Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Review of the Geothermal Resources of Papua New Guinea

    By Mosusu N

    Geothermal anomalies of different types occur within distinct geological/structural settings in Papua New Guinea. According to R.F. Herring, geothermal occurrences in Papua New Guinea can be classi

    Jan 1, 1997

  • AUSIMM
    High-resolution Characterisation of Gold Mineralisation at Plutonic Gold Mine, Western Australia – Evidence for the Late-stage Deposition of High-grade Gold

    By R M. Hough, G Duclaux, M A. Pearce, M F. Gazley

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Microcharacterisation, such as that described in this paper, provides understanding of a mi

    Mar 18, 2015

  • AUSIMM
    Maximum Panel Width Determination for Sub-level Caving with Bottom Ore Drawing

    By Adranyl W. W

    Sub-level caving with bottom ore drawing has gained wide acceptance in rich, soft, low magnetic iron ores because it provides moderate ore dilution and ore losses. The main problem here is the high

    Jan 1, 1995

  • AUSIMM
    Comparison of Rock Tunnel Excavation Methods Used on the Melbourne Underground Rail Loop

    This paper describes the programing and specification requirements which affected the choice of excavation methods on the Melbourne Underground Rail Loop (M.U.R.L.). The various methods that were

    Jan 1, 1981

  • AUSIMM
    Improving Truck-Shovel Matching

    By P Knights, M S. Kizil

    Truck/shovel operations constitute 50 - 60 per cent of the cost of open pit mining operations. Mining companies, therefore, are constantly seeking to close the gap between actual truck/shovel producti

    Sep 26, 2011

  • AUSIMM
    The Application Of Bore Core Data To Coal Preparation Plant Design

    By Arnold J. J

    The design of a coal preparation plant using bore core data cannot be discussed without some reference to the wider considerations of design. A thorough knowledge of coal preparation processes and

    Jan 1, 1977

  • AUSIMM
    A Carpenter’s Journey through Forty Years of Underground Mining, Leaders and Leading

    By J Nixon

    I have to say that my story is not too much different to many others who grew up and worked in the great mining fields like Broken Hill, Mt Isa, Rosebery, Kalgoorlie or Kambalda and any one of them co

    Mar 21, 2011

  • AUSIMM
    Analysis of Lead/Zinc Concentrator Flotation Performance at Mount Isa Mines Limited

    By Watsford RMS, Wickham P

    In October 1980 the two existing flotation circuits were combined into a single new circuit. This circuit used modern 11.3 m3 flotation cells which replaced 1.4 m3 units. Sometime after this change

    Jan 1, 1978

  • AUSIMM
    Excavation Design and Mining Methods in the 1100 Orebody, Mount Isa Mine, Australia

    By Sullivan BJK

    The 1100 orebody is a massive copper sul- phide orebody which contains a major portion of the Isa Mine copper ore reserves of 130 million tonnes at 3.2%. The underground mining of a deposit as larg

    Jan 1, 1978

  • AUSIMM
    High Sulfidation Alteration at the Island Copper Porphyry Copper Deposit, Vancouver Island, Canada (8470714d-c97b-4a7f-bf25-8340c867ad44)

    By Simmons SF, Fleming J

    Alteration and mineralisation at the Island Copper deposit is related to the intrusion of Early Jurassic quartz feldspar porphyry dykes into surrounding comagmatic Bonanza volcanic rocks. The pyrophy

    Jan 1, 1995

  • AUSIMM
    The Lake Rotokaua Sulphur Deposit

    The Lake Rotokaua sulphur deposit, near Taupo, New Zealand, is a lacustrine sedimentary ore body, 220 acres in area and from 7 ft to 96 ft thick, containing, within the area drilled to date, some 20

    Jan 1, 1971

  • AUSIMM
    Extraction of 5 Orebody Crown Pillar at the Isa Lead Mine, Mount Isa Mines Limited, Mount Isa, Queensland, Australia

    By G Varley

    This paper describes the mining methods and strategy used to extract the 5 Orebody crown pillar at the Isa Lead Mine over the past five years. The bulk of the crown pillar was extracted by the use of

    Jan 1, 2002

  • AUSIMM
    Who is Responsible for Grade? – An Evaluation of the Value Chain at Mt Magnet Gold Project, Western Australia

    By A Weeks, W J. Shaw, A Kuk

    Grade control is a process that requires the interaction between many components of the mining operation and successful grade control is only realised through good data, robust systems, and a well-tra

    Aug 18, 2014

  • AUSIMM
    On State Assistance to Mining: Methods, Expenditure, and Some Particulars of Results

    JUDGING from the attitude of past and present Parliaments in Australia, it is a' reasonable assumption that encouragement of the principal industries has been adopted as a main principle in the g

    Jan 1, 1911

  • AUSIMM
    Desulphurizing ISF feed by roasting

    By Wright S

    The feed to the Cockle Creek Imperial Smelting Furnace consists of mixed Pb/Zn con- centrates and lead sulphate-containing elec- trolytic zinc plant residues. Roasting was investigated as a means of

    Jan 1, 1986

  • AUSIMM
    A Review of Tower Milling at Hellyer

    By Anderson RJ

    Tower Mills are used at Aberfoyle's newly commissioned Hellyer base metal sulphide concentrator. Hellyer ore is particularly fine grained. To achieve adequate liberation fine grinding is necess

    Jan 1, 1991

  • AUSIMM
    Geotechnical Models and Data Confidence in Mining Geotechnical Design

    By M J. Dunn

    The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l

    Nov 5, 2014

  • AUSIMM
    Hydraulic Fill at Osborne Mine

    By J A. Brown

    Osborne Mine commenced hydraulic filling of three stopes in April 1999. Two of these stopes experienced barricade failures in July 1999 and January 2000. As a result, a review of hydraulic filling was

    Jan 1, 2002

  • AUSIMM
    Servicing the Mining Industry - The Mt. Newman Experience

    To the layman or the casual in- vestor, the critical problems in the mining industry appear to rest on the questions of finding and developing an orebody. The high cost of finding a major orebody

    Jan 1, 1975

  • AUSIMM
    Flotation Chemistry of the Fluorite/Oleate system

    By Mistra M, Hu JS, Wadsworth ME

    The fluorite/oleate system has been studied extensively since the begin- nings of flotation research. The well-defined relatively simple crystal structure of fluorite and its ionic bonding make it

    Jan 1, 1984