Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Long-Term Scheduling

    This paper describes modern long-term mine scheduling and gives an example of its application. It then discusses the obstacles to the implementation of such schedules.

    Sep 26, 2011

  • AUSIMM
    South-West Pacific Mineral Royality Regimes

    Almost all the countries of the south-west Pacific and the Australian states have recently completed or have commissioned mineral royalty reviews. The prime reasons for this widespread and consisten

    Jan 1, 1988

  • AUSIMM
    Integrated process modelling for the Kalgoorlie Nickel Smelter

    By G Sartor, A Rich, D Grimsey, R Forzatti, M White

    An in-depth process model was developed for the pyrometallurgical, off-gas systems and water balance of the Kalgoorlie Nickel Smelter. This model was used to assess plant capacity with changing concen

    Aug 21, 2024

  • AUSIMM
    A Geostatistical Contribution to Assess the Risk Embedded in Resource Classification Methods

    By J F. C L Costa, J C. Koppe

    It is recognised by the major international codes that resource classification involves the interaction of numerous qualitative and quantitative criteria such as data quality, geological and grade con

    Jan 1, 2009

  • AUSIMM
    Application of an Integrated Liberation Leach Model for Process Optimisation

    By T D. H McGrath, R Byleveld, W P. Staunton, J J. Eksteen

    "The Gold Technology Group at Curtin University through the AMIRA P420 series of projects has recently developed the integrated liberation leach model (ILLM) for optimisation of gold plants. The model

    Oct 10, 2016

  • AUSIMM
    Theory of Sampling meets the National Science Foundation I-Corps™ program

    By V Rodríguez, M Hormaza, R J. Romañach, C Pinzón-de la Rosa

    The authors have presented their ideas for developing a powder sampling device in the I-Corps™ program sponsored by the National Science Foundation (NSF). This is an intensive customer discovery progr

    May 9, 2017

  • AUSIMM
    In situ observation of phase transition of silico-ferrite of calcium and aluminium

    By H Kim, J Park, J Lee

    Silico-ferrite of calcium and aluminium (SFCA) is a bonding phase in the iron ore sinter. The phase transition upon melting of SFCA was investigated with Differential Scanning Calorimetry and Confocal

    Jun 19, 2024

  • AUSIMM
    Friction bolt performance over the past ten years in Australian mines

    By T M. Nester, D J. Reardon, A N. Page, B J. Barsanti

    The load capacity of a friction bolt has long been regarded as 4 t/m of embedment for ground support design analysis and supported by in situ pull test results. In recent years, the authors have obser

    Nov 29, 2022

  • AUSIMM
    A Case Study on the Assessment, Planning and Extraction of the Crown Pillar at Sunrise Dam Gold Mine

    By M Brockman, M Cowan, A Robeson

    "Sunrise Dam Gold Mine (SDGM) is located 820 km from Perth, 220 km from Kalgoorlie—Boulder and 55 km south of Laverton in Western Australia. The SDGM main pit had successfully operated since 1997 and

    Nov 15, 2016

  • AUSIMM
    Flotation control using froth stability: past, present and future

    By C Smith, J Cilliers, K Hadler

    Unstable flotation froths, that burst before they overflow, produce no concentrate. Increasing the froth stability to improve recovery is therefore an obvious control strategy. Froth stability can be

    Aug 29, 2018

  • AUSIMM
    The Pre-Feasibility Study – Big Choices, Little Time

    By D J. Logan, J Jackson

    "As of 1 December 2014, the 2012 edition of the JORC Code requires Ore Reserves to be defined by studies at the pre-feasibility or feasibility level. This paper examines how the pathway for most minin

    Mar 8, 2016

  • AUSIMM
    Super-Scavenging of zinc Residue by the FASTFLOT Process at Pasmico Mining, Broken Hill

    By Fickera M. A, Marshall S, Burgeese F. L, Burgees J, Estrina H

    A new high intensity flotation process FASTFLOT was deployed to recover residual zinc from the zinc circuit tailings at Pasminco Mining's Concentrator, Broken Hill. Performance of the FASTFLOT

    Jan 1, 1995

  • AUSIMM
    Effect of CaO-FexOy-Al2O3-SiO2 Oxide System on the Reduction of Carbon Composite Pellets

    By H Park, V Sahajwalla

    "Due to the increasing amount of gangues in iron ores, a beneficiation process is required more as a preliminary step for ironmaking process. However, mechanical grinding and washing of iron ore needs

    Aug 12, 2013

  • AUSIMM
    Near field blast vibration monitoring for slot or winze blast analysis

    By E Wargem

    The optimum mining of an orebody in an underground mining operation is fundamental to the mine’s ability to operate both sustainably and efficiently. The effective mining of an open stope or a cave is

    Mar 29, 2023

  • AUSIMM
    Macroinvertebrate Tolerance across a Range of Conductivities in the Isaac River Catchment (Central Queensland)

    By L Stitz, S Kinnear, L D. Fabbro

    Sensitive and tolerant species of macroinvertebrates were present across a wide range of conductivity concentrations in the Isaac River catchment in Central Queensland, indicating the need for further

    Nov 26, 2013

  • AUSIMM
    Automated omission-free geotechnical deformation monitoring – a new method deployable by non-specialists

    By J Franke, C Gonzalez

    One of the regular tasks of geotechnical and mining engineers is the measurement and management of deformation in underground excavations. Although several methods are used to do so, the incumbent met

    Nov 29, 2022

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    Environmental Impact Modelling for In Situ Leaching of Uranium

    By A Roshal

    It is anticipated that many future uranium mines in Australia will be using the in situ leaching mining process. It is fair to say that close to one third of uranium production will be generated by th

    Jan 1, 2008

  • AUSIMM
    Improved mining recovery with bulk ore sorting and MR technology

    By C Beal, S Singh

    Sensor-based bulk ore sorting is a form of preconcentration that autonomously measures and physically separates discrete bulk ‘pods’ of run of mine (‘ROM’) or primary crushed material. This case study

    Nov 10, 2020

  • AUSIMM
    Understanding the causes of dilution in narrow vein stopes

    By S Thomas, S Ricketts, R Hassell

    Northern Star Resources (NSR) operates several operations utilising narrow vein stoping operations in the Kundana area. Stope dilution performance is variable across these operations, with unplanned d

    Mar 15, 2021