Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Pit optimization on clustered realizations: Identifying functional scenarios

    By Tyler Acorn, Brandon Wilson, Jeff Boisvert

    Project-scale decisions in surface mining operations rely on the optimization and subsequent evaluation of pit limits. This process ignores the ability for mine plans to adapt as more information is g

  • SME
    Pre-Excavation Grouting Through Water Bearing Zone Under High Pressure Under Extreme Flow Conditions

    By Adam Shang Robert Fu

    The Yung-Chung-Tunnel in Taiwan, constructed for the Taiwan-East Railway Bureau, collapsed during construction when a water bearing, fractured marble zone was intersected. The inflow was approximately

    Jan 1, 2007

  • SME
    Getchell Mine Pressure Oxidation Circuit Four Years After Startup

    By Dale Matthews

    The Getchell Mine, near Winnemucca, NR, was discovered in the 1930s and was initially mined to recover gold from oxide ores. During the 1940s and 1950s, gold was recovered from the highly refractory a

    Jan 1, 1994

  • SME
    Closing the Historic Alaska-Juneau Mine

    By Joseph L. Petrillo

    In July 1997, Kvaerner Environmental signed a unique contract with Echo Bay Alaska called the Transfer Risk and Accelerate Closure (TRAC). The contract called for Kvaerner to assume the responsibilit

    Jan 1, 1999

  • SME
    Galena Mine - Discovery of Silver-Copper Ore in the Galena Mine in the Coeur d'Alene Mining District of Northern Idaho

    By S. Norman Kesten

    The Galena mine is located astride the Polaris fault in the Coeur d'Alene district of northern Idaho. The surface installations are about a mile up Lake Gulch, the mouth of which is about 2.4 km

    Jan 1, 1990

  • SME
    Improved Methodology For Contact Angle Measurements On Coal (Heterogeneous) Surfaces

    By J. Drelich, M. Pawlik

    An improved experimental procedure to measure contact angle has been consolidated with coal surface preparation involving polishing with abrasive paper, alumina powder, and a cloth, followed by ultras

    Jan 1, 1999

  • SME
    The Brand-New Global Prevention Strategy of ISSA Mining for Safety and Health in Mining Safety 7.7 – 7 Golden Rules to Vision Zero

    By H. Ehnes

    "“Industry 4.0” – “Mining 4.0” - perhaps you have already heard of these terms? These keywords signify the next stage of industrial production. The internet and production technologies are growing clo

    Jan 1, 2016

  • SME
    Towards The Complete Double Parameterization Of Recovered Reserves In Open Pit Mining - Introduction

    By Kadri Dagdelen

    Design of the ultimate pit limit to direct long range mine planning has been a celebrated problem in the mining industry, and in mining academia, since 1965. Although many papers have been presented o

    Jan 1, 1982

  • SME
    Origin Of The Problem: Rapporteur?s Report ? Introduction

    By Malcolm Ross

    The Reserve Mining Co., in the processing of taconite iron ore quarried from the Peter Mitchell Pit, deposited the finely crushed waste rock into Lake Superior near Silver Bay Minnesota. In the early

    Jan 1, 2007

  • SME
    Record Performance Of TBM In The 13.5 Km Amlach Tunnel, Austria

    By Hans Janzon, Ernst Buechi

    INTRODUCTION The headrace tunnel in Amlach is part of a hydro electric power scheme near the city of Lienz in south west Austria. The project is owned and developed by Tiroler Wasserkraftwerke AG,

    Jan 1, 1987

  • SME
    Stability Prediction And Performance Of Highwall Steepening In Weak Rock

    By D. R. Brox, J. Levell

    The Montana Tunnels Mine was mined out to a depth of 900 feet at the end of 1999. The first signs of instability were recognized in 1996 along the upper slope area of the northwest sector when the pit

    Jan 1, 2001

  • SME
    Simulation of thermal effects on the flow field in a pilot-scale kiln

    By B. DANIEL MARJAVAARA, I. A. SOFIA LARSSON, ANNA-LENA LJUNG

    One way to upgrade iron ore is to process it into pellets. The pelletizing process is multifaceted, involving complex fluid dynamics with highly turbulent, high-temperature flow in intricate geometrie

  • SME
    A scale model experimental study for estimating the productivity of bulk push dozer operations in hard-rock mining (MME Technical-Paper Abstracts)

    By MEHMET KIZIL, PETER KNIGHTS, ROYAL REA

    A 1/20 scale experimental dozer push test rig was designed and constructed to quantify the expected production rates (loose cubic meters per hour) for dozers operating in hard-rock bulk push applicati

  • SME
    Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest Interceptor

    By Samuel J. Gambino

    Preliminary recommendations for the Upper Northwest Interceptor 1&2 specified installation of reinforced concrete pipe using pipe-jacking methods. However, a larger one-pass tunnel constructed using p

    Jan 1, 2008

  • SME
    Information Technology Aids Soda Springs Phosphate Mine

    By Randy Vranes

    Sophisticated information technology, quality management systems and a commitment to the environment has allowed Solutia’s Soda Springs phosphate mine and elemental phosphorus plant to reduce operatin

    Jan 1, 1999

  • SME
    Industrial Minerals 2004 - Diatomite

    By A. Founie

    The United States continues to be the world’s leading producer and consumer of diatomite. Production of diatomite in the United States during 2004 was estimated to be 635 kt (700,000 st). This was a

    Jan 1, 2005

  • SME
    The OCC Process: A New Method for Near Net and Net Shape Casting

    By Hiroshi Soda, Atsumi Ohno, Hiroyuki Yamazaki, Alexander McLean

    INTRODUCTION The method of heat removal during a casting process strongly influences the crystal morphology of the cast product and hence the metallurgical and mechanical properties of the solidif

    Jan 1, 1990

  • SME
    Gas Monitor Simulator Development And Mine Rescue Contest Field Trials

    By D. W. Alexander

    Researchers from the Office of Mine Safety and Health Research (OMSHR) of the National Institute for Occupational Safety and Health (NIOSH) completed field trials during coal mine rescue contests usin

    Jan 1, 2011

  • SME
    Support Of The Leipzig City—Tunnel Extension Using A Tie-Back Supported Freeze Wall

    By Helmut Hass, Michael B. Gilbert

    The extension of the commuter railway system (S-Bahn) in Leipzig, Germany willrequire the construction of an underground line crossing the downtown area of thecity to tie the Bavarian Station in the S

    Jan 1, 2007

  • SME
    L-73 Tunnel, Woodbury, Minnesota

    By Michael B. Gilbert

    The Woodbury L-73 Tunnel involved the design and construction of a 96-inch tunnel driven through 8,080 lf of very difficult ground conditions. Anticipated ground and groundwater conditions consisted o

    Jan 1, 2008