Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Tunnelling in Unsolidified Water Bearing Sandstone-Construction of Tsugaru Tunnel (Futamata Construction Section)

    By Kaji S

    The Tsugaru Tunnel, located on the Honshu island approach to the Seikan Tunnel, is 5,880 m long and has a "Shinkansen" cross section of 90 m2 area. The geological formation through which the tunne

    Jan 1, 1987

  • AUSIMM
    A Study of the Chemical Reactions Leading to Spontaneous Combustion of Pyritic to Black at MT Whaleback, Western Australia

    By Thornber MR, Davidson LR

    The cause of spontaneous combustion of pyritic black shale has been studied by calorimetry and other techniques. The conditions required for ignition to occur are: 1. A critical mass of pyritic bla

    Jan 1, 1986

  • AUSIMM
    A Laboratory Study of the Effect of Burden and Spacing Parameters on Rock Fragmentation in Blasting

    By Vutukuri VS, Budavari S

    During recent years many investigators have suggested large spacing to burden ratios to improve the fragmentation obtained in blasting. In spite of these suggestions, most operators still use a conv

    Jan 1, 1975

  • AUSIMM
    New Shotcreting for Ground Support of TBM Tunnelling

    By Takeuchi T, Matsugaki K

    We have developed a new shotcreting which is suitable for the primary support of TBM tun- nelling in soft rock. This spraying compound is made from cement, a special accelerating agent and glass fib

    Jan 1, 1987

  • AUSIMM
    The Development of Mechanised Pipe Jacking in the United Kingdom

    Pipe Jacking has been a recognised method of tunnelling in the U.K. since the early 1950's, although I understand that pipes were pushed blind by the soldiers in the first World War from tren

    Jan 1, 1987

  • AUSIMM
    Research on Dust Control for High Production Longwall Mining in Australia

    By Lama RD

    The paper outlines the development in the control of dust in Australia over the last 20 years. Factors influencing dust make at the faces are discussed. The effect of high production systems is an

    Jan 1, 1988

  • AUSIMM
    Recent Developments and Investigations of D.M. Cyclone Coal Preparations at the BHP Port Kemble Washeries

    By Nightingale R, Johnson B, Bensley C, Vince A, Keast-Jones R

    In order to counter the massive increase in the level of near gravity material that would follow the reduction in dense-medium cyclone separation density at B.H.P. Slab and Plate Product Division&

    Jan 1, 1987

  • AUSIMM
    Minimising Coal Edge Losses in Dragline Blasting Operations

    By Yang RL, Bailey ML

    During overburden blasting operations in dragline pits, coal edge losses along the lowwall edge of the new pit are often experienced. In tonnage terms, losses can be significant. With the thick seams

    Jan 1, 1988

  • AUSIMM
    Prediction of Size Distributions from Compressing Crusher Machines

    During the last few years the quality requirements on roads and railroads have become more accentuated due to the desire to minimise maintenance costs. This has, in turn, led to increasing requireme

    Jan 1, 1995

  • AUSIMM
    Oil Agglomeration of Metal Oxide Minerals

    By Chen J, Zhu D

    A detailed study on oil agglomeration of fine metal oxide particles is presented in this paper. The major content embraces several aspects which may possibly reflect the current trends in oil agglom

    Jan 1, 1993

  • AUSIMM
    An Introduction to the Planning of Development of the Brown Coal Open Cuts of the State Electricity Commission of Victoria

    The brown coal resources of the Latrobe Valley, which include over thirty thousand million tons of coal suitable for open cutting, provide the main source of fuel for the power generation for the Stat

    Jan 1, 1960

  • AUSIMM
    Development of a Sustainable Rehabilitation Strategy for the Management of Acid Rock Drainage at the Historic Mount Morgan Gold and Copper Mine, Central Queensland

    By T Laurencont

    The Queensland Department of Natural Resources and Mines (NR&M) accepted the environmental liability for the Mount Morgan minesite in 1991. This gold and copper mine located 38 km southwest of Rockham

    Jan 1, 2003

  • AUSIMM
    Research on the Harnessing of Ordovician Limestone Confined-Water in Northern China Coalfields

    By Hang G, Hongtian X

    In this paper, it is briefly introduced that China's Ordovician limestone confined-water menaces coal mining and Ordovician water is prevented and cured to secure the safety of coal mining. The

    Jan 1, 1988

  • AUSIMM
    New Developments to Lead Mechanical Underground Excavation Toward the Year 2000

    Drill and blast excavation in underground mining and. civil engineering projects has grad- ually given ground to mechanical boring of tun- nels, shafts and raises during the past twenty years. The us

    Jan 1, 1981

  • AUSIMM
    Equipment Selection for Reclamation and Parting Removal

    By Wright G. N

    Curragh Queensland Mining Limited, a co-venture of Australian and overseas interests, operates an open cut coal mine 13 km north of the township of Blackwater in Central Queensland, refer attached loc

    Jan 1, 1992

  • AUSIMM
    Mathematical Modelling and On-Line Control of Hydrocyclones

    By Eren H

    For a hydrocyclone of fIXed geometry, DC, Di, DO and ? are constants, the variable parameters affecting the performance are Qi, Fi, Du and H. (See Appendix 2 for definition of symbols).The relationshi

    Jan 1, 1990

  • AUSIMM
    The Development of the Aircore Sampling System

    By J M. Wallis

    Heavy mineral sand exploration drilling prior to the 1970s generally utilised open hole auger and air-blast type drilling. However, mining reconciliations were poor and limitations on accuracy and pre

    Oct 5, 2011

  • AUSIMM
    Blast Vibration Control in hunter Valley Coal Mines

    By Moore A. J

    Control of blast vibration requires that its nature and causes be understood, and that effective control procedures be implemented to ensure compliance with limits related to the probability of dama

    Jan 1, 1995

  • AUSIMM
    DynoMiner<sup>TM</sup> APS Underground Explosive Loading System

    This paper introduces a new, safer bulk emulsion loading system for underground mining operations. The features and benefits of the equipment, along with the use of Dyno Nobel Inc patented gassed emul

    Jan 1, 2004

  • AUSIMM
    The Assessment and Management of Coal Recovery in Open Pit Mines

    Scheduling the transformation of in situ coal to run of mine coal and its subsequent beneficiation to a saleable product involves the use of many `parameters&apos; or `adjustment factors&apos;. Thes

    Jan 1, 1998