Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Slipforming The Bath County ShaftsBy William D. Leech, Peter S. Buskirk
Virginia Electric and Power Company commencing in early 1985 will begin operating the Bath County Pumped Storage hydroelectric facility, presently the largest capacity installation of its kind. Six co
Jan 1, 1985
-
Cationic Flotation of Oxides and SilicatesBy Ross W. Smith, Salim Akhtar
Flotation of oxide minerals, particularly silicates, with cationic collectors differs substantially from classic flotation of sulfide minerals using sulfhydryl collectors. In the case of cationic flot
Jan 1, 1976
-
Neural Network Based Optical Sensors for Metal WeldsBy Darryl Amick, Keith A. Prisbrey, Lee E. Plansky
The problem addressed was to develop automated image analysis of metal welds to replace unreliable and costly 100% visual inspection. The objective was to evaluate neural networks combined with featur
Jan 1, 1993
-
Preliminary design of a solvent extraction process for the galvanic stripping of iron from D2EHPABy C. M. Chang, H Gu, J. A. Barrera-Godínez, T. J. O’Keefe
The inability to economically separate Fe3+(aq) from a variety of liquid effluents is a major Concern for the primary metals industry. A unique solvent extraction process, galvanic stripping, has been
Jan 1, 2000
-
Validation Of The Truck/Shovel Simulation ModelBy V. Srajer
The loading and hauling equipment simulation model was developed to satisfy, the requirements and need of the mining industry in western Canada. It is expected the model will be used to determine the&
Jan 1, 1989
-
A Parametric Study of Column Flotation of Florida PhosphatesBy Y. H. Cheng, H. EI-shall, S. Gupta, N. A. Abdel-Khalek
A 14.6 cm (5.75 in.) diameter by 1.83 m (6 ft) tall laboratory-size column is used in flotation of Florida phosphates of different feed sizes. In this paper, the effects of different parameters on the
Jan 1, 1999
-
Rock Mechanics Research Decreases Longwall Bump Potential At A Southern Appalachian Coal MineBy T. M. Barton, M. Gauna, A. A. Campoli
Coal mine bumps, the violent failures of overstressed coal, present a safety hazard to miners when longwall mining is conducted in deep, bump-prone coal mines. Two different longwall gate entry system
Jan 1, 1993
-
Combining Slurry Trench And Dewatering For A Large Deep ExcavationBy J. Patrick Powers, Joel Miller, Arthur B. Corwin
A combination of a slurry trench with dewatering successfully controlled groundwater for a large sloped excavation immediately adjacent to the Arkansas River. The Murray Hydro Electric Project require
Jan 1, 1989
-
Formulation And Solution Of The Dragline And Pit Width Selection Problem Allowing Variable Pit Widths For Varying Overburden Depth And Coal Seam Thickness - IntroductionBy Edward L. Mooney
In the, West, walking draglines often offer the least cost method of uncovering coal for surface mines. However, with each of these machines costing millions of dollars, a good deal of analysis can be
Jan 1, 1982
-
Newmont Gold Outlines its Mine Planning ProceduresBy Stephen P. Winkelmann
The expansion of gold production in Nevada's Carlin Trend over the last few years has been staggering. To increase gold production while minimizing capital requirements and providing for the safe
Jan 1, 1990
-
Clays: A Review of 1994 ActivitiesBy L. A. Arrington-Webb
Forty-four states produced clay products during 1994 for a total value of $1.6 billion. This was a 3% increase in total tonnage and a 7% increase in value from 1993. Kaolin Domestic production o
Jan 1, 1995
-
Leaching Of Selenides And Tellurides - Anodic Slimes From Electrolytic Copper RefiningBy Fathi Habashi
SELENIUM AND tellurium are by-products of electrolytic copper refining. Copper anodes contain 0.01-0.2 % Se and up to 0.04 % Te; during electrolysis these deposit as a slime at the bottom of the cell.
Jan 1, 1970
-
Innovative shaft lining methodBy R. F. Kovar, R. N. Torbin
Foster-Miller has recently developed a new concept for a highly specialized shaft lining system. This innovative shaft lining system uses a continuous slip forming placement technique, lining the shaf
Jan 1, 1990
-
The Henderson Coarse Ore Conveying System-A Review of Commissioning, Start-Up, and OperationBy Walter Küng
The Henderson Coarse Ore Conveying System is a three flight belt conveyor system transporting primary crushed molybdenum ore 24 km (15 miles) underneath the North American Continental Divide. One of t
Jan 1, 2004
-
The Art and Science of Operator-Less, Plant-Floor, Advanced Rougher Flotation ControlBy Lynn B. Hales, Randy Ynchausti, Jeffrey D. Mckay
Many consider rougher flotation control to be more of an art than a science. Some have even thought it impossible to make process control decisions and changes without human interaction. Controlling f
Jan 1, 2000
-
Measuring And Controlling Energy UtilizationBy D. Harney
Accurate measurement, tracking, and planning are vital for efficient utilization of energy in any mining operation, the major focus of this paper. This can be done with a number of assessments: 1)
Jan 1, 2007
-
The Application of an Expert System to Control Mine Ventilation at the Taiheiyo Coal Mine Under the Open SeaBy Ken Takahashi, Yuuich Umeki, Masahiko Arakawa, Dr. Tominaga. Yuusaku
Macroscopic characteristics of a complicated mine ventilation is remarked to build an expert system for mine safety in the Taiheiyo coal mine, Hokkaido, Japan. To gain the characteristics a large numb
Jan 1, 1989
-
Wenmec/Outokumpu Technology Update Of Current Developments For Anode Slime Precious Metals TreatmentBy Olli Järvinen
The precious metal refinery process is divided into the five process stages: 1 .copper/nickel leaching in autoclave 2. selenium roasting furnace 3. doré metal smelting furnace 4. silver electrolys
Jan 1, 1995
-
Planning and Design of the Bay TunnelBy Johanna I. Wong, R. John Caulfield, Victor S. Romero
The existing Hetch Hetchy water system, owned and operated by the San Francisco Public Utilities Commission (SFPUC), serves 2.4 million people within the San Francisco Bay Area. The system has existin
Jan 1, 2007
-
The Blue Mountains Sewerage Scheme A Case History of the Hazelbrook to Katoomba TunnelsBy David Logan, Sigurdur Finnsson
This project, which is intended to provide effective sewerage services to the Blue Mountains community, is located in the Blue Mountains National Park, about 60 km west of Sydney, Australia. The sewer
Jan 1, 1995