Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Electronic Detonators ù Banking the Benefits

    Electronic detonators bring a fundamental and radical change to the potential of rockbreaking operations. The immense technical challenge of safely merging electronic systems with explosives has been

    Jan 1, 2004

  • AUSIMM
    Keeping Projects on the Rails

    By J Canterford

    Although we have access to a wide range of sophisticated process design and improvement tools in combination with a significant range of case studies, the mineral resource industry still manages to be

    Aug 8, 2011

  • AUSIMM
    Structure of the Bowen Basin, Queensland, Australia

    By Mallett CW, Hobbs BE

    This study examined the structures of the Bowen Basin in central Queensland, Australia, by a series of lineament analyses. These studies were carried out using published geological maps, NOAA-AVHR

    Jan 1, 1986

  • AUSIMM
    Ultrafine Particles in Flotation

    Particles finer than 10 um often cause problems in flotation. The current under- standing of the nature of the following effects is discussed: slime coatings on particles, carrier flotation, increa

    Jan 1, 1984

  • AUSIMM
    Full-Scale Testing of the PCF Rock Excavation Method

    A small-charge rock excavation method based upon the Penetrating Cone Fracture (PCF) technique has been demonstrated to be capable of excavating the hardest of rocks. The PCF technique involves drilli

    Jan 1, 1993

  • AUSIMM
    Remote Control Loaders for Longhole Open Stopes

    The paper is introduced by some general comments on the Electrolytic Zinc Company West Coast Mines operations. An outline of the geology of the Rosebery Mine orebodies preced- es a resume of the min

    Jan 1, 1977

  • AUSIMM
    Grade Control Strategies and Reconciliation Procedures at Kidston Gold Mine, North Queensland

    The large, low grade, Kidston Gold Mine in North Queensland has achieved outstanding economies of scale and profitability. The total mineable ore reserve including mined to-date (as at December 1993

    Jan 1, 1994

  • AUSIMM
    Theoretical Analysis of Blast Furance Operation Based on the Gas Flow Through Layered Ore and Coke Burdens

    By Muchi I

    To clarify the characteristics of non-uniform flow of gas through layered burdens of ore and coke, flow equations of continuity and motion were solved numerically taking account of the geometrical ef

    Jan 1, 1975

  • AUSIMM
    Pre-feasibility and Feasibility Studies : A case for Improvements

    The paper reviews some characteristic features of feasibility studies and discusses the need for a wide scope at the pre-feasibility stage. The performance of recent Australian gold mines against th

    Jan 1, 1991

  • AUSIMM
    Blasting in an Urban Environment

    By Moore A. J

    Blasting in mines in an urban environment can be conducted safely and within regulatory vibration limits by careful attention to detail and the application of correct techniques. Factors affecting b

    Jan 1, 1997

  • AUSIMM
    Practical Reserve Estimation in a Shear-Hosted Gold Deposit, Zimbabwe

    Evaluation of reserves on a production scale within a shear-hosted gold deposit is complicated by the nature of the mineralisation itself. The 'payable' ground seems to be confined to areas

    Jan 1, 1993

  • AUSIMM
    Energy Reduction at Sulphide Corporation - Two Case Studies

    By Green GR

    Description of two methods developed at Sulphide's Cockle Creek Plant as part of a site energy reduction program. The two case studies are:

    Jan 1, 1985

  • AUSIMM
    Structure Interpretation of Northwest Fergusson Island, Papua New Guinea

    By Billington WG

    A structural study of northwest Fergusson Island, part of the D'Entrecasteaux Group, was undertaken using colour and monochrome aerial photography and Landsat imagery. The resulting interpret

    Jan 1, 1987

  • AUSIMM
    Basement-Cover Relations in the Mount Victor Area, Eastern Highlands Province

    By Arumba J

    In the Mount Victor area of the Eastern Highlands Province, re- connaissance geological mapping and new micropalaeontological data have revealed the existence of at least three small thrust- bound wi

    Jan 1, 1997

  • AUSIMM
    Current Trends in Countercurrent Decantation and Thickener Circuit Operability and Control

    By E Broers, J Goh, S Davies

    With recovery being important in optimising the business performance of a laterite and sulfide plant and with water being a precious resource in Australia, there has been increased pressure for compan

    Jan 1, 2009

  • AUSIMM
    Development of a Dynamic Simulator for CIP / CIL Plant Optimisation and Design

    By Napier-Munn T. J, Morrison R. D, Moloney M. J, Corrans I. J

    A dynamic simulator for CIP / CIL gold recovery plants has been developed at the Julius Kruttschnitt Mineral Research Centre within a collaborative, industrially - funded AMIRA project and with the

    Jan 1, 1991

  • AUSIMM
    The Potential for Cut-and-Break Roadheading Machines in Tunnelling

    This paper describes the principle of cut-and-break rock excavation, in which rock is first undercut, and the undercut material is subsequently broken free by a wedging action. The current work on cut

    Jan 1, 1993

  • AUSIMM
    Direct Copper Smelting

    Direct smelting of copper in a single vessel has long been the extractive metallurgist's dream. Such a process offers the important alvantage. of (i) maximum use of the energy available from oxid

    Jan 1, 1985

  • AUSIMM
    Operations and Control of 32 Feet Diameter SAG Mills at Ok Tedi

    By Katom M

    Each of the two 32 feet diameter Semi Autogeneous Grinding (SAG) mills at Ok Tedi's copper and gold concentrator was treating at best 1500 tph at about 65 per cent mill availability in 1988. Th

    Jan 1, 1997

  • AUSIMM
    Linking the Values of Water to Sustainability

    The value of water is defined by its marginal utility. Challenges arise where the marginal utility is difficult to estimate. Therefore, when two or more interested parties wish to access water and the

    Jan 1, 2006