    Early Warning of Longwall Weighting Events and Roof Cavities Using Lva Software

    By David I. Hoyer

    It is shown that by monitoring longwall leg pressures in real time, warning can be given for significant weighting events and the formation of roof instabilities, such as roof cavities, several hours

    Jan 1, 2011

  • SME-ICGCM
    Research And Application Of Combined Reinforcement System

    By Binchuan Zhang

    The combined reinforcement system (CRS) combines the strengths of roof' bolting, resin-anchored cable bolt, and chemical grouting to effectively control the deformation of the strata surrounding

    Jan 1, 2001

  • SME-ICGCM
    Economic Evaluation Of Subsidence Damage Mitigation Techniques

    By David C. Johnson

    Coal mining in Illinois has resulted in many structures being exposed to subsidence damage. Damage mitigation techniques (DMT) applied in the foundation design/construction have proven successful in m

    Jan 1, 1993

  • SME-ICGCM
    Time Dependent Strength Of Coal Strata For Long-Term Pillar Stability

    By Z. T. Bieniawski

    A major study was performed on determination of long term strength of coal strata directed to the design of coal pillars to ensure their stability beyond the life-time of a mine. Based on field invest

    Jan 1, 1994

  • SME-ICGCM
    Numerical Modeling of the Pillar Confinement with Backfilling Material in Room?and?Pillar Coal Mining

    By Andre Zingano

    It is known that the backfilling confinement increases the pillar strength and also reduces the rib lateral displacement. With backfilling, it is possible to increase the room-and-pillar mining recove

    Jan 1, 2011

  • SME-ICGCM
    Effect Of Face Advance Rates On The Characteristics Of Subsidence Processes Associated With U.S. And German Longwall Mining Operations

    By Yi Luo

    Regulating the face advance rate in longwall mining operation can be an effective means to reduce the disturbance potential to surface structures associated with a longwall subsidence process. However

    Jan 1, 2001

  • SME-ICGCM
    Recent Innovations for Slope Development

    By Tim Burgess

    Patton Mining, LLC and J.H. Fletcher Company recently collaborated and mechanized the sometimes hazardous, and always labor intensive, process of installing standing steel supports during the construc

    Jan 1, 2011

  • SME-ICGCM
    Subsidence and environmental impacts in Japanese coal mining

    By Tetsuro Esaki

    This paper describes the present condition of mining-induced damages in Japan and the characteristics of them. The change of mining operation and environmental condition has caused various significan

    Jan 1, 1989

  • SME-ICGCM
    Practical Aspects Of Longwall Pillar Design

    By Christopher Mark

    The past decade has provided a wealth of practical experience with longwall pillar design. Design formulas developed specifically for longwalls have proven their value in numerous applications. Analyt

    Jan 1, 1990

  • SME-ICGCM
    Design Considerations For Bump-Prone Longwall Mines

    Tailgate pillar and tailgate-face corner humps have been a major threat to longwall coal mines where hump-prone conditions exist. The yield pillar design concept, in which the longwall chain pillars a

    Jan 1, 1999

  • SME-ICGCM
    Flexible Support Design For Gateroads Of Retreating Longwall Panels

    By Erdal Unal

    In gate roads where supports are subjected to dynamic loading four times due to retreating longwall panels, it is a real challenge to replace the rigid arches with flexible reinforcement systems and y

    Jan 1, 1993

  • SME-ICGCM
    A Rock Mass Strength Concept For Coal Seams

    By George S. Kalamaras

    Coal strata strength is included as a vague term in most of the pillar design formulas, either as a questionable fraction of the intact coal strength or a size-dependent relationship for scaling down

    Jan 1, 1993

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    Characterization Of Structural Integrity And Stress State Via Seismic Methods: A Case Study

    By Erik C. Westman

    The objective of this Bureau of Mines study is to determine the structural integrity and stress state of coal structure using seismic techniques. Bureau personnel conducted seismic transmission and re

    Jan 1, 1993

  • SME-ICGCM
    Cable Supports For Improved Longwall Gateroad Stability

    By Stephen C. Tadolini

    Cable supports offer several advantages over traditional secondary support methods. Cable supports enhance stress redistribution to pillars and gob areas, minimize or eliminate timbers and cribs which

    Jan 1, 1993

  • SME-ICGCM
    Flexibolt Flexible Roof Bolts: A New Concept For Strata Control

    A high strength steel strand bolt has been developed by Barrett, Fuller & Partners as a replacement for conventional rigid bars for primary roof support in coal mines. It is based on a 23mm diameter m

    Jan 1, 1993

  • SME-ICGCM
    The Use of NDT Methods to Determine the Condition of Rockbolt Support During the Recovery of a Previously Flooded Coal Mine Roadway at Thoresby Colliery

    By Brian Clifford

    Thoresby Colliery is in the process of recovering an old roadway that was flooded following the closure of an adjacent mine. The aim is to re-use the roadway as a gate road for a longwall retreat pane

    Jan 1, 2002

  • SME-ICGCM
    Evaluation Of Surface Subsidence Potential Along A Pipeline Due To Abandoned Coal Mine Works

    By Thomas L. Vandergrift

    With the inevitable expansion of homes, businesses, and infrastructure in coal mining regions, the potential for future subsidence above abandoned mines is of increasing concern. Of particular concern

    Jan 1, 2000

  • SME-ICGCM
    Entry Stability Monitoring & Analysis For Longwall & Continuous Mining Systems

    By Wm. Mark Hart

    Under a specific geological condition, roof supporting method, and pillar-entry system, an entry convergence concept may be the most effective means that can be used to effectively indicate the longwa

    Jan 1, 1995

  • SME-ICGCM
    Crosshole Seismics: Applications In Mining

    By Richard E. Thill

    Two Cross-borehole systems were developed by the Bureau of Mines, one operating at a central frequency of 20 kHz for close-in spacing between boreholes (2-20m) and another operating at a dominant freq

    Jan 1, 1989