Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Evaluation Of Devices To Prevent Construction Equipment Backing IncidentsBy Todd M. Ruff
Blind areas around construction equipment are a major contributing factor in incidents involving a piece of equipment striking a worker. In highway construction, these types of incidents result in an
-
Opttimisation of development layyouts for retreat longwall mining with particular reference to the Australian coal minesBy R D. Lama, A Misra
One of the major factors restricting an increase in the productivity of a longwall mine is lower productivity obtained in a development panel. There has been a significant improvement in gate road dev
Jan 9, 1996
-
Commissioning of the Barrytown Ilmenite Pilot PlantBy T Wootton
The Barrytown ilmenite pilot plant was commissioned in two stages using Westport Titanium Project heavy mineral concentrate. The wet concentrator was commissioned on the 17 December 1989 and produced
Jan 1, 1990
-
OFR-41(1)-74 Trapped Miner Location And Communication System Development Program - Volume I - Development And Testing Of An Electromagnetic Location Systems ? Part I - Development And Testing Of A CW Electromagnetic Location System ? 1.0 IntroductionBy A. J. Farstad
The principle objective of the research effort described herein was to identify as rapidly as possible a practical trapped miner location system. Much effort has been expended in the past on the devel
Jan 1, 1973
-
RI 9423 - Hybrid Fiber-Optic Electrochemical Carbon Monoxide Monitor (93ced812-b484-429d-955b-fb446f9048f5)By J. E. Chilton
The U.S. Bureau of Mines has developed an intrinsically safe carbon monoxide (CO) monitoring system for mines by coupling a fiber-optic data telemetry (FODT) system with a prototype electro-chemical C
Jan 1, 2010
-
Market Driven Performance Improvements at BrunswickBy L. Flett, S. Woods, C. Deredin
"Following a significant reduction in world Imperial Smelting Furnace (ISF) capacity from 2003 to 2008, a major optimization initiative was successfully carried out on the lead upgrading and bulk (zin
Jan 1, 2013
-
Design Concepts For Tomorrow’s Optimized Solvent Extraction Mixer SettlerBy B. Gigas, M. Preston, M. Giralico
Optimized mixer settler designs will now handle total flows of over 6,000 m3/hr.Computational Fluid Dynamics (CFD) is a timely and predictable tool for design development. Lightnin has the capability
Jan 1, 2004
-
RI 4464 Sheath Working Of Metal PowdersBy J. R. Long
The investigations described herein are concerned with a portion of a systematic research, by the Federal Bureau of Mines on ductile titanium. The Bureau's work on the metal has resulted in devel
Jan 1, 1949
-
RI 7858 Chemical Analysis of Slickensides From Coal Mine Roof ShaleBy George A. Savanick
Coal mine roof shales fracture preferentially at slickensided surfaces because of weak or nonexistent adhesion between two slickensided rock surfaces. The purpose of this Bureau of Mines research was
Jan 1, 1974
-
Development Of A Novel Three-Step SX Process To Recover Copper From An Acidic Solution (VOLUME 105)By R. Minango
Solvent extraction of Cu from acidic leach, using an oxime extractant, e.g. LIX 984 or Acorga is a well-known and establishedprocess. As the process advances, Cu is extracted to the solvent and is r
Jan 1, 2005
-
Applications of Fuzzy Theory‑Based Approaches in Tunnelling Geomechanics: a State‑of‑the‑Art Review - Mining, Metallurgy & Exploration (2023)By Vhutali Carol Madanda, FHATUWANI SENGANI, François Mulenga
The first introduction of fuzzy theory in the nineteenth century created room for continuous research and application in various fields. Fuzzy set theory has been globally applied in geotechnical engi
May 15, 2023
-
SP 13-94 - Bureau of Mines Publications and Articles, 1992-93 with Subject and Author indexThe U.S. Bureau of Mines (USBM) was established in the public interest to conclude inquiries and scientific and technologic investigations on mining and the preparation, treatment, and utilization of
Jan 1, 2007
-
Load Transfer Curve of Piles in Sands under Uplift ForcesBy Jogeshwar P. Singh, Aser I. Abbas, Mohamed Ashour
The presented methodology predicts the pile head response (i.e. pile head load - displacement curve) and develops the load transfer (t-z) curve of piles in sandy soils under tension forces based on so
Jan 1, 2018
-
IC 6880 Mining Methods And Costs Of The Park City Consolidated Mines Co., Park City, Utah ? IntroductionBy Gloyd M. Wiles
The property of the Park City Consolidated Mines Co. is situated in the northeast part of the Park City dining district 1 mile east of the town of Park City. The elevation at the collar of No. 1 shaft
Jan 1, 1936
-
Increasing the Scale and Scope of Mixing TechnologyThe paper discusses the special mixing requirements for Metallurgical Plant Design and outlines the problems associated with the agitation in Mineral Processing Industry today. It also covers new appl
Jan 1, 2004
-
Mining Geology in the Coeur d'AleneBy Oscar H. Hershey
COMPLAINT has been made that in the literature of economic geology the work of the "company or practical" mining geologists does not get enough attention. I propose to attempt to overcome this com¬pla
Jan 1, 1933
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, OhioBy Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
Ergonomic Assessment of Musculoskeletal Disorders Among Surface Mine Workers in India "Mining, Metallurgy & Exploration (2021)"By Aruna Mangalpady, Sandeep Kumar Jeripotula, Govinda Raj Mandela
Injuries due to work-related musculoskeletal disorders (WMSDs) are not uncommon in heavy industry like mining. Researchers acknowledged that occupational exposure to ergonomic risk factors is the chie
Mar 13, 2020
-
OFR-23(D)-87 Coarse Coal Hydrotransport Testing At The Hydraulic Transport Research Facility - 2-Inch By 0 ROM Coal, 12-Inch Pipeline: R205By Michael E. Henderson
The U.S. Bureau of Mines (BOM) constructed the Hydraulic Transport Research Facility (HTRF) to investigate the hydraulic parameters relating to the transport of coarse coal. To achieve these goals in
Jan 1, 1985
-
OFR-113E-93 Coal Mine Injury Analysis: A Model For Reduction Through Training - Volume VI: A Loss-Control-Based Safety Training Program: Continuous-Miner WorksiteBy C. J. Bise
One area of study for the Coal Mine Injury Analysis project was to illustrate how loss control can be used as a foundation for mine safety training. After an initial review of the principles of loss c
Jan 1, 1993