Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Effect of high grades on the geostatistical estimation of gold deposits

    By N. Champigny

    The geostatistical estimation of the reserves of an ore deposit is highly dependent on the quality and stability of the variograms of the sample grades. Gold deposits commonly show a skewed grade dist

    Jan 1, 1991

  • SME
    BHP Copper's Lower K Hoist Conversion: Deeper, Faster, More Efficient

    By K Louie

    When BHP Copper's Lower Kalamazoo Project commenced production in January 1997, two of the four original hoists had been converted to hoist ore from the Lower K level. Conversions on these hoists

    Jan 1, 1998

  • SME
    Financing A Small Mine Acquisition ? Introduction

    By James H. Boettcher

    In the second quarter of 1979, ASL Inc. inquired whether Crocker National Bank ("CNB") would provide $4 million in term loan financing to help ASL acquire the outstanding shares of the S&S Coal Compan

    Jan 1, 1981

  • SME
    Trends In Sensor And Control System Development For Iron Ore Beneficiation

    By M. J. Laurila

    The concentration of low grade iron ores to pellets or sinter fines suitable for blast furnace feed or direct reduction is highly energy intensive and costly in terns of both size reduction and separa

    Jan 1, 1984

  • SME
    Coal Quality Impacts On Power Plant Operations With Gillette Area Coal

    By J. E. deMasi

    Over the past 12 years, Exxon Coal U.S.A., Inc. has shipped over 150 million tons of coal from two mines, Rawhide and Caballo, located in the Gillette, Wyoming, area. These mines are operated by The C

    Jan 1, 1989

  • SME
    Evaluation Of Dust Control For Deep Cut Coal Mining Systems Using A Machine Mounted Dust Collector

    By Robert A. Haney, David J. Atchison, Kenneth G. Fields

    Mining systems with greater than a 20-foot face advance (deep cut) have become popular due to their increased productivity and safety. The face dust collection system used in many of the mines employi

    Jan 1, 1991

  • SME
    Construction Uses - Stone, Conservation

    By Erhard M. Winkler

    The rapid decay and disfiguring of stone monuments in urban and desert rural areas has challenged conservators to protect stone surfaces from premature decay. They attempt to halt the natural process

    Jan 1, 1994

  • SME
    Heap Leaching As A Unit Process

    By Harry R. Dahlberg

    Heap leaching is discussed as a unit process. Five factors are identified as the principal elements that can be measured and/or controlled. These are: 1. Material Size 2. Volume of solution 3. Tonnage

    Jan 1, 1979

  • SME
    Asarco Mineral Creek Tunnel

    By Shane Yanagisawa

    The Mineral Creek Diversion Project is at the Asarco Ray Mine Complex, about128 km (80 miles) east of Phoenix, Arizona. The new tunnel will intercept the waters of Mineral Creek about 2,134 m (7,000 f

    Jan 1, 2001

  • SME
    A Mixed Integer Linear Programming Approach To Limestone Quarry Scheduling Optimization With Sequencing And Blending Constraints

    A linear programming model with integer sequencing variables is developed to schedule limestone production for a quarry in Central Japan. The model is used to optimize raw material production from the

    Jan 1, 2003

  • SME
    Sustainability In Small Scale Mining

    Since the Rio Declaration on Environment and Development in 1992 in Rio de Janeiro and the publication of the agenda 21, the concept of Sustainable Development has become one of the major issues for g

    Jan 1, 2007

  • SME
    Near Pit Crushing And Conveying At Black Thunder Mine

    By Kenneth Ronald Miller

    Thunder Basin Coal Company's Black Thunder Mine is located 80 km (50 miles) southeast of Gillette, Wyoming in the Powder River Basin. Surface coal mining operations began in 1977. The Black Thund

    Jan 1, 1989

  • SME
    The Optimum Configuration Of A Cip Circuit

    By Mark W. Johns

    The design or optimization of a carbon-in-pulp (CIP) plant requires the determination and setting of a number of parameters to ensure optimum economic performance. A number of these parameters are eit

    Jan 1, 1995

  • SME
    Discussion - Novel design for a thin seam shuttle car featuring an ergonomic operator compartment - by A.G. Mayton, J.R. Bartels, and W.D. Mayercheck Technical Papers. Mining Engineering, Vol. 41, No. 11 November- 1990,pp. 1132-1134

    By A. G. Mayton, L. Adler

    The paper under discussion provides an excellent and concise study of compartment ergonomics for thin seam equipment. However, in accomplishing this, some very important operational aspects were ignor

    Jan 1, 1991

  • SME
    Discussion – Novel Design For a Thin Seam Shuttle Car Featuring an Ergonomic Operator Compartment – Technical Papers, Mining Engineering, Vol. 41, No. 11, November 1990, pp. 1132-1134 – Mayton, A. G., Bartels, J. R. and Mayercheck, W. D.

    By L. Adler

    The paper under discussion provides an excellent and concise study of compartment ergonomics for thin seam equipment. However, in accomplishing this, some very important operational aspects were ignor

    Jan 1, 1990

  • SME
    Recovery Of Fine-Size Coal From Impounded Wastes

    By J. Hanna, R. Kalathur

    Over the years, Alabama's coal industry has generated, during mining and cleaning operations, about 150 million st of fine waste coal, with this total increasing at a rate of 2 million stpy. Recl

    Jan 1, 1993

  • SME
    Coal availability studies: Fruitland and Menefee Formations, San Juan Basin, New Mexico

    By G. E. Jones, G. K. Hoffman

    Two Sun Juan Basin studies were completed through the USGS National Coal Availability program. The study areas are in the northwest Bisti field (Fruitland Formation) and in the eastern Standing Rock f

    Jan 1, 2002

  • SME
    Cost Estimation for Sublevel Stoping-A Case Study *

    By A. J. Richardson

    Before the development of the underground stoping and mining costs can be considered, certain facts about the ore body, the proposed mine, markets, etc., must be known or determined. In the case to

    Jan 1, 1982

  • SME
    Detection and prediction of overload conditions in ball mill grinding

    By J. A. Herbst, C Lo. Y, Z. Rogovin

    The identification and quantification of incipient overload conditions in mills have recently been found to be very significant in the design of tumbling grinding mills. To investigate these phenomena

    Jan 1, 1988

  • SME
    Dissolution Behavior Of Cobalt In Iodine/Iodide Solutions

    By K. N. Han

    The dissolution kinetics of cobalt in iodine/ iodide solutions were investigated using a rotating-disc technique. Variables studied included temperature, rotating speed, concentration of lixiviants an

    Jan 1, 1995