Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mineralogical Quantification of Iron Ore SinterBy S Hapugoda, J Manuel, E Donskoi, L Lu
Sinter can constitute up to 80–85 per cent of the total ferrous burden in modern blast furnace ironmaking operations. The mineralogy and microstructure of iron ore sinter play an important role in det
Jul 13, 2015
-
Performance and Acceptance Testing of Main Mine Ventilation FansBy D J. Brake
In most underground mines, the ventilation system is a significant portion of the total mine capital and operating cost and the largest consumer of underground electrical power. The effectiveness of t
Jul 1, 2013
-
The Cenozoic Detrital Iron Deposits of the Hamersley Province of Western Australia – A Tribute to Mal KneeshawBy R C. Morris
Two major types of economic secondary iron ores occur in the banded iron formation (BIF)-rich Hamersley Province of the Pilbara, Western Australia:dominant BIF-hosted bedded iron deposits (BID)detrita
Jul 13, 2015
-
Challenges and solutions for deformation management of Cannington’s hoisting shaftBy A Clarkson
Cannington Mine is an underground silver lead zinc operation located in north-west Queensland which has been in production since 1997. Ore is primarily moved through an underground material handling s
Mar 29, 2023
-
Flotation Process Diagnostics and Modelling by Coal Grain AnalysisBy B Firth, G OÆBrien, B Jenkins
In coal flotation, particles of different components of the coal such as maceral groups and mineral matter and their associations have different hydrophobicities and therefore different flotation resp
Jan 1, 2005
-
Groundwater modelling support for closure approvals at Ranger Uranium MineBy J Sigda, T Jones, D Staggs, J Ewing, C Cheng, J Pickens, S Paulka
Mine-derived solutes from Energy Resources of Australia’s (ERA’s) Ranger uranium mine have been closely monitored for decades. Ranger is surrounded by the Northern Territory’s Kakadu National Park and
Jul 1, 2021
-
A Reconnaissance Map of the Bulolo Gold-Fields, Territory of New GuineaTHE absence of any locality maps of the district of Morobe has been seriously felt by mining engineers engaged on the goldfields, and as it was evident at the beginning of operations that the administ
Jan 1, 1928
-
Evaluation and operationalization of bulk sensing technologies: insights from real world case studiesBy J Rutter, D La Rosa, P Walters, M Scott, L Keeney
Bulk ore sorting technologies, whether surfaced based or penetrative, have seen an increased uptake by the mining industry for preconcentration application. As with all technologies, going through the
Nov 10, 2020
-
The Resistance of Cyclone Underflow Material to Flow LiquefactionBy J Boshoff, D Reid
It has been recognised worldwide that the liquefaction risk of unconstrained tailings stacks or cyclone underflow embankments requires careful consideration. The stability of a tailings deposit where
Jul 27, 2015
-
A Sustainable Future in Management of Dust Emission during Transport of Coal and Iron OreBy J Planner
As Australia’s coal and iron ore export volumes increase to meet international market growth, port terminals, mining operations and rail transport systems can be the source of increased dust emission.
Nov 22, 2011
-
The Path to Best Practice at Geita Gold MineBy M Monaghan, B S. Gregory
The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I
Sep 18, 2012
-
The Hydrogeological Problems of Groundwater Protection in Mining RegionsThe investigations of the Leningrad ruining lilstitute on this problem are carrying out in the following main directions: 1) The analysis and study of contaminants migration at particular sites of m
Jan 1, 1988
-
Hydrogeological characteristics of co‐disposed tailings and coarse rejects from coal processingBy S Fityus, K Koosmen, J Simmons
The purpose of this paper is to therefore investigate the hydrogeological characteristics of tailings, coarse and mixed rejects from coal processing to enable better understanding of the potential for
Jul 1, 2021
-
Derivation of High Reliability Water Quality Guideline Values for Cobalt in Freshwaters – Improving Water Quality Guidelines for Better Water Quality Compliance Management in MiningBy F Butler, G E. Batley, A C. Hogan, A R. Butler
The ANZECC/ARMCANZ (2000) Water Quality Guidelines (the Guidelines) are the primary reference used in Australia and New Zealand for managing and regulating water quality. For most mining operations in
Jun 28, 2016
-
Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based SimulatorsBy P Wood, S Leveritt
This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy
Sep 18, 2012
-
Rethinking Merit for a Sustainable Mining IndustryBy K Hobbs
Mining is experiencing a difficult period of low profitability and declining productivity. To achieve sustainability, mining companies are challenged with improving output, quality and safety while de
Jun 22, 2016
-
Development and Implementation of the CaveCAD Ground Support Module for Cost and Safety Improvements in Block Cave MinesBy S Talu, E Savage, P Sturm, A van As
It is estimated that substandard ground support installations and elements cost the Rio Tinto Copper Group millions of dollars between 2000 and 2014. These issues have also created significant safety
May 9, 2016
-
A Collaborative Model for Developing Future Continuing Education and Training in MiningBy S W. Houlding
The Certificate in Mining Studies program at the University of British Columbia, Vancouver, Canada is a collaborative initiative between mining schools and industry to provide accessible, cost-effecti
Nov 22, 2011
-
Innovative digital tools shaping the future of sustainable sprayed concrete operations and operator trainingBy P Oikkonen
Sprayed concrete has played an integral role in underground rock support for nearly a century. However, concrete is also considered to be one of the biggest environmental problems in construction and
Mar 29, 2023
-
Lihir Gold Five Years On ù Maximising Throughput and Capital UtilisationDuring the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future
Jan 1, 2003