Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Application And Advantages Of Side Dump Principle In Underground Development And Production LoadingBy Donald E. Hendrickson
A new prinicple of side dumping front end loading for underground mucking machines has completely changed the concept of underground loading and haulage equipment arrangement both in production and de
Jan 1, 1966
-
Basic Elements In The Economics Of An Open Pit DesignBy Guillermo V. Borquez
The economics of open pit mine design are dictated by three basic elements: cut-off grade, stripping ratio and slope angle. Although these elements are functions of a number of independent parameters,
Jan 1, 1977
-
Rubber-Collared Drill SteelBy Joel K. Waterland
The Homes take Mining Company at Lead, South Dakota has a yearly production of 1,868,741 tons of ore produced from horizontal cut-and-fill stopes and timber cut-and-fill stopes. This production, in ad
Jan 1, 1963
-
Extrusion Agglomeration Of Fine CoalBy G. E. Wasson
Consolidation Coal Co. tested the agglomeration of fine coal using a laboratory pellet mill. The principal operating variables examined were feed coal moisture, coal size distribution, and additives t
Jan 1, 1991
-
The Henderson MineBy William G. Doepken
GENERAL DESCRIPTION The Henderson mine utilizes a highly mechanized, continuous panel-caving system to extract ore from a deep, massive, molybdenum deposit. The mine site, lo¬cated 80.5 km (50 mile
Jan 1, 1982
-
A Preliminary Evaluations of a Through-The-Earth (TTE) Communications System at An Underground Coal Mine in Eastern KentuckyBy C. J. Weiss
"A commercially available Through-the-Earth (TTE) communications system was evaluated at an underground coal mine in eastern Kentucky. This field study was conducted as part of a larger multi-site eva
Jan 1, 2015
-
Using a Dual Interchange Algorithm to Evaluate the Effect of Stope Size on Economic Value in Planning an Underground Sublevel Open-Stoping LayoutBy Cuthbert Musingwini, Adeodatus S. Nhleko, Mahlomola I. Mabala
Optimization of a three-dimensional (3D) underground stope layout is complex given the number of variables and constraints to consider, such as the stope size. Determination of the appropriate stope s
Jun 25, 2023
-
Geology Of The Wind Mountain Nepheline Syenite Deposit, Cornudas Mountains, Otero County, New MexicoBy V. T. McLemore
The Wind Mountain (WM) nepheline syenite deposit is part of the alkalic complex in the Cornudas Mountains, which ranges in age from 34.6 ± 1.5 Ma to 36.8 ± 0.6 Ma. The WM deposit consists of a complex
Jan 1, 1994
-
Positive set value system for hydraulic powered supportsBy J. B. Gwiazda
Maintenance of a constant load setting throughout longwall support units and selection of the proper initial bearing capacity depending on the type of roof strata are the basic factors that ensure goo
Jan 1, 1990
-
The Effect Of Subsidence On PipelinesBy James G. Tilton
Subsidence resulting from mining operations, has been the object of sporadic study for many years. Reports have shown that subsidence has ranged from minor settlement detected only by precise measurem
Jan 1, 1966
-
Impact Of Using Auxiliary Fans On Coal Mine Ventilation Efficiency And CostBy Keith G. Wallace
Coal mine ventilation systems are often subject to high leakage rates. As a result, changes in airflow resistance will strongly affect the efficiency with which air is delivered to the working place.
Jan 1, 1986
-
Process Computer Experience In Phosphate Beneficiation ? IntroductionBy Peter F. Mataich
The phosphate mining industry is a highly competitive one, one in which survival depends on the plant's ability to produce at costs equal to, or below, the competition. The solution toward gettin
Jan 1, 1969
-
Assessing The Impact Of A Residential Metals Abatement Program On Child Blood Lead Levels In Butte, Mt - SME Annual Meeting 2022By C. Van Landingham, A. Bailey, R. A. Schoof
A residential metals abatement program has been underway in Butte for more than 20 years. More than 1,350 yard and attic cleanups were completed by the end of 2018; most triggered by lead. While the f
Mar 2, 2022
-
Changes In Importing Chinese BariteBy A. V. Castelli
The provinces of Guangxi, Guizhou, Hubei (and most recently Fujian) were the prime exporters of barite during this period. Guangdong and Shandong were exporters too but not major participants. These a
Jan 1, 1990
-
Study On Mesozoic Carbonates Of The Ionian Zone And Their Petroleum Potential Based On Stable Isotopes, Total Organic Carbon, SEM And Clay Minerals (NW Greece)By K. Getsos
Western Greece is a favorable site for exploration and discovery of oil fields. The most important potential source rocks seem to be all the rocks deposited before middle Jurassic under special circum
Jan 1, 2006
-
Degradation of metal cyanide complexes by microorganismsBy R. Fedel-Moen, R. W. L. Kimber, B. D. Williams, S. R. Ragusa
The use o f cyanide to extract gold from ores is widespread. In the process of extracting gold, cyanide may form metal cyanide complexes with a variety of other metals present in the ore. This study w
Jan 1, 2000
-
Criteria For Choosing Drilling Equipment For Rapid Tunneling In Hard RockBy Gösta W. Diehl
During the past five years the use of all-hydraulic drilling equipment has increased rapidly, and we have now reached a point where the hydraulic drill has become an alternative to be seriously consid
Jan 1, 1979
-
Global Warming – An Engineering AppraisalBy Raphael G. Kazmann
The predicted warming of the earth's surface, presently the subject of much debate, controversy and legislation, is based on what is termed "the greenhouse effect." This is the result of the prop
Jan 1, 1992
-
Ultra-Long Tunnel Drive with TBM for the Construction of the Mineral Transport for the Woodsmith Project Polyhalite Mine - NAT2024By Karin Bäppler
A new polyhalite fertilizer mine is currently being developed in the UK by Anglo American Crop Nutrients. The project includes the construction of a Mineral Transport Tunnel almost 37 kms long to hous
Jun 23, 2024
-
Wet Scrubbing Of Coal Dust From Thermal DryersBy Thomas Gleason
Wet scrubbing of fine coal from Thermal dryers poses a number of problems in adapting the gas cleaning equipment for required clean-up of the fine particulate matter. Among then are: 1. The dust
Jan 1, 1962