Search Documents

  • AUSIMM
    Continuous Measurement of Liquid Retention and Drainage in Porous Media

    The amount of liquid retained in a porous bed is determined by weighing a column containing the bed.The column is attached to the free end of a cantilevered beam, and changes in weight are determined

    Jan 1, 1968

  • AUSIMM
    Demonstration of Solid-Liquid Separations Using Recycled Supernatant that Contains Temperature-Responsive Polymer

    Demonstration of Solid-Liquid Separations Using Recycled Supernatant that Contains Temperature-Responsive Polymer The effective use of recycled supernatant that contains temperature-responsive floccu

    Sep 13, 2010

  • NIOSH
    OFR-131-76 Feasibility Of Using Large Tractor Dozers In The Surface Mining Of Coal And The Reclamation Of Mined Areas ? Summary

    This study was conducted to determine the feasibility of using large tractor dozers in land reclamation of strip-mined areas. The procedures used are patterned after engineering models developed for e

    Jan 1, 1975

  • SME
    The Price Is Right?Planning Large Water Tunnel Contracts In New York

    By Christian Maguire

    Tunnel contracts in New York have in recent years had few bidders with the bids received being much higher than anticipated. Since 9/11, security has become a key issue in planning key infrastructure

  • SME
    Industrial Minerals 2004 - Nitrogen

    By D. A. Kramer

    Ammonia, the principal source of fixed nitrogen, was produced by 16 companies at 31 plants in the United States during 2003. Fifty-five percent of U.S. ammonia production capacity was centered in Lou

    Jan 1, 2005

  • NIOSH
    OFR-45-76 Fire Alert Systems For Metal And Non-Metal Mines

    By John P. Wagner

    The details of a three-phase study (total time period of 12 months) entitled ?Fire Alert Systems for Metal and Non-Metal Mines,? are presented. Phase 1 consists of a state of the art survey on fire de

    Jan 1, 1975

  • NIOSH
    The Modern Evolution of Hearing Conservation Regulations

    By Theresa Y. Schulz

    It is interesting to study the noise standards that have been promulgated in the US over the last decade or so. These regulations are likely to have long-lasting impact. The Occupational Safety and He

  • NIOSH
    RI 5443 Air-Cooled Crucibles For Cold-Mold Arc Melting ? Summary

    By M. M. Kirk

    Forced-air cooling of cold-mold arc furnaces for melting zirconium and similar metals has been investigated and found to be practical from the stand-point of heat transfer. It is believed that this te

    Jan 1, 1959

  • DFI
    Positive Cut-Off Wall in Indian Dam – A New Technique for Difficult Geology

    By Steni Stefani, Sanjay Dave

    "This paper describes an innovative method, used for the first time in India, for the construction of a 1.0metre-thick positive plastic concrete cut-off wall (CoW) at the upstream toe of the dam at th

    Jan 1, 2017

  • SME
    Extensible Conveyor Systems For Long Tunnels Without Intermediate Access

    By Dean Workman

    Long extensible conveyor systems are an important option for efficient tunnel excavation where intermediate access is impractical. The conveyor system designed for the Pula Subbaiah Veligonda Tunnel

  • SAIMM
    Annual General Meeting of the Institute

    The Annual General Meeting of the South African Institute of Mining and Metallurgy was held in Kelvin House on Wednesday, 25th August, 1976. Dr R. E. Robinson, (President) was in the chair, and decla

    Jan 10, 1976

  • NIOSH
    NIOSH Research for Monitoring and Controlling Methane at U.S. Underground Coal Mining Operations

    NIOSH research has focused on the monitoring and the control of methane levels in active mine workings. Response times for instrumentation using catalytic heat-of-combustion sensor technology were eva

    Jan 1, 2008

  • ISEE
    Environmentally Motivated Tracking of Geologic Layer Movement During Bench Blasting Using Discrete Element Methods

    By Dale S. Preece

    The blast-induced movement and final location of geologic layers that may cause environmental problems can be predicted using discrete element methods. This prediction capability can be used by mine o

    Jan 1, 1994

  • SAIMM
    Considering in situ grade variability during mining sequence

    By R. Peroni, J. Kopp

    Mine planning and scheduling is based on using a geological model for the deposit. Blocks are used to discretize the deposit into mineable volumes where grade values are assigned. Traditional estimati

    Jan 1, 2003

  • SME
    EPB TBM Tunnelling in Singapore Old Alluvium

    By N. Loganathan, Tan Boon Tee, Joe O’Carroll, Richard Flanagan

    In recent years, tunnelling activities in Singapore have increased considerably with the construction of extensions to the existing sub-surface transport system, a deep tunnel sewerage disposal system

    Jan 1, 2005

  • SME
    Mining And Community Development: From Rethoric To Practice

    By E. Sirolli

    In recent times, with rare exceptions, most economically viable ore discoveries have been large, low-grade and located in remote parts of the world. Mining companies have often shown to be incapable o

    Jan 1, 2012

  • AIME
    Secondary Recovery - Reservoir Heating by Hot Fluid Injection

    By J. C. Martin

    Stmplified equations are developed for the flow of fluids in gas drive reservoirs in which the effects of gravity can be neglected. The results show that the pressure distribution is governed by a non

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • SME
    International Project Management: Challenges For a Junior Mining Company

    By Andrew Kaczmarek

    The mining industry is enjoying a much needed and long awaited increase in demand for natural resources. However, consolidations in the mining and mining service industries, along with a generational

    Jan 1, 2006

  • AUSIMM
    Integrating Bulk Ore Sorting into a Mining Operation to Maximise Profitability

    By P Holtham, K Duffy, W Valery, A Jankovic

    As high grade ore deposits are depleted, remaining deposits are generally lower grade and require the mining and processing of larger volumes of material per tonne of product. These low grade deposits

    Sep 7, 2015