Search Documents

  • AUSIMM
    Tubular Steel Headframe for Winze Sinking at North Broken Hill Ltd., Broken Hill

    Winzes are usually sunk 9 ft. 6 in. long by 6 ft. 0 in. wide and are divided into two compartments, 4 ft. 0 in. by 5 ft. 0 in. inside the timbers. The general practice is to sink the winze to a depth

    Jan 1, 1941

  • CIM
    Minimizing the economic unit cost of dragline-truck-shovel operations at Yatagan-Eskihisar open pit mine, Turkey

    By C. O. Aksoy

    There is a long history of coal production in Turkey with electric energy generated from power plants since the 1950s. However, the cost of power generation is high. Therefore, it has become necessary

    Jan 1, 2005

  • ISEE
    New Lightweight Dragline Buckets

    By Rowan A' Murry Karstel

    One way to ensure dragline productivity is by Increasing the size of the dragline bucket. In August 1994, Optimum Colliery in conjunction with Van Reenen Steel, Northwest Applied Technology, SSAB of S

    Jan 1, 1998

  • DFI
    Embankment Piles ? Introduction

    By B. B. Broms

    Embankment piles are common in the Scandinavian countries (Kjellman, 1940) and in Southeast Asia as support of fills, light structures, bridge abutments and deep excavations (Eide, 1968) as described

    Jan 1, 2010

  • CIM
    Flash Flotation Circuit Design Considerations

    "The first SkimAir flash flotation cell was installed in Outokumpu’s Hammaslahti Copper Concentrator in 1982 to prevent overgrinding of soft sulphides in the milling circuit. Since this first installa

    Jan 1, 2017

  • SAIMM
    The Fabric Of Coal-Mine Refuse As Backfilling Material And Its Relation To Grain-Size Distribution Parameters

    By M. G. Senyur

    This study aims at investigating the structural characteristics of backfilling material. In this regard, spatial arrangement of solid particles and associated voids in a unit mass of coal mine refuse

    Jan 1, 1998

  • NIOSH
    RI 8383 Relationship of Mineralogical and Chemical Composition of Refractory Periclases to Modulus of Rupture at 1,500° to 1,600° C

    By J. T. McLendon

    As part of its research project in developing improved refractory materials for metallurgical applications, the Federal Bureau of Mines obtained hot modulus of rupture data at 1,500°,1,550°, and 1,600

    Jan 1, 1979

  • AUSIMM
    Interpretation of Flotation Data for the Design of Process Plants

    By G S. Lane, G D. Richmond, J Dioses

    This paper discusses the methods used in the design of flotation plants, including benchscale batch and locked cycle tests and pilot plant trials. Two case studies are presented, one for the Cadia Hil

    Jan 1, 2002

  • NIOSH
    Subject Index to Bureau of Mines Publications from July 1, 1990 to January 1, 1960 - Subject Index D-L

    "D bed, Ky., coaL, washing characteristics RII 5140coking coal, reserves, estimate RI 5037Pa., coal, washing characteristics RI 4834, 4941D bed mine, Ky., coal, washig characteristics"

    Jan 1, 1960

  • NIOSH
    IC 8056 Yieldable Steel Arches And Yieldable Steel Ring Supports In Metal Mines ? Introduction And Summary

    By N. A. Eilertsen

    This paper presents the results of intermittent study begun in 1956 by the Federal Bureau of Mines of yieldable steel arches and yieldable steel ring sets installed for support of development openings

    Jan 1, 1962

  • SME-ICGCM
    Rock Mechanics And Ground Control For Underground Mining And Construction

    Recent improvements are described in several techniques for ground control in underground mining. Promising methods for analysis and mitigation of rockbursts are discussed. Methods of assessing damage

    Jan 1, 1989

  • NIOSH
    OFR-151-81 Evaluation And Demonstration Of A New Post Disaster EM Communication Technique For Mines

    By M. P. Ristenbatt

    A new automated post-disaster signaling system, intended to use through-the-earth EM propagation, was demonstrated in the laboratory at an input SNR of -34 dB. The system presently available requires

    Jan 1, 1981

  • DFI
    Slurry Walls In Building Construction - Urban Conditions

    By Louis Donolo

    New buildings in today's urban environment, especially in down-town areas, invariably involve the construction of multiple level basements. Used for parking, storage and commercial space, these u

    Jan 1, 1987

  • DFI
    Deviations From Design Impact Performance Of An Aggregate Pier Supported Embankment

    By Jay L. Hodkinson

    Replacement of an aging twin span river crossing in Vermont required a temporary bridge to accommodate traffic during construction. Soils beneath the temporary approach embankment consisted of very s

    Jan 1, 2011

  • NIOSH
    OFR-29(1)-82 Visual Attention Locations For Operating Continuous Miners, Shuttle Cars, And Scoops

    By Mark S. Sanders

    This report presents recommended visibility requirements for continuous miner, shuttle car and scoop operations and details the methodology used to generate them. A task analytic approach was used to

    Jan 1, 1981

  • AUSIMM
    Contaminated Water Management for the Golden Cross Mine

    By M J. Kindley

    The Golden Cross Gold Mine Project is now fully operational and into its second year of operation. Because of its location in the sensitive Coromandel Peninsula

    Jan 1, 1993

  • NIOSH
    IC 7930 Mining Methods And Costs At The Piokee Mining Unit And The Piokee Experimental Mining Project, The Eagle-Picher Co. (Tri-State Mines), Ottawa County, Okla. ? Introduction And Summary

    By J. B. Elizondo

    This paper, which describes mining methods and practices at the Piokee mining unit and the Piokee expertmental mining project of The Eagle-Picher Co. in northeast Oklahoma, is one of a series being pr

    Jan 1, 1959

  • AIME
    Relevant Factors for Development and Draw Control of Block Caving

    By Peter F. Weiss, H. Riedler, I. M. Moschitz, A. Olsacher, G. B. Fettweis

    CONTENTS : 1. NATURAL FACTORS Geology Petrography and Rock Mechanics Mining System Orientation Rock Bolting System Movability of the Ore Grain Size Distribution Permeability Contam

    Jan 1, 1981

  • NIOSH
    OFR-179(2)-84 Guidelines For Open-Pit Ore Pass Design - Vol. 2 - Design Manual

    By D. F. Hambley

    This manual contains a step-by-step procedure for the design of ore passes for open pit mines. The manual is comprehensive and deals with all aspects including location, design, construction and opera

    Jan 1, 1983

  • CIM
    Production Energy Optimization in Mining

    By Fabio Mielli

    In these times of increasing costs and diminished returns, energy consumption is one source of savings that remains relatively untapped in the mining sector. Typically, 15% to 40% of operational costs

    Aug 1, 2013