Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    International Commission On Large Dams (ICOLD)

    By Yves Gratton

    The International Commission on Large Dams (ICOLD) is a non-governmental International Organization which provides a forum for the exchange of knowledge and experience in dam engineering. It is the wo

    May 1, 2002

  • CIM
    Preparation and Characterization of Straight Y-Shaped Silica Nanorods by Thermal Chemical Evaporation Method

    By G. Zhu

    The straight Y-shaped silica nanorods have been synthesized on Si wafer by thermal chemical evaporation of mixed powders of silica and graphite at 1300_ and condensation on Si substrate without assist

    May 1, 2008

  • CIM
    Operational Excellence in PS Converting at Saganoseki Smelter & Refinery

    By Hiroyuki Sano, Hiroshi Chida, Katsuya Toda, Takafumi Sasaki

    Saganoseki Smelter & Refinery is one of the largest copper producers in Japan to produce 450,000 tons of new copper annually. Saganoseki used to operate six PS converters with "4 Hot-2 Blow" scheme, b

    Jan 1, 2015

  • CIM
    Remarks Deposits ? on Some Sulphide Volcanic Extrusivest

    By G G. Suffel

    T HESE remarks on the occurrence of strata-bound massive sulphide deposits are submitted be-cause the writer recently visited the principal Cyprus deposits (in January, 1965) and has also a back-groun

    Jan 1, 1965

  • CIM
    Determining the Oil Sands Mining Limit With Lerchs-Grossmann O5ptimization

    By L. Chunpongtong

    ABSTRACT The mining limit in oil sands is regulated by the ratio of total mining volume (ore, interburden, and overburden) one has to mine per volume of bitumen in place (TV/BIP). This paper presents

    Jan 1, 2014

  • CIM
    Determining the oil sands mining limit with Lerchs-Grossmann optimization

    By L. Chunpongtong

    The mining limit in oil sands is regulated by the ratio of total mining volume (ore, interburden, and overburden) one has to mine per volume of bitumen in place (TV/BIP). This paper presents a mathema

    Jan 1, 2014

  • CIM
    Supercharge Your Ore Testing and Characterisation with the JKRBT

    By Peter Rubie, Toni Kojovic, Fengnian Shi

    "Mining companies have recognized that characterization of ore breakage plays an essential role in the design and optimization of comminution circuits.Recently the Julius Kruttschnitt Mineral Research

    Jan 1, 2009

  • CIM
    System thinking for quality management and continuous improvement in mining

    By M. Vallée

    "Geological and technical problems are often considered the most important ones affecting new mining projects. Typical problems and likely causes are reviewed based on current Quality Management and C

    Jan 1, 2003

  • CIM
    Evaluation of a soybean oil based diesel fuel in an underground gold mine

    By Jr. Watts, B. K. Cantrell, K. L. Bickel, J. F. McDonald

    "A field trial was conducted at an underground gold mine to evaluate diesel fuel derived from soybean oil (soy-methyl-esters or “biodiesel”) as an alternative to commercial, low-sulphur, number 2 dies

    Jan 1, 1997

  • CIM
    The Red Dog VIP mill optimization project. Part A: Rectifying the shortage of flotation capacity

    By George Hope, Brigitte Lacouture

    "The Red Dog mine has increased mill throughput most years since start-up. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restricted

    Jan 1, 2003

  • CIM
    Plant Scale Trial of Isobutyl Xanthate at Raglan Concentrator Using Reference Distributions

    By Norman O. Lotter, Dominic Fragomeni, Lori J. Kormos, Guy Comeau, Antonio Di Feo

    "A performance opportunity was identified for the Raglan concentrator operation by changing the selection of xanthate from Potassium Amyl Xanthate (PAX) to Potassium Isobutyl Xanthate (PIBX). This opp

    Jan 1, 2009

  • CIM
    Kiena Maintains Up To Date Image with a New Gold Mill

    By R. Jolicoeur, J. F. Jackson, M. A. Green

    "The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in

    Jan 1, 1986

  • CIM
    Améliorations apportées au minage de la zone 1 à la mine Doyon

    By François Girard

    La zone 1 de la mine Doyon (zone altérée), se situe à l?extrémité sud de la mine et est constituée d?une série de veines étroites à fort pendage et ayant des épontes de très faible résistance. Les épo

    Feb 1, 2008

  • CIM
    Melt Extraction of Gold Fibers and Precious Metal Doped Fibers and Preparation of Porous Gold Fiber Structures

    By Olaf Andersen

    Crucible melt extraction yields short metal fibers with eqivalent diameters as low as 50 µm from almost arbitrary metals and alloys. Highly porous components can be made from such fibers by suitable d

    Oct 1, 2003

  • CIM
    Effect of Porosity on the Tensile Properties of Die Cast Aluminium A360

    By Gheorghe Marin, Franco Chiesa, David Levasseur, Bernard Duchesne

    Over the past 20 years, pressure die casting has evolved to a point where structural parts can now be produced by this process. This has been made possible by the development of vacuum die casting and

    Jan 1, 2015

  • CIM
    Sustainable Mining Practices in India

    By Manish Kumar Jain

    The mineral industry in India is an important contributor to the country?s GDP and foreign trade, and also a significant source of employment generation. The industry is distributed almost all across

    Aug 1, 2013

  • CIM
    Circuit Modifications at Westmin Resources Myra Falls Operations

    By C. Veloo

    "Westmin Resources operates a mine/mill complex at Myra Falls and produces copper and zinc concentrates with minor associations of gold, silver, and lead from a polymetallic, massive sulphide orebody.

    Jan 1, 1992

  • CIM
    Yield Stress Measurement of Cemented Paste Backfill with the Vane Method and Slump Tests

    By A. S. Moghaddam

    The transportation of cemented and non-cemented mine tailings in the form of paste through pipelines is one of the main stages of paste backfill operations. For the purpose of pipeline design, the rhe

    May 1, 2007

  • CIM
    A Review of Advanced Control Applications in Mineral Processing

    By A. Vien, B. C. Flintoff, R. P. Edwards

    "This paper provides a critical review of the development and application of advanced controls in mineral processing at the industrial level. These algorithms can be sub-divided into four broad catego

    Jan 1, 1992

  • CIM
    High Self-Heating Rate of a Pyrrhotite-Rich Material: H2S as a Fuel?

    By James A. Finch, Stéphanie Somot

    "The self-heating facility developed at the Noranda Technology Centre [Rosenblum and coworkers, 2001; 1995] has now been established in the Department of Mining, Metals and Materials Engineering at Mc

    Jan 1, 2006