Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Parameters Affecting Resin-Anchored Cable Bolt Performance: Results Of In Situ Evaluations

    By Joseph C. Zelanko

    Cable bolt support techniques. including hardware and anchorage systems, continue to evolve to meet U.S. mining requirements. For cable support systems to be successfully implemented into new ground c

    Jan 1, 1995

  • SME-ICGCM
    Interaction Between Roof And Support On Longwall Faces With Particular Reference To Support Resistance

    The objective of extensive underground experimentation on three longwall coal faces was to improve the stability of mechanised longwall faces through investigation of the relations between support res

    Jan 1, 1984

  • SME-ICGCM
    Subsidence Over Room and Pillar Retreat Mining in a Low Coal Seam

    By Andre Zingano, Anderson Weiss

    "The objective of this paper is to study the behavior of a low thick and low depth coal seam and the overburden rock mass. The mining method is room and pillar in retreat and partial pillar recovery.

    Jan 1, 2018

  • SME-ICGCM
    Case Study of the Effect of Stratigraphic Location on Roof Stability in Rock Salt

    By Chris T. Franke

    The Waste Isolation Pilot Plant is a deep underground facility mined in bedded salt interspersed with persistent clay inter- beds. The clay seams delineate beams of salt above and below the excavation

    Jan 1, 1997

  • SME-ICGCM
    The Impact Factors of Overburden Movement in Longwall Mining of Shallow Coal Seams

    By Yang Li

    For the study of overburden movement in longwall mining of shallow coal seams, most scholars merely consider the thickness of bedrock and top soils. In this paper, the overburden movement in longwall

    Jan 1, 2014

  • SME-ICGCM
    Design Considerations for Tensioned Bolts

    By Yunqing Zhang

    The 3-D numerical modeling using ABAQUS is performed to analyze the mechanisms of the tensioned bolts by taking into considerations excavation sequence, pre-tension, bedding planes and in-situ horizon

    Jan 1, 2002

  • SME-ICGCM
    Australian Longwall Geomechanics - A Recent Study (52cb3b8b-6f2d-4969-ba9d-61fc0c2f72ec)

    By Russell C. Frith

    This paper presents recent findings concerning longwall caving mechanisms relating to Australian mining conditions and their effect upon longwall support requirements and behaviour. The findings arc b

    Jan 1, 1992

  • SME-ICGCM
    Ground Control Aspects of a Successful Underground Coal Mine Trial in Weak Strata in Indonesia

    By Andrew Lewis, Amarit Nitaramorn, Alexander Garcia, Peter Altounyan

    "Indonesia is a major coal producer, the vast majority being sourced from opencast operations. Underground production to date has been constrained by unfavorable ground conditions and limited local ex

    Jan 1, 2010

  • SME-ICGCM
    The Impact Of Three Longwall Coal Mines On Streamflow In The Appalachian Coalfield

    By Denise Y. Dizon

    The objectives of this study were to document the hydrologic impacts of longwall mining on streams, identify the factors affecting the extent of stream dewatering, and develop empirical trends to pred

    Jan 1, 1990

  • SME-ICGCM
    Assessment of Roadway and Yielding-pillar Performance During Retreat Longwall Extraction at a United Kingdom Deep Mine

    By Leigh Sharpe

    Dunng the last 5 years a United Kingdom colliery has utilised a yielding-pillar configuration to extract a relatively thick coal seam at a depth of 640 m. As part of ongoing research into the siting o

    Jan 1, 1998

  • SME-ICGCM
    Monitoring Consolidation Settlement Deformation in Deep Borehole of Unconsolidated Strata USing Fiber Bragg Grating Sensing

    By Liang Dong, Jinxuan Liu, Biao Qiu, Jing Chai

    "The Cenozoic unconsolidated strata in the east area of China are composed of clay, sandy clay, fine sand, hardpan, etc. Numerous shafts of the coal mines in these areas have been damaged in various d

    Jan 1, 2010

  • SME-ICGCM
    Microseismic Monitoring of Mountain Bumps and Bounces: A Case Study

    By J. L. Condon

    The Bureau of Mines, through in-house and contract research, monitored mountain bump-prone areas of the Olga #2 Mine, near Welch, WV, using microseismic techniques for 15 months during 1985 and 1986.

    Jan 1, 1987

  • SME-ICGCM
    Single Point And Full Scale Laboratory Testing Of Timber Chock Construction

    By Jim Galvin

    4 and 6 point timber chock constructions are used extensively on both a systematic and spot basis by Australian longwall operators to support tailgate roadways. In 1996, the School of Mining Engineeri

    Jan 1, 2000

  • SME-ICGCM
    Load Transfer Distance Measurements at Two Mines in the Western U.S.

    By Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson

    "Load transfer distance (LTD) is simple in concept and usually evident in underground coal mines. Many people in the mining industry recognize LTD as the distance from the panel to where the mine ribs

    Jan 1, 2015

  • SME-ICGCM
    The Effect of Discontinuities Characteristics on Coal Mine Stability and Sustainability: A Rock Fall Prediction Approach

    By Nikzad Oraee, Parham Khajehpour, Kazam Oraee, Arash Goodarzi

    "Rock fall related accidents continue to occur in coal mines, although artificial support mechanisms have been used extensively [1]. Roof stability is primarily determined in many underground mines by

    Jan 1, 2015

  • SME-ICGCM
    Development of An Enhanced Methodology for Ground Movement Predictions Due to Longwall Mining in the Illinois Basin

    By Zach G. Agioutantis

    The Illinois Basin has an extensive history with the use of mechanized longwall mining dating back to the early 1970?s. In recent times, technological advances have resulted in increased panel widths

    Jan 1, 2014

  • SME-ICGCM
    Analysis of Gateroad Stability at Two Longwall Mines Based on Field Monitoring Results and Numerical Model Analysis

    By David F. Gearhart, Mark Van Dyke, Heather Dougherty, Ted Klemetti, Gabriel S. Esterhuizen

    "Coal mine longwall gateroads are subject to changing loading conditions induced by the advancing longwall face. The ground response and support requirements are closely related to the magnitude and o

    Jan 1, 2018

  • SME-ICGCM
    Chemical Consolidation For Roadway Surrounding Rock - It's Theory And Applications

    By Jinhua Wang

    Based on engineering examples and theoretical analysis, the mechanism of chemical consolidation for fractured roadway surrounding rock was discussed. The chemical consolidating materials and three con

    Jan 1, 1996

  • SME-ICGCM
    Design And Experience Of Total Extraction Room And Pillar Operations Above Depleted Longwall Panels

    By Kenneth Rigsby

    Black Mountain Resources' Highlands Mine No. I is a full extraction room and pillar operation located in Harlan County, Kentucky. Black Mountain extracts the 0.9 to 1.1 meter (36- to 42-inch) thi

    Jan 1, 2003

  • SME-ICGCM
    Radon Detection of Mining–Induced Fractures in Overlying Strata of Shallow Coal Seams in China

    By Dongsheng Zhang, Xufeng Wang, Wei Zhang, Gangwei Fan

    "Large-scale longwall mining of shallow coal seams could cause mining-induced fractures to communicate with the surface immediately in Northwest China, leading to a series of mine safety and environme

    Jan 1, 2015