Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Calibrating a Caving Model for Sedimentary Deposits-estimation of Load Distribution between Gob and Abutment
By Thierry Lavoie, Mark K. Larson
"Engineers at the National Institute for Occupational Safety and Health (NIOSH) and Itasca Consulting Group, Inc., conducted a study to determine the procedure for calibrating a caving model implement
Jan 1, 2016
-
User-Friendly Finite Element Design of Main Entries, Barrier Pillars, and Bleeder Entries
By William G. Pariseau, Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson
"This contribution describes development and application of a user-friendly finite element program, UT3PC, to address three important problems in underground coal mine design: (1) safety of main entri
Jan 1, 2017
-
Occurrence, Predication, and Control of Coal Burst Events in the U.S.
By Stephen C. Tadolini, Anthony T. Iannacchione
"Coal burst represented a major hazard for some U.S. mining operations. This paper provides an historical review of the coal burst hazards, identifies the fundamental geological factors associated wit
Jan 1, 2015
-
Investigating the Contributing Factors to Rib Fatalities Through Historical Analysis
By Tristan H. Jones
Rib-related accidents in underground coal mines continue to cause injuries and take lives at a rate of 1.3 fatalities per year for the last 17 years. Prevention of these accidents cannot simply be a m
Jan 1, 2014
-
Tekcrete Fast®: Fiber-Reinforced, Rapid-Setting Sprayed Concrete for Rib and Surface Control
By Stephen C. Tadolini, Minova USA Inc., Peter S. Mills, David R. Burkhard
"Fiber-reinforced spayed concrete has been used for several years in civil and tunneling operations. Research conducted to reduce cure times and increase compressive and flexural strengths resulted in
Jan 1, 2017
-
Analysis of the Design and Performance Characteristics of Pumpable Roof Supports
By Timothy Batchler
"Pumpable roof supports are currently being used to provide a safe working environment for longwall mining. Because different pumpable supports are visually similar and installed fundamentally in the
Jan 1, 2016
-
The Technical Progress and Problems to Be Solved of Thick Coal Seam Mining in China
By Jiacheng Wang
The current state of thick seam coal mining methods is illustrated in three typical cases of thick seam longwall mining, each pointing out the outstanding achievements in top-coal caving mining and la
Jan 1, 2011
-
Evaluation of Seismic Potential in a Longwall Mine with Massive Sandstone Roof under Deep Overburden
By Joe Wickline, Mark A. Van Dyke, Wen H. Su
"Geological factors and mine design contribute to mining-induced seismic activity, and this is especially true in longwall mining. Massive rock units are a key cause of seismic activity due to catastr
Jan 1, 2017
-
Safe, Efficient, and Cost-Effective Support of Longwall Cut through Entries
By John R. Poland, Benjamin Mirabile
"There are significant ground support hazards to both personnel and equipment when longwall equipment must mine through cross-panel entries. Backfilling support strategies are often cost prohibitive.
Jan 1, 2016
-
Biaxial Horizontal Swelling Strains in West Virginia Coal Mine Roof Rocks in Response to Moisture Adsorption
By Monte R. Hieb
Study of moisture-induced swelling strain in Pennsylvanian Period rocks of the Appalachian Plateau in West Virginia shows a 2:1 biaxial horizontal anisotropy which trends NW-SE. Oriented in-situ slabs
Jan 1, 2013
-
An Alternative for More Productive Rib Bolting in Underground Mining Applications
By Joe E. Bryan, John P. McDonnell
"Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib
Jan 1, 2015
-
Mechanics of Horizontal Movements Associated with Coal Mine Subsidence in Sloping Terrain Deduced From Field Measurements
By Ken W. Mills
The ground movements associated with underground coal mining and, in particular, longwall mining, are recognised to include horizontal subsidence movements, but the mechanics of the processes that cau
Jan 1, 2014
-
Unanticipated Multiple Seam Stresses From Pillar Systems Behaving As Pseudo Gob - Case Histories
By Michael Gauna, Christopher Mark
"Underground coal mining in the U.S. is conducted in numerous regions where previous workings exist above and/or below an actively mined seam. Miners know that overlying or underlying fully extracted
Jan 1, 2016
-
Roof Movement and Loading for Top-Coal Caving Longwall Mining in Extremely Inclined Thick Coal
By Shengliyang Yang, Jinghu Yang, Jiachen Wang, Xiaomeng Li
"Safe and efficient mining of extremely inclined thick coal seams less than 20m thick is one of the new challenges in China coal industry. In recent years, the extremely inclined thick coal seams have
Jan 1, 2016
-
Numerical Analysis of the Effect of Coal Seam Characteristics on the Longwall Top Coal Cavability
By Rudrajit Mitra, Tien Dung Le, Chengguo Zhang, Bruce Hebblewhite, Joung Oh
"Geomechanical and geotechnical characteristics of coal seam are important parameters that directly affect the cavability of top coal in the longwall top-coal caving (LTCC) method. The impact of these
Jan 1, 2017
-
Simulated Materials Modeling And Analysis Of The Overburden Strata Movement In Top Coal Caving Mining
By Zhou Ying
Based on the mining condition and roof lithology of the 2-3 coal seam at Gengcun Mine, the simulated materials modeling method was used to study the movement process and characteristics of overburden
Jan 1, 2001
-
Field Measurements of Overburden and Chain Pillar Response to Longwall Mining
By Daniel W. H. Su
Current longwall pillar design relies heavily upon past experience and many assumptions about pillar and entry response to longwall abutment pressures. Caving characteristics of the immediate and main
Jan 1, 1987
-
Application of Thin Spray on Liner (Masterseal) at Longwall T-Junction Sections in German Hard Coal Mines
By Uwe Wyink, Guenther Thiele, Isabel Gollnick, Klaus Thyrock
"The application of a thin spray on liner was implemented in longwall T-junction sections in 2009 for the first time. The development of the material and the application is based on a technical cooper
Jan 1, 2010
-
Ground Control Monitoring of Retreat Room-and-Pillar Mine in Central Appalachia
By William J. Conrad, Ryan J. Molka, Erik C. Westman
"In order to study pillar and overburden response to retreat mining, a ground control program was conducted at a Central Appalachian mine. The program consisted of several monitoring methods including
Jan 1, 2016
-
Progress in Managing the Geotechnical Aspects of Longwall Face Recovery
By David Hill
"End of panel longwall face recovery is almost certainly the most involved recurring geotechnical problem faced by operators, with major loss potential should problems occur. The paper presents Austra
Jan 1, 2010