Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
I Think, Therefore I Add Value – Philosophy of Science as a Practical Tool for the Mine GeologistBy J Vann
The philosophical context of many activities in mine geology can be an important lever in adding value to operations. For mine geologists (including resource and grade control geologists) we argue tha
Aug 22, 2011
-
Operating Performance of the Phu Kham IsaMill™By G Harbort, D Zoetbrood
"The Phu Kham copper-gold operation in the Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited holds a 90 per cent interest in Phu Bia Mining Limit
Oct 10, 2016
-
‘It Seemed Like a Good Idea at the Time ...’ Common Mistakes in GeometallurgyBy P Kittler
In the spectrum of mining-related disciplines, geometallurgy sits between resource geology and metallurgical engineering. Unlike its neighbours, it is a relatively young discipline and its concepts, p
Sep 5, 2011
-
Localised Uniform Conditioning in the Multivariate Case - An Application to a Porphyry Copper Gold DepositBy W Assibey-Bonsu
The paper provides a brief review of the multivariate uniform conditioning and the localised multivariate uniform conditioning techniques and presents a case study based on a porphyry copper gold depo
Sep 26, 2011
-
Formulating and Solving Complex Minerals Industry Optimisation Problems û A Systems Approach to Complex Systems ProblemsThe paper provides an overview of the development and content of APCOM symposia since their inception in 1961. This development is set within the context of the academic environment in which much of t
Sep 26, 2011
-
Project Management for All Seasons ù Financial Risk Mitigation in a Challenging WorldBy O C. Aitken
Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark
Jan 1, 2004
-
Selective Mining Techniques - TelferThe Ok Tedi Project has been planned as a selective mining operation since the Feasibility Study. The nature of the orebody, and the need to 'stage' the infrastructure buildup meant that ini
Jan 1, 1986
-
Study of prevention methods for stress corrosion cracking in underground coalminesBy A Crosky, S Saydam, H Chen, H L. Ramandi
Cable bolts and rock bolts are used as primary and secondary anchoring systems in many underground mines. Reports on the premature failure of cable bolts and rock bolts due to stress corrosion crackin
Nov 29, 2022
-
Improving Consistency of Delivery at Mt Rawdon OperationBy M Boon, M Franklin
This paper outlines the journey of cultural maturation and management system development at the Mt Rawdon (MRO) gold mine from its acquisition by Evolution Mining Limited (Evolution) in late 2011 to 2
Jun 22, 2016
-
Computerised Geological Information for Mine Planning at Mt ISA MineCopper grades of diamond drill hole and development samples are determined in the core shed logging area at Mount Isa Mine using a Bulk Mineral Analyser. All geological and grade data on the copper or
Jan 1, 1985
-
Incremental Improvement of Grade Control Models Using Resource DataBy A J. Cornah
"The mine geologist’s role in classifying ore from waste during grade control represents a critical link in the mining value chain. Any improvement in the ore/waste selection success rate (thus reduct
Aug 18, 2014
-
The Sullivan Concentrator ù The Last (and Best) Thirty YearsThe optimal production of the metals needed by society is best achieved by a close synergy between concentrate production and smelting. For over 75 years commencing in 1923, such a close relationship
Jan 1, 2005
-
Parallel Implementation of a Tabu Search Procedure for Stochastic Mine SchedulingBy R Dimitrakopoulos, R Senécal
This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st
Nov 24, 2014
-
Material handling testing and control system requirements for dry stack tailingsBy R Stefansen, T Wisdom, A Nicholson, K Rahal
The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F
Jul 23, 2018
-
Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement ProjectBy M Behrens
The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th
Mar 8, 2011
-
Water Supply at the Warrego Mine, Tennant Creek, Northern Territory (533fe125-f87f-451f-a8a7-f8cc9efcc262)By Ride G
The provision of a water supply is a major consideration in planning mining developments particularly in remote areas. The evaluation and development of adequate water supplies in and areas of Aust
Jan 1, 1980
-
Learning from Simulation at Boddington Gold MineVarious methods and software have been trialled for simulation of Au grades at Boddington Mine. This covers in-house and public software as well as sequential and turning bands methods. The diversity
Sep 26, 2011
-
Characterisation of Metal-Containing Waste Products in Relation to Retreatment Methods for Metal Recovery and RecyclingBy J T. Woodcock
This paper discusses characterisation techniques that can be applied to complex waste products from metal production and processing operations with the aim of devising treatment methods for upgrading
Jan 1, 2004
-
Pre-Drainage of Methane in West German Coal MiningAt the beginning of the seventies pre- drainage of methane was introduced in West German coal mining in order to reduce the gas emission from the worked seam. After three pilot tests on the "Rheinl
Jan 1, 1982
-
Longwall Ventilation with Methane and Spontaneous Combustion û Pacific CollieryBy Rennie J. W
In the first five years of longwall mining at Pacific Colliery, special techniques of goaf sealing, gas drainage, goaf edge ventilation and goaf sampling were developed and used to o crcome the co
Jan 1, 1988