Comparison of bubble coalescence time and thin film balance techniques in studying the interaction of flotation reagents and saltBy G Bournival, Y Pan, S Ata
A custom-made set-up that measures bubble coalescence time and the thin film balance (TFB) technique were used to explore the role of residual xanthate (potassium amyl xanthate, PAX) and salt (NaCl) o
Aug 24, 2022
-
Opening Supports to Segmental Linings – A Novel Shotcrete Support SolutionBy M Burdick, A Harding, M Krulc, M Chappell
Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How
Sep 17, 2014
-
The Evolution of Diamond Drilling Practices at Olympic DamBy J Taylor, A Dubowik
To increase the efficiency and improve the quality of diamond drilling at Olympic Dam, mine geologists have adapted and modified common practices in order to overcome the challenges imposed by such a
Aug 18, 2014
-
Acousto Ultrasonic-Echo (AU-E) and Ultrasound Technology ù Determination of the Lining and Cooling Element Condition of Operational FurnacesBy A Sadri, S Smith
In the metal and mineral industry, different empirical techniques are used to estimate the remaining thickness of the lining within an operating furnace. The disadvantage and costly factor when using
Jan 1, 2006
-
The Development of a Zinc-Based Touch-Up Solder for General Galvanised ProductsBy Zervoudis J
Limitations of current touch-up solders for galvanised steel include coating thickness control problems and poor corrosion and abrasion resistance as well as health and environmental concerns due to
Jan 1, 1993
-
The Fan Installation at Laleham CollieryUnderground mine ventilation is now com monly simulated on a digital computer. Such a programme, incorporating natural ventilation has been modified by others to account for methane emission and el
Jan 1, 1983
-
The Wedge Theory of Borehole Charge Design for Bench Blasting and Its Numerical SimulationBy Q Yu, G Ren, Z-Y Chen, J Yang
The wedge shape theory of the rock fragmentation range in bench blasting is presented according to the dynamic characteristics of rock fragmentation by blasting in open pit under the condition of hole
Aug 24, 2015
-
A Methodology for Geometallurgical Mapping and Orebody ModellingBy L Keeney
Geometallurgy is not a mechanism designed to replace current geological and metallurgical deposit characterisation but an added component required to understand orebody variability. Current geological
Sep 5, 2011
-
Grade control and deleterious materials in polymetallic depositsBy R J. Goldie
The Monty Copper Gold Deposit is an ultra-high grade mine in Sandfire Resource’s Doolgunna region which was completely drilled out and developed within two years of commencing mine development. During
Mar 22, 2022
-
Multiparallel Fan Method to Prevent Significant External Air Leakages through a Goaf Area of a Shallow Covered CoalmineBy F Wu, H Wang, W Chen
A pressurisation method with multiparallel fans has been adopted at HongLiuLin Coalmine to control the significant external air leakage through the goaf area of coalface 15207. Potential damaging effe
Aug 31, 2015
-
Geostatistical analyses of cone penetration testing data of a tailings storage facility in a semi‐arid settingBy P Chapman, B Moosapoor
The objective of this paper is to present the potential applications of geostatistical analyses in planning CPTu investigations, as well as interpolation of CPTu data. The paper presents a case study
Jul 1, 2021
-
Mathematical and Physical Simulation of Non-Uniform Liquid Drainage in Packed BedsBy Pinczewski WV, Nowak LP, Tanzil WBU, Jenkins DR, McCarthy MJ
An experimental and theoretical study has been made of the drainage behaviour of two-dimensional packed beds drained from an outlet in the sidewall of the bed in order to identify the fundamental m
Jan 1, 1981
-
Mid Sampling and Reserve Estimation Practice in the Base Metal OrebodiesThe Mount Isa mine in North West Queens- land produces a total of nearly 10 million t/yr from separate copper and silver lead zinc orebodies. Sampling information is mainly obtained from diamond dr
Jan 1, 1987
-
Geometallurgical Modelling Techniques Applicable to Prefeasibility Projects – La Colosa Case StudyBy P A. Montoya
La Colosa is a world-class porphyry Au project located in Colombia, currently undergoing prefeasibility analysis. As part of collaboration between AngloGold Ashanti and the AMIRA P843A GeMIII Project,
Sep 5, 2011
-
Interparticle Breakage of Very Fine Materials by Alternating Crosswise Stressing with a High PressureBy Reichardt Y
Fine feed fractions in the size range from 1 to 40 ¦m of materials with different hardness as limestone and silicon carbide have been stressed in two different devices. A tungsten-carbide-blodc allo
Jan 1, 1993
-
Smoothed Particle Hydrodynamics Modelling of Blast-induced Fracture Processes in Naturally Jointed Rock MediumBy D Deb, R Pramanik
This paper presents a generalised methodology in smoothed particle hydrodynamics (SPH) framework to analyse dynamic failure process of rock mass having natural joint under blast-induced stress wave an
Aug 24, 2015
-
Primary vertical Crafter Retreat Mining at the Zinc Corporation, LimitedBy Hebbard GJ
Vertical crater retreat mining is being used at Zinc Corporation, Limited and New Broken Hill Consolidated, Limited for pillar recovery between previously mined and filled stopes. In order to increase
Jan 1, 1985
-
A Review of Fatal Outburst Incidents in the Bulli SeamBy Singh RN
The Bulli Coal Seam, located in the Illawarra Coalfield of New South Wales, has a long and varied history of sudden outbursts. From available information this problem has resulted in twelve fatalities
Jan 1, 1998
-
Palaezoic Arc Related Volcanism on the Bolivian AltiplanoThe rocks of the Serranias Chilla massif of Bolivia are a suite of metamorphosed Palaeozoic basalts and associated continental sediments. Whole-rock trace element geochemistry of the basalts suggest a
Jan 1, 1990
-
Mining Practice at Mammoth MineBy Mitchell M. A
The steeply dipping Mammoth orebody is mined by Gunpowder Copper Limited using a sub- level uphole bench stoping method at a mining rate of 350 000 tonnes per year. of three per cent copper ore. Acc
Jan 1, 1974