Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Upstream Raising of Laterite Nickel Tailings Storage FacilitiesBy D A. Williams, J C. J Boshoff
The properties of tailings that emanate from laterite nickel processing plants are significantly different to most other mine tailings. They typically comprise a mixture of fine materials that are mad
Jul 27, 2015
-
Trident Underground Gold Mine – The First Three YearsBy J Howard
Following discovery in October 2004, commencement of development in February 2007 and first ore production in mid 2007, the Trident gold deposit, located in the Eastern Goldfields of Western Australia
Mar 21, 2011
-
Fragmentation Prediction in Bench BlastingBy Wang S
Fragmentation is the basic concern in rock blasting and serves as the main measure of blasting effectiveness. A good estimation of fragment size distribution before blasting is very useful and helpf
Jan 1, 1990
-
Achieving Sustainable Community Development - Helping Build Appropriate and Resilient Community Governance StructuresThis paper talks about the experiences of groups we have worked with over the last few years in the Asia-Pacific region (Australia, Canada, New Zealand and Papua New Guinea) and the ways that they hav
Jan 1, 2009
-
Phase equilibria of Al2TiO5–Ti3O5 pseudobrookite solid solution in the Al2O3–TiOx system under various oxygen partial pressuresBy W Y. Kim, Y B. Kang, Y J. Park
The phase equilibria in the Al2O3–TiOx system were investigated in wide ranges of temperature and oxygen partial pressure: 1300~1600°C and 10-16.6~10-8 atm, respectively. The equilibrium phases and th
Aug 21, 2024
-
Megablasts – Enabling Technologies in BHP Billiton Iron OreBy B Green
With a focus on safe productive tonnes, there has been an ongoing drive to increase the productivity of the mining fleet across BHP Billiton. In response, a team from the Iron Ore business was formed
Aug 24, 2015
-
Analysis of Stability and Design of Face Support for Cross Passages – Waterview Connection Tunnels, Auckland, New?ZealandBy M G. Wansbone, R Bhargava
The inferred ground conditions for the proposed mined cross passages at the northern end of the Waterview Connection tunnels consist of an overburden of alluvial and residual soils, with mixed face ge
Sep 17, 2014
-
A Comparison of Skip Loading Systems from an Operational, Maintenance, Safety and Capital Cost Estimate PerspectiveBy A E. A Northcote
The drive to maximise performance, reduce maintenance times, improve safety of operation and maintenance on mining equipment while keeping both operational and capital costs down has provided good nou
Mar 21, 2011
-
Design and Development of Slurry Sampling Equipment for Mount Isa On-Stream Analysis EquipmentBy Wickham P, Raeburn M. R
The design and development of slurry sampling equipment for the Mount Isa Mines Limited on stream analysis installations is discussed in detail. Emphasis is given to the critical areas of slurry t
Jan 1, 1976
-
Analysing reduced conveying capability of the orepass systems in Malmberget mineBy T Wettainen, G Shekhar, M Stromsten, B Skawina
The aim of a transportation system in an underground mine is to move the rock masses from one location to another in the most preferable manner by minimising the long and short-term operational costs.
Mar 15, 2021
-
South-west Ventilation Shaft Project at Newstan MineBy D Piason
Newstan Mine commenced mining operations in 1887 and has since undertaken extensive mining within the Young Wallsend, Great Northern, Fassifern, Borehole and West Borehole coal seams using a range of
Aug 31, 2015
-
The Application of Heavy-Media Separation and Static Dry Cleaning of Coal at the Broken Hill Pty. Co. Ltd. Steelworks, NewcastleBy Martin C. H, Met B
INDEX OF CONTENTS:1. Introduction, Explanatory; and Reasons for Coal Cleaning.2. Principles on which Coal Cleaning is based.3. Location of Broken Hill Proprietary Co. Ltd. Plant.4. Description of Proc
Jan 1, 1946
-
The Benefits of Using SmartEar™at Pueblo ViejoBy D Shuen, R Sales, D La Rosa
Semi-autogenous grinding (SAG) mill control is complex and depends on many dynamic process variables. Good control strategies ensure that a mill is operating as close to optimal as possible, resulting
Sep 1, 2014
-
Geometallurgy Data Management – A Significant ConsiderationBy V Liebezeit
Data management is a significant, but perhaps unrecognised, consideration for any organisation embarking on a geometallurgy program. While resource geologists are accustomed to dealing with thousands
Sep 5, 2011
-
Study on Improving Roasting Behaviours and Metallurgical Properties of Brazilian Hematite Pellets by Adding Magnetite with High Sulfur ContentBy Z Li, J Pan, D Zhu, W Zhou
In order to enhance the roasting behaviours and metallurgical properties of hematite pellets, which have the problems of high roasting temperature and low compressive strength, a process of producing
Aug 12, 2013
-
Modelling Blast Movement for Grade ControlBy O Handayani, R Barr, E Isaaks
The mining industry has focused a great deal of attention recently on the impact of blast movement on grade control. Although the problem of blast movement and its contribution to dilution and ore los
Aug 18, 2014
-
Explosive dust management system for underground coalmines, digitally integrating stone dust application, sampling plans, and results to help mitigate explosion riskBy B Waldon, M Valastro
A coal dust explosion is one of the most significant risks in the harsh and complex environment of an Underground Coal Mine (UCM). Reviewing literature, regulations and existing systems surrounding ex
Apr 16, 2024
-
An Approach to High Solids Slurry Pipeline DesignBy M Griffiths
This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she
Aug 8, 2011
-
BioHeap® – Breaking the Grade/Recovery Curve for Nickel ConcentratorsBy J Fewings, T McCredden, S Seet, C Fitzmaurice
"Flotation of nickel sulfide ores are generally constrained by nickel grade and impurity concentrations (notably magnesium and arsenic) in the product delivered to smelters. Being a physical separatio
Oct 10, 2016
-
Simulation Aided Engineering – Integration of Monitoring, Modelling and PlanningBy D Beck
Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o
Mar 21, 2011