAD is required to maintain, rehabilitate, and replace subway infrastructure between 2010 and 2014. The current practice adopted
Aug 1, 2013