Search Documents

  • AUSIMM
    Murrin Murrin CCD1 Rake Mechanism Modification - The Decision and the Result

    By J Belke

    Murrin Murrin Operations have not had a successful beginning. Numerous reliability and operability issues, many of which are the result of design decisions, have been addressed through mechanical and

    Jan 1, 2004

  • AUSIMM
    Some Features of Lead Blast-Furnace Operations at the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie, S.A.

    The discussion which followed the publication of my paper by the formert has, I think, enhanced its value. It may therefore be of interest to members of our Australasian Institute, who are not members

    Jan 1, 1932

  • IIMP
    Evaluación geotécnica en la apertura de nuevos accesos para la optimización en el ciclo de carguío de mineral

    By Alcides Eloy Cano

    Los recursos minerales de un depósito está en función de las dimensiones de la geometría del cuerpo mineral, así como sus reservas minables permiten saber el verdadero valor económico de su contenido.

    Sep 12, 2011

  • CIM
    Corrosion Behaviour of Swellex Bolts in Underground Mining Environments

    By F. Charette

    The paper reviews recent investigations of the impact of corrosion on the performance of both plain and coated Swellex rock bolts. It addresses the problems associated with estimating and predicting c

    May 1, 2004

  • DFI
    Installation Of Marine Pile Foundations At The Skyway Project For The San Francisco Oakland Bay Bridge

    By Robb L. Swenson

    Construction of foundations for the Skyway Segment of the San Francisco Oakland Bay Bridge required innovative techniques due to the mass of the structures being inserted and the unique subsurface of

    Jan 1, 2005

  • DFI
    Non-Destructive Testing, Evaluation And Optimization Of Existing Deep Foundations For Re-Use Along The East Coast

    By Matthew E. Meyer

    Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems

    Jan 1, 2011

  • SME
    Risk Considerations and Design for the Downtown Deep Sewer Tunnels, Austin, Texas

    By Greg Wieland

    Deep sewer tunnels are required to meet future growth demands of the City of Austin?s down-town redevelopment. The tunnel is 18,000 ft long and varies in finished diameter from 54 inches to 96 inches.

    Jan 1, 2008

  • AUSIMM
    Opportunities and Constraints for Regional Resource Synergies in Minerals Processing Regions

    By S Harris, A Bossilkov

    The Kwinana (Western Australia) and Gladstone (Queensland) industrial areas are among the few dozens of heavy industrial areas globally that demonstrate significant levels of regional resource synergi

    Jan 1, 2006

  • TMS
    Development Of New Copper Continuous Converter

    By Yasuo Ojima

    A new copper continuous converting process was investigated to evaluate the possibility of its application in the commercial operation. The tests were performed both in the laboratory and in pilot pla

    Jan 1, 2003

  • TMS
    The Engineering Design Sequence And Materials Development: 990 Gold-Titanium As A Case Study

    By Mark E. Schlesinger

    Engineering design follows a six–step sequence. Demonstration of this sequence in materials engineering is less common. A case study is presented, using the 1989 paper by Gafner on the development of

    Jan 1, 2014

  • DFI
    Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction

    By Robert Bachus, Jamey B. Rosen

    "Abstract Large scale In Situ Barrier Wall Construction projects, specifically those related to earth dams, dikes, and levees, frequently require stringent quality control measures to ensure the succe

    Jan 1, 2014

  • NIOSH
    Reduction Of Air Pollutants From Gas Burner Flames - Including Related Reaction Kinetics

    By Margaret E. Harris

    The formation of nitrogen oxides, the decay of carbon monoxide, and the concentrations of residual hydrocarbons in the secondary combustion zones of propane-air and methane-air flames were studied in

    Jan 1, 1970

  • DFI
    Practical Experience With Nondestructive Testing Of Augered Cast-In-Place Piles

    By Bernard H. Hertlein

    All methods of deep foundation construction present challenges to the contractor and engineer that vary according to the method employed, and the geotechnical conditions in which it is being used. Aug

    Jan 1, 1997

  • NIOSH
    RI 9667 - Effectiveness Of Selected Diesel Particulate Matter Control Technologies For Underground Mining Applications: Isolated Zone Study, 2003

    By James D. Noll, Jon A. Hummer, Shawn E. Vanderslice, Aleksandar D. Bugarski, George H. Jr. Schnakenberg, Steven E. Mischler, Larry D. Patts

    The National Institute for Occupational Safety and Health designed and conducted a study in an underground metal mine to assess the effects of selected diesel emissions control technologies on the con

    Jan 5, 2006

  • TMS
    Use of Eco Friendly Alternate Refining Flux in Aluminium Cast House - A Step Towards Sustainable Development

    By P. K. Narasimharaghavan

    The major threat to the sustainability of Aluminium Industry is its significant contribution to global warming by way of generation of non eco-friendly gases during its production cycle from Bauxite t

    Jan 1, 2010

  • AUSIMM
    The Mineralogical Researches of Gold Ores and Technological Products at Operating Factory in Olympiada Mine (Russia)

    The Mineralogical Researches of Gold Ores and Technological Products at Operating Factory in Olympiada Mine (Russia)

    Sep 13, 2010

  • CIM
    In-track assessment of premium and intermediate grade rail steels

    By K. J. Griffin, G. W. Rosval

    "In our increasingly competitive market, attempts to improve productivity by increasing axle loads have placed more severe demands on rails. CP Rail thus requires stronger, tougher, and more wear-resi

    Jan 1, 1988

  • SME
    Planning and Fast Track Tunnel Design in Historical Downtown Charleston

    By James McKelvey, Larry Drolet, Jason Swartz

    INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved

    Jan 1, 2005

  • IOM3
    Environmental assessment: a new experience

    By I. J. Brown

    Paper prepared for presentation at Industrial minerals and the environment, held in Leeds, 24-35 September 1990. The need to submit an environmental statement (EIS) has certainly increased the workloa

    Jan 1, 1991

  • AUSIMM
    The distribution, petrology, and mineralisation of Mid Cretaceous to Palaeogene Marine Volcanics in Papua New Guinea: An initial survey

    By Rogerson R, Queen L

    The petrology and age of mid Cretaceous to Palaeogene marine volcanics may provide important clues to the palaeogeography of the period, particularly for tectonic elements and events outboard of t

    Jan 1, 1991