Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Predicting Iron Ore Fines Shipment MoistureBy J E. Everett, D Linden, P Maney
In response to the implementation of a new schedule for iron ore fines in the International Maritime OrganizationÆs (IMO) International Maritime Solid Bulk Cargoes (IMSBC) Code, improved measures for
Aug 12, 2013
-
Monitoring Design and Data Management for a Multiwell CO2 Storage/Enhanced Coalbed Methane Test in a Stacked Coal Reservoir, Buchanan County, Virginia, USABy S J. Schafrik, C Keles, C Schlosser, E S. Gilliland, A K. Louk, N S. Ripepi, S Keim, J Amante, E Diminick
Three legacy coalbed methane production wells have been converted to injection wells for a one-year carbon dioxide (CO2) injection test to evaluate the potential for CO2 storage in the coal reservoir
Nov 4, 2015
-
Ventilation Surveys and Model Building - A ConsultantÆs OpinionBy J Rowland
"This paper was primarily put together in order to demonstrate what are believed to be acceptablestandards, in relation to ventilation surveys and the subsequent model assembly process. Thiswas brough
Jun 1, 2012
-
Can robots break the drill and blast bottleneck in underground roadway development in hard rock?By M Berner, N A. Sifferlinger, E Fimbinger
Today, the advance rate of underground roadway development by drill and blast operation is limited by the need to ventilate the toxic blast fumes after each cycle. In deep mines this usually is only p
Sep 1, 2024
-
Sampling Systems for Process Control and Metallurgical AccountingBy F F. Pitard
The optimisation of a metallurgical plant requires two kinds of sampling systems. The first provides samples to follow process changes, so in due time actions to maintain key parameters within pre-est
Jul 29, 2014
-
Savage River Mines The World's First Long Distance Iron Ore Slurry PipelineBy Davis RA, Wasp EJ, Cowper NT
The transportation of solids by pipeline is not new. In 1891 a United States patent broadly covering a method of pumping coal with water was granted to W. C. Andrews. His pilot plant was constructed
Jan 1, 1969
-
Development of the 1 in 5.3 Conveyor Decline at Ridgeway Gold MineLocated 350 km west of Sydney and 20 km outside Orange, NSW, lies the Ridgeway Gold Mine û NewcrestÆs flagship Underground Gold Mine. Key to success at Ridgeway has been the fast tracked development o
Jan 1, 2002
-
Lunar sub-surface temperaturesBy T Warren, A Dempster, N Barnett, J Oh, S Saydam
The influence of the insulating properties of lunar regolith was shown in the sub-surface temperature tests performed by the Apollo missions, with no significant temperature fluctuations occurring bel
Nov 29, 2022
-
Problems Associated with Sampling and Assaying for Gold in Mill Feed at Peko Mines Ltd.Prior to 1972, Peko Mines Limited at Tennant Creek used a central mill at Peko, which consisted of a gravity circuit, flotation and cyanidation of tailings, to treat their gold ore from surroundin
Jan 1, 1978
-
The Planning and Methods Used at Selby in the Design of High Productivity SystemsBritish Coal's Selby Complex is the newest producing mine in the United Kingdom. The reasons behind its origins, planning and design are explained. Some detail is given of equipment used, with th
Jan 1, 1991
-
Saprolites, Structures and Slope Angles - Applying Site-Specific Geotechnical and Mining Knowledge to Achieve the Final DesignBy E C. F Hamman
Sunrise Dam Gold Mine is a large open pit mine 730 km NE of Perth, Western Australia. Contract mining commenced in the open pit in September 1996 in lake clays and saprolites with the first fresh rock
Jan 1, 2007
-
Improved hydration management on Australian mine sites with the MX3 hydration testing systemBy T Kilpatrick
Managing heat stress on Australian mine sites is a complex and enduring challenge due to the combined and variable contribution of environmental conditions, physical activities, and protective equipme
May 5, 2022
-
Simulating Time versus Mass Basis?SamplingBy J Ta’ala, M Handyside
Mechanical sampling from conveyors has historically been a staple in the iron ore industry when information related to chemistry, sizing and moisture is required. In order to comply with ISO 3082:2009
Jul 29, 2014
-
Preconcentration in the pit – size mattersBy T BoBo, D La Rosa, P Cameron
Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u
Nov 10, 2020
-
How to select appropriate instrumentation to safeguard TSFs against credible failure modesBy P J. Chapman
Recent catastrophic failures of tailings storage facilities (TSFs) continue to highlight the need for a detailed understanding of failure modes and the defences that are in place within the design to
Jul 1, 2021
-
Kopanang Mine Rail Haulage Tramming SystemWith the theme of û æUnderground Ore Handling SystemÆ, Kopanang Mine completed an extensive project on a specific system with technologies for the handling of ore from a dedicated drawpoint to the sha
Jan 1, 2005
-
Risk management for minesite closure planning and execution – start now! Lessons from the closure of the Leigh Creek Coalfield, South AustraliaBy A Querzoli, B Williams
In late 2014 the Flinders Power Management Team was executing business improvement plans to ensure continued electricity generation until 2028 and beyond. Six months later, in June 2015, the Board ann
Jul 25, 2018
-
Improvement of Existing Ore-forming Models Due to Systematic Sampling During Mining – An Example from Kambalda, Western AustraliaBy C Laming, S Staude, D Hammond, S Sheppard, J Griffith, S Stanfield, S Marriott
Long Operations is located on the eastern slope of the Kambalda Dome in Western Australia. Kambalda hosts nickel deposits that are modelled to have formed from an exsolving sulfide melt from a parenta
Aug 18, 2014
-
The Strength Properties of Fibreglass and Other Polymer-based Dowels for Strata Reinforcement in CoalminesBy A Mirzaghorbnali, D Gilbert, R Burton, J Nemcik, N Aziz
Glass-reinforced polymer bolts, commonly known as fibreglass dowels and fibre-reinforced polymer or plastic bolts or plastic dowels are increasingly applied for strata reinforcement in mines as well a
Nov 5, 2014
-
Thermodynamic modelling of species distribution in AlCl3:BMIC saltsBy M K. Nahian, R G. Reddy
The thermodynamic model for species distribution in aluminium chloride (AlCl3) and 1-butyl-3- methylimidazolium chloride (BMIC) system was developed. The experimental thermodynamic data, considering a
Aug 21, 2024