Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Caterpillar HW300 Quickscan

    By Pieter-Jan Kleiterp

    Caterpillar has been involved in highwall mining since the purchase of Bucyrus in 2011. The Cat® HW300 is a continuation of the Superior Highwall Miner that was first sold in the USA in 1994. Currentl

    Jan 1, 2014

  • SME-ICGCM
    Gateroads Layout and Entry Support in a Western Longwall Coal Mine in China

    By WenFeng Li

    Comparing to the coal seams in Eastern China, the coal seams in Western China usually have better geological conditions. Therefore, changes in the conventional gateroads layout are required for the We

    Jan 1, 2013

  • SME-ICGCM
    Study on the Height of Fractured Zone inside Overlying Strata under High-Intensity Mining in China

    By Lou Gaozhong, Guo Wenbing, Zhao Gaobo, Wang Shuren

    "The height of a fractured zone due to high-intensity mining (HIM) plays a vital role in the safety analysis of coal mining under bodies of water. This paper described the characteristics of HIM. The

    Jan 1, 2018

  • SME-ICGCM
    Measurements of Horizontal Shear Movements Ahead of Longwall Mining and Implications for Overburden Behaviour

    By Jesse Puller, Ken W. Mills, Owen Salisbury

    "An underground coal mine located in New South Wales has a target coal seam located 160-180 m deep directly below a 16-20 m thick conglomerate unit that has been associated with significant periodic w

    Jan 1, 2015

  • SME-ICGCM
    Coal Bursts That Occur During Development: A Rock Mechanics Enigma

    By Christopher Mark

    Coal bursts are typically associated with highly stressed coal. Most bursts occur during retreat mining (longwall mining or pillar recovery) in highly stressed locations like the tailgate corner of th

    Jan 1, 2017

  • SME-ICGCM
    Effect of Geological and Mining Factors on Roof Stability of a Room and Pillar Mine in US

    By Taghi Sherizadeh, Pinnaduwa H. S. W. Kulatilake

    "This paper examines the effect of different geological and mining factors on roof stability in underground coal mines by combining the field observations, laboratory testing, and numerical modeling.

    Jan 1, 2015

  • SME-ICGCM
    Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams

    By Peter Zhang

    "Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa

    Jan 1, 2017

  • SME-ICGCM
    Development of An Online User’s and Training Manual for LaModel

    By Keith A. Heasley, Christopher R. Newman

    "Originally developed in 1993, LaModel has aided mining engineers and researchers alike in improving the design and safety of underground single- and multiple-seam mining operations (Heasley, 1998). T

    Jan 1, 2015

  • SME-ICGCM
    Use of a Laser Grid System for Accurate Roof Bolt Location

    By William Kendall

    "A tremendous amount of research, analysis, and engineering time is used to design a proper roof support system including the type, length, and location of the roof bolts. Unfortunately, since the roo

    Jan 1, 2016

  • SME-ICGCM
    Sandy Creek Waterfall?Case Study of Successful Management of the Potential Impacts of Longwall Mining on a Sensitive Natural Surface Feature

    By Bruce K. Hebblewhite

    BHP Billiton Illawarra Coal operates Dendrobium Mine in an area 10-20km west-northwest of Wollongong in the Southern Coalfield of New South Wales, Australia. The mine recently completed longwall mini

    Jan 1, 2014

  • SME-ICGCM
    Analyses of De-Confinement Mechanisms of Unstable Failures in Underground Mining Conditions

    By Ruixiang Gu

    The de-confinement mechanisms of unstable failures as they occur in deep coal mining conditions are investigated using a distinct element numerical modeling code. The Mohr-Coulomb and continuously yie

    Jan 1, 2014

  • SME-ICGCM
    Illinois Basin Coal Geology and Roof Control

    By Marvin B. Thompson

    "The depositional model for major Illinois Basin coalbeds is well documented and defined on a regional scale. The model was a driving force during past exploration for lower sulfur and thicker coal de

    Jan 1, 2010

  • SME-ICGCM
    Assessment of Rockburst Hazard by Quantifying the Consequence with Plastic Strain Work and Released Energy in Numerical Models

    By R. Kaund

    "Quantifying the rockburst consequence is of critical importance to reduce the hazards with preventative measures in underground mines and deep tunnels. Contours of energy components within a pillar m

    Jan 1, 2018

  • SME-ICGCM
    Rib Access Boom for a Roof Bolter

    By Joe McQuerrey, William Kendall, Gene Wilson

    "Roof bolting is the standard for ground control in underground coal mining. Rib and truss bolting is just as important when conditions are less than desirable. As a manufacturer of roof drills, J.H.

    Jan 1, 2010

  • SME-ICGCM
    The Evolution of Pre-Driven Recovery Roadways at Crinum Mine

    By Adam Mackenzie, Dan Payne, Yass-Marie Rutty

    "Historically, the Crinum mine has experienced significant falls of ground when longwall production slowed to prepare for recovery in weak roof areas. These conditions continue through the recovery pr

    Jan 1, 2016

  • SME-ICGCM
    Ground Control Design Considerations for Reducing Longwall?Induced Stress and Seismicity Associated with Massive Sandstone under Deep Cover

    By Daniel W. H. Su

    Thick, massive sandstone present in close proximity of the mining horizon can create difficult longwall caving issues, which may lead to severe face loading and subsequent face roof control problems.

    Jan 1, 2014

  • SME-ICGCM
    Influence of a Coal Mine Subsidence on An Adjacent Dam

    By Nengxiong Xu

    The WTZ coal mine is located adjacent to an auxiliary dam in P. R. China. The mining-induced ground movements are calculated using a 3-D numerical procedure based on the finite difference method (FDM)

    Jan 1, 2013

  • SME-ICGCM
    The Influence of the Protection Pillar Width on the Stability of the Gateroad

    By Wojciech Masny, Andrzej Walentek

    "The most common extraction method in Polish coal mines utilize pillars between adjacent longwall panels. This is mainly due to the significant depth and difficulties in maintaining stability of the g

    Jan 1, 2010

  • SME-ICGCM
    Risk Assessment Of Geotechnical Factors Associated With Underground Thick Seam Mining Methods

    By Bruce K. Hebblewhit

    Australia is well endowed with extensive reserves of thick underground coal scams, particularly in the range of 4.5m to 9m thicknesses. (For the purposes of this paper, thick scams are defined as bein

    Jan 1, 2001

  • SME-ICGCM
    The Development and Planning of Multiple Level Underground Limestone Mines

    By Bruce W. King, David A. Newman

    "Underground mines have always been an integral part of the limestone industry. However, beginning in the 1990s, the number of underground limestone mines has increased for many reasons including• Str

    Jan 1, 2016