Search Documents

  • SME
    Lake Ft. Smith Microtunneling Lake Tap

    By Roberto J. Guardia, Ted Lewtas, Peter Rasmussen, Klaus Winkler

    As part of the Lake Fort Smith Water Supply Dam Enlargement project, located in northwest Arkansas, microtunneling methods were used to install two side-by-side,1.53m (60-in) inside-diameter steel pip

    Jan 1, 2005

  • NIOSH
    Electrical And Mechanical Hazards And Falls Of Persons At Metal And Nonmetallic Mines - Metal- and Nonmetallic-Mine Accident-Prevention Course - Section 6 - Purpose And Scope

    The first metal-mine accident-prevention course was prepared and published 1942-45 as a series of seven miners' circulars (Nos. 51-57). The course has been broadened, revised, and brought up to d

    Jan 1, 1957

  • SAIMM
    Ore Pass Rehabilitation - Case Studies From Impala Platinum Limited

    By L. J. Gardner

    Ore pass systems play a critical role in moving broken rock from the workplace to surface, and the integrity of the ore pass excavations is crucial. Over the life of the mine, ore pass integrity deter

    Jan 1, 2006

  • NIOSH
    RI 5696 Evaluating One-Half Million Pounds Of Zirconium Sponge ? Introduction And Summary

    By M. D. Carver

    This publication describes development by the Bureau of Mines of a quality evaluation procedure for certifying the adequacy of production lots of Kroll process zirconium sponge the Bureau had produced

    Jan 1, 1960

  • AUSIMM
    Ensuring Rehabilitation into the Future – The Western Australian Mining Rehabilitation Fund

    By M L. Leybourne

    In 2012, in response to an increasing potential unfunded liability, the Western Australian Government passed the Mining Rehabilitation Fund Act 2012. The intent of this Act was to introduce an annual

    Jul 16, 2014

  • NIOSH
    RI 5161 Experiments On The Recovery Of Tin From Low-Grade Bolivian Tin Ores By Sulfide Volatilization ? Summary

    By M. J. Spendlove

    A progress report is presented on a research program in which an attempt was made to develop a practical sulfide-volatilization process for recovering tin from low-grade Bolivian ores. Shaft-furnace d

    Jan 1, 1955

  • SAIMM
    Project Report - Pillar Mining At No. 1 And 2 Sub-Shaft On Kloof Gold Mine

    Paper written on project work carried out in partial fulfilment of BSc Engineering (Mining) The aim of this project is to determine whether certain pillars occurring within the no. 1 shaft and no.

    Jan 1, 2005

  • AIME
    Geology - Tectonic History of the Basin and Range Province in Utah and Nevada (Mining Engineering, Mar 1960, pg 251)

    By J. C. Osmond

    One of the least known geologic regions in the U.S. is the area now called the Basin and Range Province. It is paradoxical that so little geologic information has been compiled for a province that has

    Jan 1, 1961

  • NIOSH
    RI 7036 Molten-Salt Electrorefining Vanadium Scrap

    By K. P. V. Lei

    The Bureau of Mines investigated molten-salt electrorefining as a practical method for reclaiming vanadium from vanadium scrap. An electrolytic process utilizing a KC1-LiC1-VC12 electrolyte at 615° C

    Jan 1, 1967

  • ISEE
    Full-Field Deformation Measurements Under Explosive Loading Conditions Using Multi-Image Pattern Analysis

    By Xing Zhao, Michael A. Sutton, Vikrant Tiwari, Damien Bretall, Xiaomin Deng, William L. Fourney, Uli Leiste

    The dynamic response of a thin aluminum plate subjected to both shallow and deeper buried blast loading was studied. Using a combination of high speed stereo-vision and three dimensional digital image

    Jan 1, 2010

  • NIOSH
    OFR-40(2)-82 Development Of Methods For Reclaiming Abandoned Tailings Ponds And Dams - Volume II - Appendixes

    By Robert D. Perry

    This report describes methods of reclaiming abandoned or inactive tailings ponds and dams. The investigated sites were selected tailings deposits adjacent to metal mines in the southwestern United Sta

    Jan 1, 1981

  • IIMP
    Solutionizing - Soluciones en sistemas de aire comprimido

    By Javier Támara

    Para aumentar la productividad de la empresa minera es necesario conocer el sistema de aire -en tanto se prioriza los intereses de los clientes, y así se puede suplir todos los componentes necesarios

    Aug 25, 2002

  • AUSIMM
    Plant Improvement and Cost Reduction at the Great Boulder Proprietary Gold Mines Limited

    By Harris J. W

    The treatment plant at The Great Boulder Proprietary Gold Mines Limited was designed and erected by Chas. Ruwolt Proprietary Limited in 1934 to mill 12,000 short tons per month. The flow sheet called

    Jan 1, 1955

  • SAIMM
    Investigation Of The Influence Of An Excavation On Adjacent Excavations, Using Neural Networks

    By S. Kwon

    When an underground excavation is created near to an instrumented measuring location, deformation at the location increases. The characteristics of this deformation increase, as well as the duration o

    Jan 1, 1998

  • CIM
    Geotechnical Considerations for Underground Mining of the Dy Deposit, Faro, Yukon

    By Nick D. Rose

    The Dy deposit is a 21 Mt Pb-Zn-Ag-Au SEDEX-type massive sulphide resource located in the Anvil District, Faro, Yukon. This relatively unexplored orebody lies at a depth of 480 to 920m below surface,

    May 1, 2002

  • AUSIMM
    Fundamental Study of Acid Drainage Control using Flyash

    Japan is the largest coal importer in the world, importing from Australia, China, Indonesia, Canada, Vietnam, etc. In Indonesia, most of the produced coal is extracted from open cut mines. More open c

    Dec 6, 2010

  • NIOSH
    OFR-20-77 Evaluation Of In-Mine Grounding System And Codification Of Ground Bed Construction And Measurement Techniques - In-Mine Grounding Systems - 1.1 Introduction

    The analysis of in-mine grounding systems began with an extensive literature search which is still in progress. About a dozen articles have been found which deal directly with grounding problems on lo

    Jan 1, 1975

  • AUSIMM
    Leaching Studies with Pentlandite and Pyrrhotite

    By Lavers G

    Factors governing the dissolution of nickel and iron in pentlandite and pyrrhotite concentrates from Mt. Windarra were studied for aqueous solutions at normal temperatures and pressures. The effects o

    Jan 1, 1976

  • NIOSH
    OFR-102-81 An Assessment Of Thin Seam Mining System Technology

    By J. Clark

    The objective of this study has been to determine the state of the art in underground, thin-seam-mining systems, to identify new technology and procedures that would reduce the hazards of thin-seam mi

    Jan 1, 1980

  • NIOSH
    OFR-36-90 Analysis Of Balboa Bay, Beluga, Point Mackenzie, And Lost River As Port Sites For Use By The Mineral Industry

    By Gary E. Sherman

    To aid the U.S. Army Corps of Engineers in their Resource Development Navigation Study, the U.S. Bureau of Mines (Bureau) examined the potential for mineral development near ten Alaska port sites. Thi

    Jan 1, 2011