Search Documents

  • AIME
    Papers - Effect of Composition upon Physical and Chemical Properties of 10-karat Gold Alloys (T. P. 1122)

    By Tracy C. Jarrett

    In making gold alloys possessing certain physical properties, such i~nportant factors as corrosion resistance, color, hardness and melting points must be considered. All of these requirements depend d

    Jan 1, 1940

  • AIME
    Papers - Effect of Composition upon Physical and Chemical Properties of 10-karat Gold Alloys (T. P. 1122)

    By Tracy C. Jarrett

    In making gold alloys possessing certain physical properties, such i~nportant factors as corrosion resistance, color, hardness and melting points must be considered. All of these requirements depend d

    Jan 1, 1940

  • NIOSH
    OFR-91-76 Design, Fabrication, And Testing Of A System To Demonstrate The Effectiveness Of Respirable Dust Control On Longwall Shearers By The Use Of Water Piped Through The Shearer Drum ? I. Introduction

    This report is in fulfillment of Contract H0230031 awarded to Bituminous Coal Research, Inc., on May 23, 1973. The scope of work to be performed under this contract was divided into four phases: Phase

    Jan 1, 1976

  • SME
    Mechanical Mining: Challenges and Directions

    By Richard E. Gertsch

    Mechanical mining holds great promise for the mining industry. Realizing this promise depends on developing the tools needed to mechanize a mining operation with a reasonable expectation of success.

    Jan 1, 1994

  • CIM
    General Geology of the Chibougamau Region

    By G. O. Allard, A. Gobeil

    The Chibougamau area is the eastern segment of the MatagamiChibougamau greenstone belt. The Archean rocks of the area consist of two mafic-to-felsic volcanic cycles ( Roy Group) overlain by a sediment

    Jan 1, 1984

  • IIMP
    Breakage and fragmentation modelling for underground production blasting applications

    By Italo Oñederra

    A review of breakage and fragmentation literature has shown that only a few models have been specifically developed for applications in underground production blasting. These approaches, however, have

    Sep 12, 2005

  • AUSIMM
    Mettalurgical evaluation of iron ore drum separators using density tracers

    By Lyman G. J

    Dense medium drum separator efficiency was analysed at two Western Australian iron ore concentrators. Efficiency data had hitherto been difficult to accumulate due to the high cost of analysing repres

    Jan 1, 1987

  • NIOSH
    Bulletin 206 Petroleum Laws of All America

    By J. W. Thompson

    Be if enacted by the Senate and House of Representatives of the United States of America in Congress assembled, That deposits of coal, phosphate, sodium, oil, oil shale, or gas, and lands containing s

    Jan 1, 1921

  • ISEE
    Using Photogrammetry Data from Unmanned Aerial Vehicle (UAV), Small Unmanned Aircraft Systems (sUAS) for Blast Design

    By Luis Valentim, John E. Wiegand

    Highwall or face profiling has long been used to facilitate the design and placement of front row blastholes to ensure optimum burdens. Traditionally, a large number of laser measurement points obtain

    Jan 1, 2016

  • TMS
    Improving Inco's Mk Reactor Performance Through Application Of Praxair?s Coherent Jet (Cojet) Technology

    A novel, low-pressure adaptation of Praxair?s coherent jet technology utilizing CoJet lances was developed for application at Inco's Copper Cliff Smelter where oxygen is available in large tonnag

    Jan 1, 2005

  • CIM
    Matching laboratory and plant performance - a case study of the Elura lead circuit, Pasminco Australia Limited

    By M. C. Pietrobon

    "A common problem in assessing the applicability of laboratory flotation data is determining how closely conditions during laboratory testing of the ore matches those that occur in a plant. Typical la

    Jan 1, 2002

  • ISEE
    Running a Drill Program that Supports the Mission of Blasting

    By William D. Hissem

    While much technology has been developed and brought to bear in the area of blasting applications, the foundation work required for success in the muck pile begins with the drilling program.

    Jan 1, 1997

  • SME
    Doing It All: Cut, Crush, And Load With One Machine Wirtgen Surface Miner

    By D. van der Veen

    Mining companies and contractors are looking at Wirtgen Surface Miners to provide flexibility at their operations. Wirtgen Surface Miners have been used in the surface mining industry for over fifteen

    Jan 1, 2002

  • SME
    Engineering Geology Of The Mica Underground Powerplant

    By Douglas D. Campbell, Alan S. Imrie

    INTRODUCTION Mica Dam is located on the Columbia River just downstream of the "big bend" of the Columbia, where it leaves the Rocky Mountain Trench and begins to flow southwards, approximately 85 m

    Jan 1, 1976

  • SAIMM
    New Trends In Submerged Arc Furnace Technology

    By J. Kunze, R. Degal

    During the last 100 years, the submerged arc furnace has been one of the most amazing diversified melting units. These furnaces have found their application in more than 20 different main industrial a

    Jan 1, 2004

  • ISEE
    An Integrated Explosive Management, Blast Design and Loading System

    By Ola Lindahl, Mark Irving, John Hutchings

    "Blasting is a process starting with a geometric description of the block of rock and ending with a pileof fragmented material. A key step in improving the productivity and quality control over the pr

    Jan 1, 1997

  • IOM3
    Method for incorporation of shape characterization into cone crusher model

    By A. C. Apling, N. B. Barrett

    Roadstone production requires the generation of non-flaky material, as outlined in British Standard 812 section 105.1; with respect to this criterion, a mathematical model of a cone crusher must be ab

    Apr 1, 1995

  • DFI
    Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)

    By David B. Paul

    "ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class

    Jan 1, 2014

  • SAIMM
    Evaluation Of A Limit Equilibrium Model To Simulate Crush Pillar Behaviour - Synopsis

    By M. du Plessis

    This paper describes the evaluation of a limit equilibrium model to simulate the behaviour of crush pillars in platinum mines. An analytical model was derived to calculate the residual average pillar

    Jan 1, 2011

  • TMS
    Ausrnelt Technology, Flexible, Low Cost Technology For Copper Production In The 21st Century (Invited)

    By Joseph Sofra

    It has become increasingly evident that sustainable metals production in the 21" century requires producers to balance the needs of cost effective, high value production with that of responsible plant

    Jan 1, 2003