Search Documents

  • CIM
    Forum on "Ball Mills Using Steel Vs. Pebble Mills

    By J. M. Hemstock, H. L. Ames

    THESE forums have been held annually since they were introduced by Mr. L. E. Djingheuzian in 1957. The response of millmen to questionnaires such as the one this year is ample evidence of the interest

    Jan 1, 1961

  • ISEE
    The Effects of Underground Blasting on Nearby Pre-existing Structures

    By Scott Rosenthal, Logan Connolly

    Butte, Montana holds a prestigious place in the history of mining, deemed “The Richest Hill on Earth,” containing a plethora of underground mines. The Orphan Boy/Orphan Girl underground mines, on the

    Jan 1, 2018

  • CIM
    Huronian geology and the Blind River (Elliot Lake) uranium deposits

    By James A. Robertson

    "In the Blind River area Proterozoic clastic and sedimentary rocks and minor volcanic rocks (The Huronian Supergroup) uncomformably overlie and trangress northwards over dominantly granitic Archean te

    Jan 1, 1986

  • AUSIMM
    Driving the 1,480 Ft Level at the South Mine, Broken Hill

    A drive, 3,500 ft long, was planned to explore mineralization exposed by diamond drilling. A rate of advance of 150 ft per fortnight, approximately double previous Broken Hill rates, was required. Sub

    Jan 1, 1965

  • NIOSH
    OFR-20-78 Demonstration Of Fire Suppression Systems On Underground Mining Equipment

    By Ferdinand Roehlich

    An evaluation of the use of manually activated, installed,. dry chemical fire protection systems on underground metal and nonmetal mine vehicles is described. In addition, an assessment of the possibl

    Jan 1, 1977

  • CIM
    Fabrication of Gold Nanoparticle Superlattices and Their Optical and Electronic Properties

    By Toshiharu Teranishi

    When we apply the Au nanoparticle superlattices to the future nanooptical and nanoelectronic devices, the control of not only the particle size but also the interparticle spacing and symmetry of super

    Oct 1, 2003

  • DFI
    Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - Introduction

    By P. A. Neill, O&apos

    The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee

    Jan 1, 1994

  • NIOSH
    IC 6412 Mining Practice At The Chino Mines, Nevada Consolidated Copper Co., Santa Rita, N. Mex. ? Introduction

    By H. A. Thorne

    This paper describing the mining practices at the Chino mines at Santa Rita, Grant County, N. Mex., is one of a series being prepared by the Bureau of Mines on mining practices, methods, and costs in

    Jan 1, 1931

  • CIM
    Hydraulic Pilot-Plant Hoisting and the Investigation of the Pipeline Transport of Crushed Magnetite

    By P. Kostuik

    "Recent interest in the pipeline transport of solid mate-als has been sparked by the idea that, in an inflationary onomy, pipeline costs are more stable than the costs of any other transport systems.

    Jan 1, 1966

  • NIOSH
    RI 5386 Change In Calorific Value And Certain Other Properties Of High-Volatile Bituminous-Coal Samples During Storage ? Summary And Conclusions

    By Roy F. Abernethy

    All samples tested showed some loss of heating value for the 5-month period under all 4 storage conditions. The losses increased as the time of storage increased, with the pan-storage samples showing

    Jan 1, 1958

  • AUSIMM
    Investigations on the Sulphur Content of Pig Iron

    An investigation into the causes of variable sulphur content in blast furnace metal produced at No. 4 blast furnace at the Port Kembla works of Australian Iron and Steel Pty. Ltd. was carried out. The

    Jan 1, 1961

  • CIM
    Alberta Energy and Utilities Board (EUB) Field Surveillance Branch Building Relationships with Aboriginal Communities

    By Rob Barber

    This paper shares the experience of the Alberta Energy and Utilities Board (EUB) Field Surveillance Branch over the past few years in building relationships with Aboriginal communities. Our goal is to

    May 1, 2004

  • NIOSH
    Stoping Methods And Costs - Introduction

    By Chas. F. Jackson

    This bulletin is one of a series of Bureau of Mines reports dealing with mining methods, practices, and costs. A study of this subject was undertaken by the Bureau in cooperation with a large number o

    Jan 1, 1936

  • SAIMM
    Size Dependent Gold Deportment In The Products Of Copper Flotation And Methods To Increase Gold Recovery

    Plant survey data has shown that gold recovery through a specific copper concentrator was significantly lower than copper recovery. Size-by-size analysis revealed that this was due to poor recovery of

    Jan 1, 2003

  • AIME
    Coal - Characteristics of Coal Preparation Plant Slurries (Mining Engineering, Jan 1960, pg 49)

    By H. B. Charmbury, D. R. Mitchell

    Everyone in the coal industry from top management to the preparation engineer is vitally interterested in recovering as much salable coal as possible from the run-of-mine product. Coal losses from a p

    Jan 1, 1961

  • ISEE
    A Revolutionary, New Microballoon Ammonium Nitrate Prill that Increases Explosive Performance Through Controlled Porosit

    By Attie J. Goosen, William L. Spiteri

    Although the physical characteristics of ANFO made from porous prilled ammonium nitrate (PPAN) have been altered by the addition of crystal modifiers, the optimisation of prilling processes and the ad

    Jan 1, 1995

  • SME
    Design and Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift Method

    By Paul H. Madsen, Victor S. Romero

    The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geo

    Jan 1, 2001

  • NIOSH
    OFR-100(4)-77 Design And Development Of A Machine Familiarization Trainer For Dragline Operators - Appen A: Program Of Instruction-Modules 10-17 - Appen B: Instructional Time Breakdowns - Phase II Report ? Appen A (Continued) Program Of Instruction

    [Module 10. Internally Cued Operating Contingencies Prerequisite: Modules 1-7 - Estimated Instructional Time: 2.42 hrs. Module Abstract Trainees, using programmed instruction, describe the cues

    Jan 1, 1976

  • CIM
    The Effect of Particle Production History on Gold Leaching

    By Jessica Egan, Daniel Hodouin, Claude Bazin

    "The recovery of gold by leaching is influenced by the size of the gold carrier particles and the chemical environment. Using the relationships between the leaching rate, infinite recovery and particl

    Jan 1, 2009

  • IOM3
    Prediction of performance of 76-mm compound autogenous cyclone at different outlet diameters

    By R. Venugopal, T. C. Rao, N. Suresh

    Experiments were carried out using the cyclone to treat coal in the size range -2.0+0 mm. The diameters of the cyclone outlets (vortex finder and spigot) were varied to study their effects on cyclone

    Apr 1, 1995