Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Gateroads Layout and Entry Support in a Western Longwall Coal Mine in ChinaBy WenFeng Li
Comparing to the coal seams in Eastern China, the coal seams in Western China usually have better geological conditions. Therefore, changes in the conventional gateroads layout are required for the We
Jan 1, 2013
-
The Caterpillar HW300 QuickscanBy Pieter-Jan Kleiterp
Caterpillar has been involved in highwall mining since the purchase of Bucyrus in 2011. The Cat® HW300 is a continuation of the Superior Highwall Miner that was first sold in the USA in 1994. Currentl
Jan 1, 2014
-
Study on the Height of Fractured Zone inside Overlying Strata under High-Intensity Mining in ChinaBy Lou Gaozhong, Guo Wenbing, Zhao Gaobo, Wang Shuren
"The height of a fractured zone due to high-intensity mining (HIM) plays a vital role in the safety analysis of coal mining under bodies of water. This paper described the characteristics of HIM. The
Jan 1, 2018
-
Coal Bursts That Occur During Development: A Rock Mechanics EnigmaBy Christopher Mark
Coal bursts are typically associated with highly stressed coal. Most bursts occur during retreat mining (longwall mining or pillar recovery) in highly stressed locations like the tailgate corner of th
Jan 1, 2017
-
Measurements of Horizontal Shear Movements Ahead of Longwall Mining and Implications for Overburden BehaviourBy Jesse Puller, Ken W. Mills, Owen Salisbury
"An underground coal mine located in New South Wales has a target coal seam located 160-180 m deep directly below a 16-20 m thick conglomerate unit that has been associated with significant periodic w
Jan 1, 2015
-
Effect of Geological and Mining Factors on Roof Stability of a Room and Pillar Mine in USBy Taghi Sherizadeh, Pinnaduwa H. S. W. Kulatilake
"This paper examines the effect of different geological and mining factors on roof stability in underground coal mines by combining the field observations, laboratory testing, and numerical modeling.
Jan 1, 2015
-
Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple SeamsBy Peter Zhang
"Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa
Jan 1, 2017
-
Development of An Online User’s and Training Manual for LaModelBy Keith A. Heasley, Christopher R. Newman
"Originally developed in 1993, LaModel has aided mining engineers and researchers alike in improving the design and safety of underground single- and multiple-seam mining operations (Heasley, 1998). T
Jan 1, 2015
-
Use of a Laser Grid System for Accurate Roof Bolt LocationBy William Kendall
"A tremendous amount of research, analysis, and engineering time is used to design a proper roof support system including the type, length, and location of the roof bolts. Unfortunately, since the roo
Jan 1, 2016
-
Sandy Creek Waterfall?Case Study of Successful Management of the Potential Impacts of Longwall Mining on a Sensitive Natural Surface FeatureBy Bruce K. Hebblewhite
BHP Billiton Illawarra Coal operates Dendrobium Mine in an area 10-20km west-northwest of Wollongong in the Southern Coalfield of New South Wales, Australia. The mine recently completed longwall mini
Jan 1, 2014
-
Analyses of De-Confinement Mechanisms of Unstable Failures in Underground Mining ConditionsBy Ruixiang Gu
The de-confinement mechanisms of unstable failures as they occur in deep coal mining conditions are investigated using a distinct element numerical modeling code. The Mohr-Coulomb and continuously yie
Jan 1, 2014
-
Illinois Basin Coal Geology and Roof ControlBy Marvin B. Thompson
"The depositional model for major Illinois Basin coalbeds is well documented and defined on a regional scale. The model was a driving force during past exploration for lower sulfur and thicker coal de
Jan 1, 2010
-
Assessment of Rockburst Hazard by Quantifying the Consequence with Plastic Strain Work and Released Energy in Numerical ModelsBy R. Kaund
"Quantifying the rockburst consequence is of critical importance to reduce the hazards with preventative measures in underground mines and deep tunnels. Contours of energy components within a pillar m
Jan 1, 2018
-
Rib Access Boom for a Roof BolterBy Joe McQuerrey, William Kendall, Gene Wilson
"Roof bolting is the standard for ground control in underground coal mining. Rib and truss bolting is just as important when conditions are less than desirable. As a manufacturer of roof drills, J.H.
Jan 1, 2010
-
The Evolution of Pre-Driven Recovery Roadways at Crinum MineBy Adam Mackenzie, Dan Payne, Yass-Marie Rutty
"Historically, the Crinum mine has experienced significant falls of ground when longwall production slowed to prepare for recovery in weak roof areas. These conditions continue through the recovery pr
Jan 1, 2016
-
Influence of a Coal Mine Subsidence on An Adjacent DamBy Nengxiong Xu
The WTZ coal mine is located adjacent to an auxiliary dam in P. R. China. The mining-induced ground movements are calculated using a 3-D numerical procedure based on the finite difference method (FDM)
Jan 1, 2013
-
Ground Control Design Considerations for Reducing Longwall?Induced Stress and Seismicity Associated with Massive Sandstone under Deep CoverBy Daniel W. H. Su
Thick, massive sandstone present in close proximity of the mining horizon can create difficult longwall caving issues, which may lead to severe face loading and subsequent face roof control problems.
Jan 1, 2014
-
The Influence of the Protection Pillar Width on the Stability of the GateroadBy Wojciech Masny, Andrzej Walentek
"The most common extraction method in Polish coal mines utilize pillars between adjacent longwall panels. This is mainly due to the significant depth and difficulties in maintaining stability of the g
Jan 1, 2010
-
Risk Assessment Of Geotechnical Factors Associated With Underground Thick Seam Mining MethodsBy Bruce K. Hebblewhit
Australia is well endowed with extensive reserves of thick underground coal scams, particularly in the range of 4.5m to 9m thicknesses. (For the purposes of this paper, thick scams are defined as bein
Jan 1, 2001
-
The Development and Planning of Multiple Level Underground Limestone MinesBy Bruce W. King, David A. Newman
"Underground mines have always been an integral part of the limestone industry. However, beginning in the 1990s, the number of underground limestone mines has increased for many reasons including• Str
Jan 1, 2016