Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Developments in Equipment Used for Overburden Removal and Coal Winning in the Brown Coal Industry Part 1 Excavation Equipment

    The brown coal deposits of the Latrobe Valley are ideal for open cut mining and this method has been used since the start of coal winning in 1894. Operations at the main Yall9urn open cut commenced in

    Jan 1, 1960

  • AUSIMM
    Numerical Simulation of the Drainage in a Mining Stope Filled with Hydraulic Bakcfill

    By Servant S

    In the mine of this study, cemented hydraulic backfill is placed under the form of a slurry at a percentage of solid by weight varying from 50 to 65 per cent. This slurry settles and cures in the st

    Jan 1, 1998

  • AUSIMM
    Climate Related Adaptation from Terrain Evaluation Results (CRATER) - Interpretation of Pre-existing Data for Mine Site Flood Vulnerability and Management

    By M Grigorescu, J H. Hodgkinson, H Alehossein

    A new framework that collates and interprets pre-existing data to assess vulnerability and ultimately plan to avoid or minimise flood-related risk to infrastructure, people, downtime, environment and

    Nov 26, 2013

  • AUSIMM
    Behavior of Minor Elements in the Roasting of Zinc Concentrate

    By Kato T, Eguchi M, Seino T, Itagaki K, Kimura T, Muto T, Shimizu T, Kobayashi T

    Behaviour of minor elements in the dust collecting system connected with fluidized bed roaster for zinc concentrate was investigated by use of the bench scale experimental appara- tus. The dust col

    Jan 1, 1980

  • AUSIMM
    Effects of Specific Charge and Electronic Delay Detonators on Fragmentation in an Aggregate Quarry – Building Fragmentation Model Design Curves

    By M Olsson, U Nyberg, K Widenberg, P Svedensten, F Ouchterlony

    During 2007 and 2008, the project Optimal Fragmentation in Blasting II was conducted at the Långåsen quarry of NCC Roads AB near Arlanda. The main goals were:an evaluation of the effect of u

    Aug 24, 2015

  • AUSIMM
    Open Pit Production Scheduling Optimisation - Why the Mining Industry Needs a New Phase Design Approach

    The long-term production schedule of open pit mines that maximises the net present value (NPV) of a given project relies on the proper design of phases (pushbacks) within the ultimate pit limits. Ther

    Dec 6, 2010

  • AUSIMM
    Immersible Probes Eliminate Sampling in On-Stream Analysis

    By Stump NW

    Until a year ago all isotope on-stream analysis utilised flow cells similar to those designed for conventional X-ray on-stream analysis. These systems incorporated a fairly complex sampling system n

    Jan 1, 1971

  • AUSIMM
    Evolution of the Continuous Miner

    This paper will trace the development of underground coal mining machinery from the days of the tiny air-powered machines to today's 60-ton electric-powered continuous miners. Some important d

    Jan 1, 1978

  • AUSIMM
    Design and Use of Backfill for Support in Polish Coal Mines (80b269b9-766a-4488-9ab9-f96403287b88)

    By J Palarski

    Over the last 100 years in the Polish mining industry considerable work has been done to assess optimum slurry, develop flexible delivery systems and adjust the fill technology to a wide variety of

    Jan 1, 1998

  • AUSIMM
    Proneness of competent over-stressed intact rock to violent fracturing

    By B L. Sainsbury, M F. Lee, A Penney

    For most practical rock engineering purposes, stress versus strength conditions around underground openings for which rock masses fail and their various modes of failure, are reasonably well-understoo

    Nov 30, 2018

  • AUSIMM
    Local Scale Estimation of Sublevel Cave Stocks - Is it Possible? A Case Study in Reconciliation of Metal Production, Ridgeway Mine, New South Wales

    By T O&apos, Sullivan

    Reconciliation of metal production from a sublevel cave (SLC) mining operation is a complicated process. SLC reconciliation is unlike reconciliation for open stope operations, where a tonnage of extra

    Jan 1, 2006

  • AUSIMM
    Applications of Exhaust Steam Turbines to The Power Plants of Mines.

    The cost of power is an important matter to mining companies generally and this thought that the members of the Australasian Institute of Mining Engineers, as well as the engineering and mining profes

    Jan 1, 1911

  • AUSIMM
    The Augmented Mine Worker – Applications of Augmented Reality in Mining

    By J Bassan

    The mining industry is faced with imperatives to improve worker safety and productivity, adapt to skills shortages, high worker turnover rates, and provide more effective maintenance to new and ever m

    Nov 22, 2011

  • AUSIMM
    Integrated Automatization of Longwall Mining System

    By Esaki M, Nishimura K

    This paper describes the results of the field application tests at Miike Colliery on the integrated automatization of the longwall mining system for medium thick coal seam. The purpose of the rese

    Jan 1, 1987

  • AUSIMM
    Assessment of Environmental Quality Impacts Caused by Red Mud Storage Facilities in China

    By S Zheng, Y Zhang, Z Wen, S Ma

    Red mud (RM) is a solid waste product generated during alumina refinery process, and is usually stored in SFs (SFs) because it canÆt be disposed of easily. In this paper, environment degradation cause

    Jul 10, 2012

  • AUSIMM
    Flotation Testing of a Base Metal Ore From White's Orebody, Rum Jungle, N.T.

    The base metal ore from the hanging wall of White's orebody at Rum Jungle, N.T., is composed of copper and oth.er sulphides in a rock described as a phyllite,.which consists essentially of micace

    Jan 1, 1959

  • AUSIMM
    Sensitivity Analysis and the Mine Development Decision

    Traditionally, the development of a mineral resource project goes through a fairly set pattern of decisions from what commodities to search for; where to look; how to locate; what are the reserves

    Jan 1, 1983

  • AUSIMM
    In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine

    By A H. Gray

    Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov

    Aug 8, 2011

  • AUSIMM
    VHMS Mineralisation in NW Papua New Guinea

    By K Akiro

    Volcanogenic massive basemetal sulphide and gold mineralisation of predominantly low sulphidation style has been located within Lower Tertiary basaltic and felsic volcanic and sedimentary sequences at

    Jan 1, 1999

  • AUSIMM
    Stope-Survey Practice at Mount Lyell

    By Coulter L. J

    THE method of stope surveying as practised at the Mount Lyell Company's mines has been evolved out of the exigencies created by special conditions. It presents some novel features, and has proved

    Jan 1, 1915